Replacement of Darling Harbour Swing Bridge

14 Pages2851 Words37 Views
   

Added on  2021-05-27

Replacement of Darling Harbour Swing Bridge

   Added on 2021-05-27

ShareRelated Documents
Running head: PROJECT MANAGEMENTProject: Replacement of Darling Harbour Swing BridgeName of the StudentName of the UniversityAuthor’s Note
Replacement of Darling Harbour Swing Bridge_1
PROJECT MANAGEMENT1Table of Contents1. Tender Documentation...........................................................................................................21.1 Statement of Work.......................................................................................................21.1.1 Introduction...............................................................................................................21.1.2 Project Scope.............................................................................................................21.1.3 Period of project performance...................................................................................21.1.4 Work requirements....................................................................................................31.1.5 Schedule....................................................................................................................41.1.6 Acceptance criteria....................................................................................................51.2 Work breakdown Structure..............................................................................................61.3 Milestone Schedule..........................................................................................................71.4 Cost estimates...................................................................................................................71.5 Quality assurance/Safety standards..................................................................................91.6 Procurement Strategy.....................................................................................................11References................................................................................................................................13
Replacement of Darling Harbour Swing Bridge_2
PROJECT MANAGEMENT21. Tender Documentation 1.1 Statement of Work1.1.1 IntroductionThe paper mainly focuses on the replacement of Harbour Swing Bridge by SBM3320Ltd that engages in inviting various tenders as well as eligible bidders for completing theproject work. The project work mainly involves replacing swing span, superstructure,operator hose and fender system. In addition to this, it also involves in finishing the workrelated with superstructure modification and electrical as well as mechanical overhaul. It isidentified that the time that is approved for finishing the entire superstructure as well asSwing span is around 10 days so that the replacement of bridge does not create any type ofnegative impact on the public. The entire project of Harbour swing replacement will befinished in 62 days by utilizing the approved cost that is around AUD 31,474,000.1.1.2 Project ScopeThe scope of the project includes:Replacement of Harbour swing BridgeCompletion of superstructure as well as swing span replacement within 10 daysCompletion of project within 62 days by utilizing budget of around $31,474,000Finishing the work associated with electrical and mechanical overhaul1.1.3 Period of project performanceThe replacement of Harbour swing will be finished within 62 days. It is identified thatthe project will initiate on 11/09/2018 and it will be successfully finished within 05/12/2018.
Replacement of Darling Harbour Swing Bridge_3
PROJECT MANAGEMENT31.1.4 Work requirementsThe replacement of Darling Swing Bridge will be finished within 62 days byengaging in different phases of the project that are elaborated below:Initiation phase: In the initiation phase of the project, the project manager engages indeveloping the business case of the project depending on which the bridge will be replaced.Proper feasibility analysis is undertaken in order to determine the feasibility that is associatedwith the project. In addition to this, appointments of project stakeholders are also done in theinitiation phase of the project.Planning phase: In the project-planning phase, the project manager is responsible fordeveloping financial plan, resource plan as well as risk management plan. In addition to this,the communication plan is also created in this phase. It is identified that this phase is mainlyundertaken in order to assume the budget as well as resources that are required for finishingthe project successfully.Execution phase: In the project execution phase, the project managers are responsibleof replacing the swing span, superstructure, operator hose and fender system. It is identifiedthat other additional work like finishing the work related with superstructure modificationand electrical as well as mechanical overhaul are finished in this phase.Closure phase: In the project closure phase, the project manager is mainlyresponsible of reviewing the entire project for making sure that all the activities are executedeffectively. Additionally, the stakeholder signs off as well as project documentation activitiesare undertaken by the project manager for finishing the project.
Replacement of Darling Harbour Swing Bridge_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project MANAGEMENT 13 13 Project Case Study-Replacement of Darling Harbour Swing Bridge Name of the University Authors Note
|12
|2032
|347

Completed Darling Harbour Swing Bridge Replacement Assessment No Student Name and ID Email
|13
|532
|350

Latter of Invitation to Tenders
|17
|4439
|28

Project Management: Harbour Swing Bridge
|15
|4795
|117

Pyrmont Swing Bridge Replacement and Construction in Sydney, Australia
|17
|4406
|225

OF INVITATION TO TENDERS
|13
|384
|37