Running head: PROJECT MANAGEMENT
Project: Replacement of Darling Harbour Swing Bridge
Name of the Student
Name of the University
Author’s Note
Project: Replacement of Darling Harbour Swing Bridge
Name of the Student
Name of the University
Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1
PROJECT MANAGEMENT
Table of Contents
1. Tender Documentation...........................................................................................................2
1.1 Statement of Work.......................................................................................................2
1.1.1 Introduction...............................................................................................................2
1.1.2 Project Scope.............................................................................................................2
1.1.3 Period of project performance...................................................................................2
1.1.4 Work requirements....................................................................................................3
1.1.5 Schedule....................................................................................................................4
1.1.6 Acceptance criteria....................................................................................................5
1.2 Work breakdown Structure..............................................................................................6
1.3 Milestone Schedule..........................................................................................................7
1.4 Cost estimates...................................................................................................................7
1.5 Quality assurance/Safety standards..................................................................................9
1.6 Procurement Strategy.....................................................................................................11
References................................................................................................................................13
PROJECT MANAGEMENT
Table of Contents
1. Tender Documentation...........................................................................................................2
1.1 Statement of Work.......................................................................................................2
1.1.1 Introduction...............................................................................................................2
1.1.2 Project Scope.............................................................................................................2
1.1.3 Period of project performance...................................................................................2
1.1.4 Work requirements....................................................................................................3
1.1.5 Schedule....................................................................................................................4
1.1.6 Acceptance criteria....................................................................................................5
1.2 Work breakdown Structure..............................................................................................6
1.3 Milestone Schedule..........................................................................................................7
1.4 Cost estimates...................................................................................................................7
1.5 Quality assurance/Safety standards..................................................................................9
1.6 Procurement Strategy.....................................................................................................11
References................................................................................................................................13
2
PROJECT MANAGEMENT
1. Tender Documentation
1.1 Statement of Work
1.1.1 Introduction
The paper mainly focuses on the replacement of Harbour Swing Bridge by SBM3320
Ltd that engages in inviting various tenders as well as eligible bidders for completing the
project work. The project work mainly involves replacing swing span, superstructure,
operator hose and fender system. In addition to this, it also involves in finishing the work
related with superstructure modification and electrical as well as mechanical overhaul. It is
identified that the time that is approved for finishing the entire superstructure as well as
Swing span is around 10 days so that the replacement of bridge does not create any type of
negative impact on the public. The entire project of Harbour swing replacement will be
finished in 62 days by utilizing the approved cost that is around AUD 31,474,000.
1.1.2 Project Scope
The scope of the project includes:
Replacement of Harbour swing Bridge
Completion of superstructure as well as swing span replacement within 10 days
Completion of project within 62 days by utilizing budget of around $31,474,000
Finishing the work associated with electrical and mechanical overhaul
1.1.3 Period of project performance
The replacement of Harbour swing will be finished within 62 days. It is identified that
the project will initiate on 11/09/2018 and it will be successfully finished within 05/12/2018.
PROJECT MANAGEMENT
1. Tender Documentation
1.1 Statement of Work
1.1.1 Introduction
The paper mainly focuses on the replacement of Harbour Swing Bridge by SBM3320
Ltd that engages in inviting various tenders as well as eligible bidders for completing the
project work. The project work mainly involves replacing swing span, superstructure,
operator hose and fender system. In addition to this, it also involves in finishing the work
related with superstructure modification and electrical as well as mechanical overhaul. It is
identified that the time that is approved for finishing the entire superstructure as well as
Swing span is around 10 days so that the replacement of bridge does not create any type of
negative impact on the public. The entire project of Harbour swing replacement will be
finished in 62 days by utilizing the approved cost that is around AUD 31,474,000.
1.1.2 Project Scope
The scope of the project includes:
Replacement of Harbour swing Bridge
Completion of superstructure as well as swing span replacement within 10 days
Completion of project within 62 days by utilizing budget of around $31,474,000
Finishing the work associated with electrical and mechanical overhaul
1.1.3 Period of project performance
The replacement of Harbour swing will be finished within 62 days. It is identified that
the project will initiate on 11/09/2018 and it will be successfully finished within 05/12/2018.
3
PROJECT MANAGEMENT
1.1.4 Work requirements
The replacement of Darling Swing Bridge will be finished within 62 days by
engaging in different phases of the project that are elaborated below:
Initiation phase: In the initiation phase of the project, the project manager engages in
developing the business case of the project depending on which the bridge will be replaced.
Proper feasibility analysis is undertaken in order to determine the feasibility that is associated
with the project. In addition to this, appointments of project stakeholders are also done in the
initiation phase of the project.
Planning phase: In the project-planning phase, the project manager is responsible for
developing financial plan, resource plan as well as risk management plan. In addition to this,
the communication plan is also created in this phase. It is identified that this phase is mainly
undertaken in order to assume the budget as well as resources that are required for finishing
the project successfully.
Execution phase: In the project execution phase, the project managers are responsible
of replacing the swing span, superstructure, operator hose and fender system. It is identified
that other additional work like finishing the work related with superstructure modification
and electrical as well as mechanical overhaul are finished in this phase.
Closure phase: In the project closure phase, the project manager is mainly
responsible of reviewing the entire project for making sure that all the activities are executed
effectively. Additionally, the stakeholder signs off as well as project documentation activities
are undertaken by the project manager for finishing the project.
PROJECT MANAGEMENT
1.1.4 Work requirements
The replacement of Darling Swing Bridge will be finished within 62 days by
engaging in different phases of the project that are elaborated below:
Initiation phase: In the initiation phase of the project, the project manager engages in
developing the business case of the project depending on which the bridge will be replaced.
Proper feasibility analysis is undertaken in order to determine the feasibility that is associated
with the project. In addition to this, appointments of project stakeholders are also done in the
initiation phase of the project.
Planning phase: In the project-planning phase, the project manager is responsible for
developing financial plan, resource plan as well as risk management plan. In addition to this,
the communication plan is also created in this phase. It is identified that this phase is mainly
undertaken in order to assume the budget as well as resources that are required for finishing
the project successfully.
Execution phase: In the project execution phase, the project managers are responsible
of replacing the swing span, superstructure, operator hose and fender system. It is identified
that other additional work like finishing the work related with superstructure modification
and electrical as well as mechanical overhaul are finished in this phase.
Closure phase: In the project closure phase, the project manager is mainly
responsible of reviewing the entire project for making sure that all the activities are executed
effectively. Additionally, the stakeholder signs off as well as project documentation activities
are undertaken by the project manager for finishing the project.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4
PROJECT MANAGEMENT
1.1.5 Schedule
The replacement of Harbour Swing will be finished within the timeframe of 62 days.
Additionally, it is found that the time that is required for finishing each of the project
activities are reflected in the table below:
Task Name Duration Start Finish
Replacement of Darling Harbour
Swing Bridge
62 days Tue 11-09-18 Wed 05-12-18
Project initiation phase 26 days Tue 11-09-18 Tue 16-10-18
Business case development 2 days Tue 11-09-18 Wed 12-09-18
Feasibility testing 1 day Tue 09-10-18 Tue 09-10-18
Project charter establishment 2 days Thu 11-10-18 Fri 12-10-18
Appointing project team members 1 day Tue 16-10-18 Tue 16-10-18
Milestone 1:Completion of project
initiation phase
0 days Tue 16-10-18 Tue 16-10-18
Project planning phase 16 days Wed 17-10-18 Wed 07-11-18
Project plan development 3 days Wed 17-10-18 Fri 19-10-18
Resource plan development 2 days Mon 22-10-18 Tue 23-10-18
Financial plan development 2 days Wed 24-10-18 Thu 25-10-18
Creation of project quality plan 3 days Fri 26-10-18 Tue 30-10-18
Risk management plan 2 days Wed 31-10-18 Thu 01-11-18
Communication plan 2 days Fri 02-11-18 Mon 05-11-18
procurement plan 2 days Tue 06-11-18 Wed 07-11-18
PROJECT MANAGEMENT
1.1.5 Schedule
The replacement of Harbour Swing will be finished within the timeframe of 62 days.
Additionally, it is found that the time that is required for finishing each of the project
activities are reflected in the table below:
Task Name Duration Start Finish
Replacement of Darling Harbour
Swing Bridge
62 days Tue 11-09-18 Wed 05-12-18
Project initiation phase 26 days Tue 11-09-18 Tue 16-10-18
Business case development 2 days Tue 11-09-18 Wed 12-09-18
Feasibility testing 1 day Tue 09-10-18 Tue 09-10-18
Project charter establishment 2 days Thu 11-10-18 Fri 12-10-18
Appointing project team members 1 day Tue 16-10-18 Tue 16-10-18
Milestone 1:Completion of project
initiation phase
0 days Tue 16-10-18 Tue 16-10-18
Project planning phase 16 days Wed 17-10-18 Wed 07-11-18
Project plan development 3 days Wed 17-10-18 Fri 19-10-18
Resource plan development 2 days Mon 22-10-18 Tue 23-10-18
Financial plan development 2 days Wed 24-10-18 Thu 25-10-18
Creation of project quality plan 3 days Fri 26-10-18 Tue 30-10-18
Risk management plan 2 days Wed 31-10-18 Thu 01-11-18
Communication plan 2 days Fri 02-11-18 Mon 05-11-18
procurement plan 2 days Tue 06-11-18 Wed 07-11-18
5
PROJECT MANAGEMENT
Milestone 2:Completion of project
planning phase
0 days Wed 07-11-18 Wed 07-11-18
Project execution phase 17 days Thu 08-11-18 Fri 30-11-18
Replacing the superstructure 4 days Thu 08-11-18 Tue 13-11-18
Replacing the swing span 6 days Thu 08-11-18 Thu 15-11-18
Making modifications within the
substructure
3 days Wed 14-11-18 Fri 16-11-18
Finishing the electrical overhaul 4 days Fri 16-11-18 Wed 21-11-18
Finishing the work of mechanical
overhaul
4 days Mon 19-11-18 Thu 22-11-18
Replacing the operator house 5 days Thu 22-11-18 Wed 28-11-18
Replacing the fender system 6 days Fri 23-11-18 Fri 30-11-18
Milestone 3: Completion of project
execution phase
0 days Thu 29-11-18 Thu 29-11-18
Project closure phase 3 days Mon 03-12-18 Wed 05-12-18
Post project review 2 days Mon 03-12-18 Tue 04-12-18
Stakeholder sign off 1 day Tue 04-12-18 Tue 04-12-18
Documentation 1 day Wed 05-12-18 Wed 05-12-18
Milestone 4:Completion of project
closure phase
0 days Wed 05-12-18 Wed 05-12-18
1.1.6 Acceptance criteria
The project acceptance criteria include:
Completion of the project that deals with replacing of harbour swing bridge
PROJECT MANAGEMENT
Milestone 2:Completion of project
planning phase
0 days Wed 07-11-18 Wed 07-11-18
Project execution phase 17 days Thu 08-11-18 Fri 30-11-18
Replacing the superstructure 4 days Thu 08-11-18 Tue 13-11-18
Replacing the swing span 6 days Thu 08-11-18 Thu 15-11-18
Making modifications within the
substructure
3 days Wed 14-11-18 Fri 16-11-18
Finishing the electrical overhaul 4 days Fri 16-11-18 Wed 21-11-18
Finishing the work of mechanical
overhaul
4 days Mon 19-11-18 Thu 22-11-18
Replacing the operator house 5 days Thu 22-11-18 Wed 28-11-18
Replacing the fender system 6 days Fri 23-11-18 Fri 30-11-18
Milestone 3: Completion of project
execution phase
0 days Thu 29-11-18 Thu 29-11-18
Project closure phase 3 days Mon 03-12-18 Wed 05-12-18
Post project review 2 days Mon 03-12-18 Tue 04-12-18
Stakeholder sign off 1 day Tue 04-12-18 Tue 04-12-18
Documentation 1 day Wed 05-12-18 Wed 05-12-18
Milestone 4:Completion of project
closure phase
0 days Wed 05-12-18 Wed 05-12-18
1.1.6 Acceptance criteria
The project acceptance criteria include:
Completion of the project that deals with replacing of harbour swing bridge
6
PROJECT MANAGEMENT
Finishing the work related with mechanical and electrical overhaul
To replace the swing span as well as the superstructures related with project
To make modifications within the superstructure of the project
1.2 Work breakdown Structure
Figure 1: Work Breakdown Structure
(Source: Created by Author)
The above work breakdown structure is provided is for the project “Darling Harbour
Bridge” replacement. The work breakdown structure that is provided below helps in visually
defining the scope of the project into number of manageable chunks so that the project team
can get idea about each level of the project (Siami-Irdemoosa, Dindarloo & Sharifzadeh,
2015). It is identified that work breakdown structure is mainly by identifying the main
PROJECT MANAGEMENT
Finishing the work related with mechanical and electrical overhaul
To replace the swing span as well as the superstructures related with project
To make modifications within the superstructure of the project
1.2 Work breakdown Structure
Figure 1: Work Breakdown Structure
(Source: Created by Author)
The above work breakdown structure is provided is for the project “Darling Harbour
Bridge” replacement. The work breakdown structure that is provided below helps in visually
defining the scope of the project into number of manageable chunks so that the project team
can get idea about each level of the project (Siami-Irdemoosa, Dindarloo & Sharifzadeh,
2015). It is identified that work breakdown structure is mainly by identifying the main
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7
PROJECT MANAGEMENT
functional project deliverables which are further sub-divided into smaller tasks and then
assigned to the project team members.
1.3 Milestone Schedule
The milestones of the project are provided in the table below with their completion
date.
Milestone Completion date
Milestone 1:Completion of project initiation phase Tue 16-10-18
Milestone 2:Completion of project planning phase Wed 07-11-18
Milestone 3: Completion of project execution phase Thu 29-11-18
Milestone 4:Completion of project closure phase Wed 05-12-18
1.4 Cost estimates
It is expected that the replaced of Harbour Swing bridge will be finished within the
budget of around AUD 31,474,000.00. The cost that is required for executing each of the sub
activities are reflected in the table below:
Task Name Duration Resource Names Cost
Replacement of Darling Harbour
Swing Bridge
62 days
AUD
31,474,000.00
Project initiation phase 26 days
Contractor,
Architect
AUD 26,160.00
Business case development 2 days Project planner AUD 2,080.00
Feasibility testing 1 day Project manager AUD 1,200.00
Project charter establishment 2 days Project planner AUD 2,080.00
PROJECT MANAGEMENT
functional project deliverables which are further sub-divided into smaller tasks and then
assigned to the project team members.
1.3 Milestone Schedule
The milestones of the project are provided in the table below with their completion
date.
Milestone Completion date
Milestone 1:Completion of project initiation phase Tue 16-10-18
Milestone 2:Completion of project planning phase Wed 07-11-18
Milestone 3: Completion of project execution phase Thu 29-11-18
Milestone 4:Completion of project closure phase Wed 05-12-18
1.4 Cost estimates
It is expected that the replaced of Harbour Swing bridge will be finished within the
budget of around AUD 31,474,000.00. The cost that is required for executing each of the sub
activities are reflected in the table below:
Task Name Duration Resource Names Cost
Replacement of Darling Harbour
Swing Bridge
62 days
AUD
31,474,000.00
Project initiation phase 26 days
Contractor,
Architect
AUD 26,160.00
Business case development 2 days Project planner AUD 2,080.00
Feasibility testing 1 day Project manager AUD 1,200.00
Project charter establishment 2 days Project planner AUD 2,080.00
8
PROJECT MANAGEMENT
Appointing project team members 1 day AUD 0.00
Project planning phase 16 days AUD 21,920.00
Project plan development 3 days Project manager AUD 3,600.00
Resource plan development 2 days Project planner AUD 2,080.00
Financial plan development 2 days Project manager AUD 2,400.00
Creation of project quality plan 3 days Project planner AUD 3,120.00
Risk management plan 2 days
Project manager,
Sub-contractor
AUD 4,320.00
Communication plan 2 days
Project manager,
Architect
AUD 4,320.00
procurement plan 2 days Project planner AUD 2,080.00
Project execution phase 17 days
AUD
31,421,760.00
Replacing the superstructure 4 days
Architect, Sub-
contractor
AUD 7,680.00
Replacing the swing span 6 days
Architect,
Contractor
AUD 10,560.00
Making modifications within the
substructure
3 days
Contractor,
Supervisor,
Material cost[1]
AUD
11,365,280.00
Finishing the electrical overhaul 4 days
Contractor, Sub-
contractor,
Supervisor
AUD 10,880.00
Finishing the work of mechanical 4 days Architect, AUD
PROJECT MANAGEMENT
Appointing project team members 1 day AUD 0.00
Project planning phase 16 days AUD 21,920.00
Project plan development 3 days Project manager AUD 3,600.00
Resource plan development 2 days Project planner AUD 2,080.00
Financial plan development 2 days Project manager AUD 2,400.00
Creation of project quality plan 3 days Project planner AUD 3,120.00
Risk management plan 2 days
Project manager,
Sub-contractor
AUD 4,320.00
Communication plan 2 days
Project manager,
Architect
AUD 4,320.00
procurement plan 2 days Project planner AUD 2,080.00
Project execution phase 17 days
AUD
31,421,760.00
Replacing the superstructure 4 days
Architect, Sub-
contractor
AUD 7,680.00
Replacing the swing span 6 days
Architect,
Contractor
AUD 10,560.00
Making modifications within the
substructure
3 days
Contractor,
Supervisor,
Material cost[1]
AUD
11,365,280.00
Finishing the electrical overhaul 4 days
Contractor, Sub-
contractor,
Supervisor
AUD 10,880.00
Finishing the work of mechanical 4 days Architect, AUD
9
PROJECT MANAGEMENT
overhaul
Contractor,
Supervisor,
Equipment cost[1]
10,010,880.00
Replacing the operator house 5 days
Contractor, Sub-
contractor,
Additional cost[1]
AUD
10,005,920.00
Replacing the fender system 6 days
Architect,
Contractor
AUD 10,560.00
Project closure phase 3 days AUD 4,160.00
Post project review 2 days Supervisor AUD 1,920.00
Stakeholder sign off 1 day Project planner AUD 1,040.00
Documentation 1 day Project manager AUD 1,200.00
1.5 Quality assurance/Safety standards
Project process Process quality
standard /
Stakeholder
expectation
Quality
assurance
activity
Frequency Responsible
Developing
plan for the
project risk
The project
related risks
must be proper
identified so that
proper
mitigation plan
Proper review
of the project
must be
undertaken for
identifying the
risks that are
The peer review
of the project
related risks
must be done on
a regular basis
so that no
The risk analyst
is considered as
the most
responsible
person.
PROJECT MANAGEMENT
overhaul
Contractor,
Supervisor,
Equipment cost[1]
10,010,880.00
Replacing the operator house 5 days
Contractor, Sub-
contractor,
Additional cost[1]
AUD
10,005,920.00
Replacing the fender system 6 days
Architect,
Contractor
AUD 10,560.00
Project closure phase 3 days AUD 4,160.00
Post project review 2 days Supervisor AUD 1,920.00
Stakeholder sign off 1 day Project planner AUD 1,040.00
Documentation 1 day Project manager AUD 1,200.00
1.5 Quality assurance/Safety standards
Project process Process quality
standard /
Stakeholder
expectation
Quality
assurance
activity
Frequency Responsible
Developing
plan for the
project risk
The project
related risks
must be proper
identified so that
proper
mitigation plan
Proper review
of the project
must be
undertaken for
identifying the
risks that are
The peer review
of the project
related risks
must be done on
a regular basis
so that no
The risk analyst
is considered as
the most
responsible
person.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10
PROJECT MANAGEMENT
or strategy is
created for
mitigating the
risks
successfully.
related with the
project.
project related
risk can create
any type of
negative impact
on the project.
Use of proper
quality of
materials
It is necessary
to use proper
quality of
materials within
the project so
that the project
manager does
not have to face
issues related
with quality of
the project.
Testing of the
project materials
are necessary for
making sure that
the materials
that will be
utilized within
the project is of
proper quality.
The quality of
the materials
must be checked
before utilizing
it within the
project for
ensuring that it
is of appropriate
quality.
Quality analyst
is the most
responsible
person.
Providing
training facility
to the team
members of the
project
Proper facility
of training must
be provided to
the team
members of the
project so that
they can be able
to work
effectively
It is necessary
to review the
provided
training on a
regular basis for
making sure that
the training that
is provided is of
appropriate
It is essential to
review the
facility of
training from
time to time for
making sure that
proper training
facility is
provided to the
Human
resource
manager is the
responsible
person.
PROJECT MANAGEMENT
or strategy is
created for
mitigating the
risks
successfully.
related with the
project.
project related
risk can create
any type of
negative impact
on the project.
Use of proper
quality of
materials
It is necessary
to use proper
quality of
materials within
the project so
that the project
manager does
not have to face
issues related
with quality of
the project.
Testing of the
project materials
are necessary for
making sure that
the materials
that will be
utilized within
the project is of
proper quality.
The quality of
the materials
must be checked
before utilizing
it within the
project for
ensuring that it
is of appropriate
quality.
Quality analyst
is the most
responsible
person.
Providing
training facility
to the team
members of the
project
Proper facility
of training must
be provided to
the team
members of the
project so that
they can be able
to work
effectively
It is necessary
to review the
provided
training on a
regular basis for
making sure that
the training that
is provided is of
appropriate
It is essential to
review the
facility of
training from
time to time for
making sure that
proper training
facility is
provided to the
Human
resource
manager is the
responsible
person.
11
PROJECT MANAGEMENT
within the
project.
quality. project team
members.
Appointing
experienced
project team
members
It is very much
necessary to hire
experienced
team members
for the project
so that they can
be able to work
effectively
within the
project.
The skills as
well as
experience of
the project team
member’s needs
to be checked
before hiring
them for making
sure that they
have proper
skills and
experience for
the project.
It is necessary
to arrange a
yearly test for
the team
members of the
project in order
to make sure
that they have
proper skill set
for working
within the
project.
Human
resource
manager is
considered as
the most
responsible
person.
1.6 Procurement Strategy
Contract type
Management contracting method is generally utilized for executing the project of
“Darling Harbour Swing Bridge”. This bridge replacement is mainly arranged under the
operational control of an enterprise that is mainly vested by contract. It is found that the
contractors are generally paid to do all the work that is related with the project in order to
finish the project within the expected timeline and budget (Jorgensen, Mohagheghi &
Grimstad, 2017). There are number of advantages that the project get by utilizing this type of
contract within the project. The advantages of management contract generally includes less
time is needed for construction and getting proper devices during the design phase of the
PROJECT MANAGEMENT
within the
project.
quality. project team
members.
Appointing
experienced
project team
members
It is very much
necessary to hire
experienced
team members
for the project
so that they can
be able to work
effectively
within the
project.
The skills as
well as
experience of
the project team
member’s needs
to be checked
before hiring
them for making
sure that they
have proper
skills and
experience for
the project.
It is necessary
to arrange a
yearly test for
the team
members of the
project in order
to make sure
that they have
proper skill set
for working
within the
project.
Human
resource
manager is
considered as
the most
responsible
person.
1.6 Procurement Strategy
Contract type
Management contracting method is generally utilized for executing the project of
“Darling Harbour Swing Bridge”. This bridge replacement is mainly arranged under the
operational control of an enterprise that is mainly vested by contract. It is found that the
contractors are generally paid to do all the work that is related with the project in order to
finish the project within the expected timeline and budget (Jorgensen, Mohagheghi &
Grimstad, 2017). There are number of advantages that the project get by utilizing this type of
contract within the project. The advantages of management contract generally includes less
time is needed for construction and getting proper devices during the design phase of the
12
PROJECT MANAGEMENT
project. Additionally, it is found that in this type of contract, the entire budget of the project
needs to be properly estimated however the budget that is required within the project cannot
be properly determined until the entire project work is successfully completed.
Delivery method
Design build delivery model is considered as the most suitable delivery model for the
project “Harbour Swing Bridge” replacement. This delivery method is mainly selected for the
project as the entire design build team works under a single contract with the owner of the
project for providing proper design as well as construction services within the project (Yu,
Shen & Shi, 2016). By utilizing this method, the organization generally gets the
opportunities for the project owners to properly contemplate proper decisions by considering
number of options. This method of delivery also assists in saving budget of the project by
approximately 6%. In addition to this, this method helps in enhancing collaboration within
the organization among the various project team members.
PROJECT MANAGEMENT
project. Additionally, it is found that in this type of contract, the entire budget of the project
needs to be properly estimated however the budget that is required within the project cannot
be properly determined until the entire project work is successfully completed.
Delivery method
Design build delivery model is considered as the most suitable delivery model for the
project “Harbour Swing Bridge” replacement. This delivery method is mainly selected for the
project as the entire design build team works under a single contract with the owner of the
project for providing proper design as well as construction services within the project (Yu,
Shen & Shi, 2016). By utilizing this method, the organization generally gets the
opportunities for the project owners to properly contemplate proper decisions by considering
number of options. This method of delivery also assists in saving budget of the project by
approximately 6%. In addition to this, this method helps in enhancing collaboration within
the organization among the various project team members.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13
PROJECT MANAGEMENT
References
Badewi, A. (2016). The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), 761-778.
Binder, J. (2016). Global project management: communication, collaboration and
management across borders. Routledge.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014).
Can agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Correa, A. (2016). Project management in architectural practices: project success factors in
building design processes(Doctoral dissertation, Dublin Business School).
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Heldman, K. (2018). PMP: project management professional exam study guide. John Wiley
& Sons.
Hornstein, H. A. (2015). The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2), 291-
298.
Jørgensen, M., Mohagheghi, P., & Grimstad, S. (2017). Direct and indirect connections
between type of contract and software project outcome. International Journal of Project
Management, 35(8), 1573-1586.
PROJECT MANAGEMENT
References
Badewi, A. (2016). The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), 761-778.
Binder, J. (2016). Global project management: communication, collaboration and
management across borders. Routledge.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014).
Can agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Correa, A. (2016). Project management in architectural practices: project success factors in
building design processes(Doctoral dissertation, Dublin Business School).
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Heldman, K. (2018). PMP: project management professional exam study guide. John Wiley
& Sons.
Hornstein, H. A. (2015). The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2), 291-
298.
Jørgensen, M., Mohagheghi, P., & Grimstad, S. (2017). Direct and indirect connections
between type of contract and software project outcome. International Journal of Project
Management, 35(8), 1573-1586.
1 out of 14
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.