Corporate Social Responsibility and Business Ethics
VerifiedAdded on 2020/02/03
|21
|4830
|342
Essay
AI Summary
This assignment delves into the concept of Corporate Social Responsibility (CSR) as a self-regulatory mechanism for businesses. It uses ASDA, a prominent UK supermarket chain, as a case study to illustrate how CSR integrates business practices with ethical considerations and legal compliance. The analysis considers the competitive landscape within the UK supermarket industry and highlights the importance of CSR in shaping an organization's mission and public image.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
MANAGING SUCCESFUL
BUSINESS
BUSINESS
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
P1: Devise clear aims and objectives for your project...........................................................3
P2: Costs, scope, time, quality, communication, risk and resources.....................................4
P3: Work breakdown structure and a Gantt chart.................................................................6
M1: Project Management Plan..............................................................................................7
TASK 2............................................................................................................................................8
P4: Small-scale research by applying qualitative and quantitative research methods...........8
M2: ‘Project Log Book’ evaluate the accuracy and reliability.............................................12
D1: Critically evaluate the project management process and the research methods............12
TASK 3..........................................................................................................................................12
P5: Analyse your research and data using appropriate tools and techniques.......................12
P6: Communicate appropriate recommendations and meaningful conclusions...................12
P7: Objectives and own learning and performance..............................................................13
M3:‘Performance Review’ accuracy and authenticity to support .......................................13
M4: Project management process and use of quality research ............................................13
D2: Decision-making process and changes or developments ............................................14
CONCLUSION .............................................................................................................................14
REFERENCES..............................................................................................................................15
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
P1: Devise clear aims and objectives for your project...........................................................3
P2: Costs, scope, time, quality, communication, risk and resources.....................................4
P3: Work breakdown structure and a Gantt chart.................................................................6
M1: Project Management Plan..............................................................................................7
TASK 2............................................................................................................................................8
P4: Small-scale research by applying qualitative and quantitative research methods...........8
M2: ‘Project Log Book’ evaluate the accuracy and reliability.............................................12
D1: Critically evaluate the project management process and the research methods............12
TASK 3..........................................................................................................................................12
P5: Analyse your research and data using appropriate tools and techniques.......................12
P6: Communicate appropriate recommendations and meaningful conclusions...................12
P7: Objectives and own learning and performance..............................................................13
M3:‘Performance Review’ accuracy and authenticity to support .......................................13
M4: Project management process and use of quality research ............................................13
D2: Decision-making process and changes or developments ............................................14
CONCLUSION .............................................................................................................................14
REFERENCES..............................................................................................................................15
INTRODUCTION
Managing a successful business plan or project is the systematic process in which decide
how to do work in effective and efficient manner. Its help to evaluate and determine all practices
and activities relating to the business(Polonsky and Waller 2014 ). To develop a business have to
plan a project there is mention all works and activates according to their time schedule and
capitalizes to employees. ASDA Ltd. is one of the famous super market in UK, which is dealing
with all kind of products such as kids wear and items, home, women clothing and so more. For
effectively deliver services to customers so it is using various type of services such as online or
internet shopping. In the business project should systematically mention all actives, work
schedule, number of employees, product feature, cost, resources and all. So employees are
working in decided systematic manner and easy to achieve the objectives and goals of the
business. In the other hand, all kind of business are working for earn profit but also help to
improve CSR programmes and activities to develop society and work force of employees so its
help to increase society's standard of living and build trust and loyalty on society. In this present
report mentioned about the aims and some main objectives of this project and also develop plan
related to project management in which consists scope, quality, costs, communication, resources
and risk. This business firm carry out a research programme by applying quantitative and
qualitative methods of research to meeting their aims and objectives.
TASK 1
P1: Devise clear aims and objectives for your project
Business project helps to manage all activities and works in the systematic process and
pre planned activities are mention in the project. In which find out and evaluate all market and
customers demand according to these thing after that pre pare a effective a plan to develop a
business and set vision and mission of the business. Through the business project manage all
activities and works and employees are complete their works in the systematic way and also a lot
the task according to their capabilities and their abilities to complete the task. The aim and
objective of ASDA company is develop their business and achieve their goals and objectives of
the business and earn maximum profits to increase their productivity in the future to develop
their business and so they can easy to build a brand image(Sparrow 2012). This business project
Managing a successful business plan or project is the systematic process in which decide
how to do work in effective and efficient manner. Its help to evaluate and determine all practices
and activities relating to the business(Polonsky and Waller 2014 ). To develop a business have to
plan a project there is mention all works and activates according to their time schedule and
capitalizes to employees. ASDA Ltd. is one of the famous super market in UK, which is dealing
with all kind of products such as kids wear and items, home, women clothing and so more. For
effectively deliver services to customers so it is using various type of services such as online or
internet shopping. In the business project should systematically mention all actives, work
schedule, number of employees, product feature, cost, resources and all. So employees are
working in decided systematic manner and easy to achieve the objectives and goals of the
business. In the other hand, all kind of business are working for earn profit but also help to
improve CSR programmes and activities to develop society and work force of employees so its
help to increase society's standard of living and build trust and loyalty on society. In this present
report mentioned about the aims and some main objectives of this project and also develop plan
related to project management in which consists scope, quality, costs, communication, resources
and risk. This business firm carry out a research programme by applying quantitative and
qualitative methods of research to meeting their aims and objectives.
TASK 1
P1: Devise clear aims and objectives for your project
Business project helps to manage all activities and works in the systematic process and
pre planned activities are mention in the project. In which find out and evaluate all market and
customers demand according to these thing after that pre pare a effective a plan to develop a
business and set vision and mission of the business. Through the business project manage all
activities and works and employees are complete their works in the systematic way and also a lot
the task according to their capabilities and their abilities to complete the task. The aim and
objective of ASDA company is develop their business and achieve their goals and objectives of
the business and earn maximum profits to increase their productivity in the future to develop
their business and so they can easy to build a brand image(Sparrow 2012). This business project
to earn their own profits as well as to develop society and their increase standard of living. In the
other hand, this business project through conduct CSR activities and programmes to develop
their society provide safety and security to do their task and work. Through the CSR activates
and programmes business can easy to build trust and loyalty in the society. CSR activities and
programmes through also enhance the effective relationship with their stakeholders in the
market.
Aim: One of the major aim of this project is to find out impacts of CSR activities and
programmes in effective manner.
Objectives:
To identify and evaluate the major benefits ad importance of CSR activities
To find out appropriate and effective methods and techniques so that they can be attain
their sustainable objectives and goals
To examine the actual positive impacts of CSR on business firm
With the help of CSR activities improve competition or build strong competition in retail
companies of UK. In which all retail companies have opportunities to enhance their business
firm. The impacts of CSR of retail company in United Kingdom is Corporate Social
Responsibility is very powerful tool and technique for all retailers or for the retail business firm.
With the help of this, business firm can improve its goodwill and image at market place or in
front of people of society. This is a useful tool because if company will do any thing for society
then from this all consumers will be loyal towards the company and from this sales and
productivity of firm will be increased. Moreover, CSR activities and programmes assists to
provides several opportunities to society persons with the help of this, they can enhance their
skilled and learn something new and innovative things in their life. These programmes helps to
develop healthy relationship with their customers. Because these programmes focuses on to
understand their need and major requirements.
P2: Costs, scope, time, quality, communication, risk and resources.
Project management plan for the business should pre planned and systematic in the
nature so employees are can easy to understand their responsibilities or duties to complete the
work. So in the project management plan in mentions cost, resource time schedule, quality ,
communication and risk all these are explain under the below:
other hand, this business project through conduct CSR activities and programmes to develop
their society provide safety and security to do their task and work. Through the CSR activates
and programmes business can easy to build trust and loyalty in the society. CSR activities and
programmes through also enhance the effective relationship with their stakeholders in the
market.
Aim: One of the major aim of this project is to find out impacts of CSR activities and
programmes in effective manner.
Objectives:
To identify and evaluate the major benefits ad importance of CSR activities
To find out appropriate and effective methods and techniques so that they can be attain
their sustainable objectives and goals
To examine the actual positive impacts of CSR on business firm
With the help of CSR activities improve competition or build strong competition in retail
companies of UK. In which all retail companies have opportunities to enhance their business
firm. The impacts of CSR of retail company in United Kingdom is Corporate Social
Responsibility is very powerful tool and technique for all retailers or for the retail business firm.
With the help of this, business firm can improve its goodwill and image at market place or in
front of people of society. This is a useful tool because if company will do any thing for society
then from this all consumers will be loyal towards the company and from this sales and
productivity of firm will be increased. Moreover, CSR activities and programmes assists to
provides several opportunities to society persons with the help of this, they can enhance their
skilled and learn something new and innovative things in their life. These programmes helps to
develop healthy relationship with their customers. Because these programmes focuses on to
understand their need and major requirements.
P2: Costs, scope, time, quality, communication, risk and resources.
Project management plan for the business should pre planned and systematic in the
nature so employees are can easy to understand their responsibilities or duties to complete the
work. So in the project management plan in mentions cost, resource time schedule, quality ,
communication and risk all these are explain under the below:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Stages Define Cost(million) Times Scheduled
Explain the
project plan and
their stakeholders
In this stage should mention
all details regarding project
to develop a business and
also their competitors in the
market and their
stakeholders.
100 15 to 20 days
Roles and
responsibilities
After the prepare a effective
plan to business should
define responsibilities and
roles of all employees and
all participate members of
the project like project
manager, project team,
leader, project sponsor and
others
50 10 to 15 days
Hold a meeting Define the roles and
responsibilities of all
members of the project
after that conduct a formal
meeting to discuss all
project related informations
and plan to all members. In
which include project
strategies, plan, project
vision and mission.
50 to 70 10 days
Develop a scope
statement
In this stage involve future
benefits by this business
project will be getting in the
future. In this stage clearly
200 30 to 40 days
Explain the
project plan and
their stakeholders
In this stage should mention
all details regarding project
to develop a business and
also their competitors in the
market and their
stakeholders.
100 15 to 20 days
Roles and
responsibilities
After the prepare a effective
plan to business should
define responsibilities and
roles of all employees and
all participate members of
the project like project
manager, project team,
leader, project sponsor and
others
50 10 to 15 days
Hold a meeting Define the roles and
responsibilities of all
members of the project
after that conduct a formal
meeting to discuss all
project related informations
and plan to all members. In
which include project
strategies, plan, project
vision and mission.
50 to 70 10 days
Develop a scope
statement
In this stage involve future
benefits by this business
project will be getting in the
future. In this stage clearly
200 30 to 40 days
define scope of the business
project and outcomes of the
project.
Scope baseline In which allot works
according to employees
capabilities and working
abilities on the basis of
WBS( work breakdown
structure). By this method
easy to allot works and task
of the project to employees.
50 10 to 20 days
Schedule and cost
baseline
After that decide the
schedule and cost of the
business and their
resources, risk, quality,
resources and all. In which
define all the task and
works and also their their
time schedule by critical
path method.
200 to 300 50 to 60 days
Baseline
management
plans
In this stage have to do
some effective changes in
the business project's cost,
schedule, time and their
employees working
performance and their
working strategies.
50 40 days
Staff planning In this stage explain or
define the time scheduling
on the basis of yearly,
400 20 to 30 days
project and outcomes of the
project.
Scope baseline In which allot works
according to employees
capabilities and working
abilities on the basis of
WBS( work breakdown
structure). By this method
easy to allot works and task
of the project to employees.
50 10 to 20 days
Schedule and cost
baseline
After that decide the
schedule and cost of the
business and their
resources, risk, quality,
resources and all. In which
define all the task and
works and also their their
time schedule by critical
path method.
200 to 300 50 to 60 days
Baseline
management
plans
In this stage have to do
some effective changes in
the business project's cost,
schedule, time and their
employees working
performance and their
working strategies.
50 40 days
Staff planning In this stage explain or
define the time scheduling
on the basis of yearly,
400 20 to 30 days
monthly, weekly and day
wise, staff planning is
shown in Gantt chart and
table
form(Keller,Parameswaran
and Jacob,2011).
Analysis project
risk and quality
After that should analysis
all project risk and quality
relating to their works and
activities of the business.
Project errors and impact of
project on the society.
100 40 days
Communication In this last stage of this
project explain all reports
works, their formates,
planning, using techniques
an media to complete the
project.
500 50 to 60 days
P3: Work breakdown structure and a Gantt chart
To completing the ASDA company's business project should maintain the all activities
and works in the systematic manner by using some effective strategies and techniques according
to their business environment and have to allot works to employees according to their
capabilities and skills of working(Kerzner 2013). To allot the works and manage them in the
systematic way so there are mainly available two methods those are help to define works and
activities according to their time scheduling and cost. Firs one is breakdown structure, in this
method prepare a structure relating to works of the business project after that allot works to
employees on the business of this method. Its help to define all works and divide between
employees according to their capabilities. Next one is Gantt char method, in this method mention
wise, staff planning is
shown in Gantt chart and
table
form(Keller,Parameswaran
and Jacob,2011).
Analysis project
risk and quality
After that should analysis
all project risk and quality
relating to their works and
activities of the business.
Project errors and impact of
project on the society.
100 40 days
Communication In this last stage of this
project explain all reports
works, their formates,
planning, using techniques
an media to complete the
project.
500 50 to 60 days
P3: Work breakdown structure and a Gantt chart
To completing the ASDA company's business project should maintain the all activities
and works in the systematic manner by using some effective strategies and techniques according
to their business environment and have to allot works to employees according to their
capabilities and skills of working(Kerzner 2013). To allot the works and manage them in the
systematic way so there are mainly available two methods those are help to define works and
activities according to their time scheduling and cost. Firs one is breakdown structure, in this
method prepare a structure relating to works of the business project after that allot works to
employees on the business of this method. Its help to define all works and divide between
employees according to their capabilities. Next one is Gantt char method, in this method mention
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
all works in the char formate and define all activities and works with time scheduling in the chart
form. Its easy to understand by employees and their project team( Baiden and Price 2011).
Stages Task Time
First Stage Introducing all works and
activities according to the plan
10 to 20 days
Second stage Analysis activities and work 20 days
form. Its easy to understand by employees and their project team( Baiden and Price 2011).
Stages Task Time
First Stage Introducing all works and
activities according to the plan
10 to 20 days
Second stage Analysis activities and work 20 days
process
Third stage Interpretation the plan and
design of business project
15 to 30 days
Fourth stage Collection an evaluation
information and data relating
to the business project
40 to 50 days.
M1: Project Management Plan
Project management plan is the process in which mention all activities an works in the
systematic way. All business wants to earn higher profits as well as conduct CSR activities and
programmes to develop society and increase standard of living of society's persons. CSR
activities and programmes are conducted by the business those aims and objectives are provide
safety, security, their welfare and their development in the effective way. So business can build a
brand image in the market and also in the society's mind so they can do easy to trust on business
products(Bakker 2011).
TASK 2
P4: Small-scale research by applying qualitative and quantitative research methods
In the research business project having many activities and works those are completing
by employees and project team in the systematic manner. To evaluate and analysis all activates
and their impact by some methods and techniques like qualitative and quantitative methods. Both
methods are provide actual and valuable information relating to the business project. Qualitative
method provide information relating to quality of works, products and employees performance
and so on. In the other hand, quantitative method in applying strategies and mathematical
techniques to conduct information and data(Smith Gonin and Besharov 2013.). There are
mention some questionnaire relating to the project those are define project relating information
by survey in the market. There are two type of research methods such as follows:
Qualitative
Quantitative
Name
Third stage Interpretation the plan and
design of business project
15 to 30 days
Fourth stage Collection an evaluation
information and data relating
to the business project
40 to 50 days.
M1: Project Management Plan
Project management plan is the process in which mention all activities an works in the
systematic way. All business wants to earn higher profits as well as conduct CSR activities and
programmes to develop society and increase standard of living of society's persons. CSR
activities and programmes are conducted by the business those aims and objectives are provide
safety, security, their welfare and their development in the effective way. So business can build a
brand image in the market and also in the society's mind so they can do easy to trust on business
products(Bakker 2011).
TASK 2
P4: Small-scale research by applying qualitative and quantitative research methods
In the research business project having many activities and works those are completing
by employees and project team in the systematic manner. To evaluate and analysis all activates
and their impact by some methods and techniques like qualitative and quantitative methods. Both
methods are provide actual and valuable information relating to the business project. Qualitative
method provide information relating to quality of works, products and employees performance
and so on. In the other hand, quantitative method in applying strategies and mathematical
techniques to conduct information and data(Smith Gonin and Besharov 2013.). There are
mention some questionnaire relating to the project those are define project relating information
by survey in the market. There are two type of research methods such as follows:
Qualitative
Quantitative
Name
Age
Gender
Question 1. What do yo think about this business project for ASDA, is it useful or not for
develop business.
(a) yes
(b) no
Question 2. Do you think this business work for earn own profit as well as society welfare.
(a) yes
(b) no
Question 3. What do you think about CSR activities and programmes are help to develop
business and help to build trust and loyalty in the society.
(a) yes
(b) no
Question 4. In the business research project to allot the works and provide actual informations
by the work breakdown structure and Gantt chart or not.
(a) yes
(b) no
Question 5. What do you think in the research project manage all works and activities by whom.
(a) project leader
(b) HR department
(c) project manager
Question 6. CSR programmes and activities help to provide safety, security, and is it working
for their welfare or not.
(a) yes
(b) no
Gender
Question 1. What do yo think about this business project for ASDA, is it useful or not for
develop business.
(a) yes
(b) no
Question 2. Do you think this business work for earn own profit as well as society welfare.
(a) yes
(b) no
Question 3. What do you think about CSR activities and programmes are help to develop
business and help to build trust and loyalty in the society.
(a) yes
(b) no
Question 4. In the business research project to allot the works and provide actual informations
by the work breakdown structure and Gantt chart or not.
(a) yes
(b) no
Question 5. What do you think in the research project manage all works and activities by whom.
(a) project leader
(b) HR department
(c) project manager
Question 6. CSR programmes and activities help to provide safety, security, and is it working
for their welfare or not.
(a) yes
(b) no
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Question 7. In the business research project is it require to do all works and activities on the
basis of planning and designing.
(a) yes
(b) no
Interpretation
Question 1. What do yo think about this business project ASDA, is it useful or not for develop
society and business in the future.
Frequency Percentage
(a) yes 7 80
(b) no 3 20
Yes No
0
10
20
30
40
50
60
70
80
90 80
20
Column B
On the basis of this question there are 80% persons said yes and 20 % persons said no
because all persons have thinking level are different and also their observation level. In the
market all persons are not think positive relating to business project
Question 2. Do you think this business work for earn own profit as well as society welfare.
Frequency Percentage
basis of planning and designing.
(a) yes
(b) no
Interpretation
Question 1. What do yo think about this business project ASDA, is it useful or not for develop
society and business in the future.
Frequency Percentage
(a) yes 7 80
(b) no 3 20
Yes No
0
10
20
30
40
50
60
70
80
90 80
20
Column B
On the basis of this question there are 80% persons said yes and 20 % persons said no
because all persons have thinking level are different and also their observation level. In the
market all persons are not think positive relating to business project
Question 2. Do you think this business work for earn own profit as well as society welfare.
Frequency Percentage
(a) yes 6 70
(b) no 4 30
Yes No
0
10
20
30
40
50
60
70
80
70
30 Column B
On the basis of this question by the survey in the market 70% person said yes and 30%
persons said no they think this business project is not useful for their society development.
Question 3. What do you think about CSR activities and programmes are help to develop
business and help to build trust and loyalty in the society.
Frequency Percentage
(a) yes 8 90
(b) no 2 10
(b) no 4 30
Yes No
0
10
20
30
40
50
60
70
80
70
30 Column B
On the basis of this question by the survey in the market 70% person said yes and 30%
persons said no they think this business project is not useful for their society development.
Question 3. What do you think about CSR activities and programmes are help to develop
business and help to build trust and loyalty in the society.
Frequency Percentage
(a) yes 8 90
(b) no 2 10
Yes No
0
10
20
30
40
50
60
70
80
90
100 90
10
Column B
According to this question of business research project there are 90% persons are agree
with this question sand they said CSR activities are helpful for their society development but
10% persons said no on the basis of their thinking level and their observation.
Question 4. In the business research project to allot the works and provide actual informations by
the work breakdown structure and Gantt chart or not.
Frequency Percentage
(a) yes 8 90
(b) no 2 10
Yes No
0
10
20
30
40
50
60
70
80
90
100 90
10
Column B
0
10
20
30
40
50
60
70
80
90
100 90
10
Column B
According to this question of business research project there are 90% persons are agree
with this question sand they said CSR activities are helpful for their society development but
10% persons said no on the basis of their thinking level and their observation.
Question 4. In the business research project to allot the works and provide actual informations by
the work breakdown structure and Gantt chart or not.
Frequency Percentage
(a) yes 8 90
(b) no 2 10
Yes No
0
10
20
30
40
50
60
70
80
90
100 90
10
Column B
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
As per the survey in the market 90% persons are agree with question and 10% persons
are not agree with question. Because to collect the informations relating to the project there are
many methods and techniques.
Question 5. What do you think in the research project manage all works and activities by whom.
Frequency Percentage
(a) project leader 2 10
(b) HR department 3 20
(c) project manager 5 70
Project leader HR department Project manager
0
10
20
30
40
50
60
70
80
10
20
70
Column B
As per this question manage all activities and works are manage by whom so 10%
persons are said project leader, 20% persons are said HR department and last one 70% persons
are said project manager.
are not agree with question. Because to collect the informations relating to the project there are
many methods and techniques.
Question 5. What do you think in the research project manage all works and activities by whom.
Frequency Percentage
(a) project leader 2 10
(b) HR department 3 20
(c) project manager 5 70
Project leader HR department Project manager
0
10
20
30
40
50
60
70
80
10
20
70
Column B
As per this question manage all activities and works are manage by whom so 10%
persons are said project leader, 20% persons are said HR department and last one 70% persons
are said project manager.
Question 6. CSR programmes and activities help to provide safety, security, and is it working for
their welfare or not.
Frequency Percentage
(a) yes 7 80
(b) no 3 20
Yes No
0
10
20
30
40
50
60
70
80
90
80
20
Column B
According to this question 80% persons are agree with this question but 20% persons are
not agree just because they not think CSR activities are provide safety, security and all to society.
Question 7. In the business research project is it require to do all works and activities on the basis
of planning and designing.
Frequency Percentage
(a) yes 8 90
their welfare or not.
Frequency Percentage
(a) yes 7 80
(b) no 3 20
Yes No
0
10
20
30
40
50
60
70
80
90
80
20
Column B
According to this question 80% persons are agree with this question but 20% persons are
not agree just because they not think CSR activities are provide safety, security and all to society.
Question 7. In the business research project is it require to do all works and activities on the basis
of planning and designing.
Frequency Percentage
(a) yes 8 90
(b) no 2 10
Yes No
0
10
20
30
40
50
60
70
80
90
100 90
10
Column B
As per this question in the research project process is is require to do all works and
activities on the basis of planning and designing. So 90% persons are yes but 10% persons are
said no.
M2: ‘Project Log Book’ evaluate the accuracy and reliability
In the research business project having many activities and works relating to the business
so it is require to evaluate and determine all informations and data related to the project if there
are having any errors and weak points relating to their employees work performance so there are
using some methods and techniques to determine and evaluate data. It is require to provide actual
and realistic data.(Kowalkowski, Kindström and Brehmer2011) Its help to take accurate
decisions regarding their project activities.
D1: Critically evaluate the project management process and the research methods
In the project management process including various steps in which systematically divide
all works and activities according to their priorities so to complete the project in the effective and
systematic way so it is require to do all works according to decided planning its help to provide
Yes No
0
10
20
30
40
50
60
70
80
90
100 90
10
Column B
As per this question in the research project process is is require to do all works and
activities on the basis of planning and designing. So 90% persons are yes but 10% persons are
said no.
M2: ‘Project Log Book’ evaluate the accuracy and reliability
In the research business project having many activities and works relating to the business
so it is require to evaluate and determine all informations and data related to the project if there
are having any errors and weak points relating to their employees work performance so there are
using some methods and techniques to determine and evaluate data. It is require to provide actual
and realistic data.(Kowalkowski, Kindström and Brehmer2011) Its help to take accurate
decisions regarding their project activities.
D1: Critically evaluate the project management process and the research methods
In the project management process including various steps in which systematically divide
all works and activities according to their priorities so to complete the project in the effective and
systematic way so it is require to do all works according to decided planning its help to provide
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
actual data and informations. In this project used various type of methods like qualitative
methods, quantitative method, Gantt chart and breakdown method to get informations and
understand issues and problems related to the project. All these methods are help full to complete
the project and help to achieve the objectives and goals of the business project that's why in the
project management process in all works are should completed in the systematic process.
TASK 3
P5: Analyse your research and data using appropriate tools and techniques.
To analysis and evaluate research data and information so there are using methods and
strategies to get actual and reliable informations relating to the project. There are mainly using
qualitative method and quantitative methods these all are provide appropriate data is help to find
out errors relating to the project. Qualitative method provide data in the effective manner on the
quality base and quantitative methods in using mathematical tools and techniques that provide
result in the quantitative form(Doherty, Ashurstand Peppard 2012).
In this report has been effectively conducted research at market place and has been
gathered and collected appropriate information. Thus, for effectively analysing and evaluating
the collected information and data there can be used two type of methods qualitative and
quantitative methods. Apart from this, after collecting the data and information about any
business firm from outside the market then have to be effectively analyse and evaluate with the
help of appropriate methods and tools. So that research manager can take significant decision as
well as can get success in a impressive manner.
P6: Communicate appropriate recommendations and meaningful conclusions.
According to this research project to business development so its help to earn high profits
as well as social welfare and develop their standard of living. To analysis data and informations
related to the project there are using many methods and tools those are help to provide actual
data that help to develop business and also business project help to develop standard of living of
society and provide them safety and security so company will easy to build trust and loyalty.
There are providing some effective recommendations to researchers such as follows:
methods, quantitative method, Gantt chart and breakdown method to get informations and
understand issues and problems related to the project. All these methods are help full to complete
the project and help to achieve the objectives and goals of the business project that's why in the
project management process in all works are should completed in the systematic process.
TASK 3
P5: Analyse your research and data using appropriate tools and techniques.
To analysis and evaluate research data and information so there are using methods and
strategies to get actual and reliable informations relating to the project. There are mainly using
qualitative method and quantitative methods these all are provide appropriate data is help to find
out errors relating to the project. Qualitative method provide data in the effective manner on the
quality base and quantitative methods in using mathematical tools and techniques that provide
result in the quantitative form(Doherty, Ashurstand Peppard 2012).
In this report has been effectively conducted research at market place and has been
gathered and collected appropriate information. Thus, for effectively analysing and evaluating
the collected information and data there can be used two type of methods qualitative and
quantitative methods. Apart from this, after collecting the data and information about any
business firm from outside the market then have to be effectively analyse and evaluate with the
help of appropriate methods and tools. So that research manager can take significant decision as
well as can get success in a impressive manner.
P6: Communicate appropriate recommendations and meaningful conclusions.
According to this research project to business development so its help to earn high profits
as well as social welfare and develop their standard of living. To analysis data and informations
related to the project there are using many methods and tools those are help to provide actual
data that help to develop business and also business project help to develop standard of living of
society and provide them safety and security so company will easy to build trust and loyalty.
There are providing some effective recommendations to researchers such as follows:
It can be used appropriate and effective methods and techniques in the business firm for
achieving the tasks and objectives.
Should be effectively manage and control all over research activities and operations in a
effective and efficient manner.
Should be provide business services and facilities to customers as per their needs and
expectations.
Every business firm must be invest fund in CSR activities ad functions.
P7: Objectives and own learning and performance.
Research project related to any business that help to find out something new and
innovative things related to the project. In the research project process there are involving project
manager, project team and other all persons those are working in the systematic manner
according to the process so in which increase working performance of the employees and they
learn something new by research project. Research project in having different works and
activates those are should complete in the systematic way and increase performance and working
involvement of employees and project team(.Too and Weaver 2014).
As per my experience, research is one of the best method for collecting and gathering the
actual information about market as well as company. Additionally, with the help of this
effectively analyse and identify the market condition and situation. Due to this, researcher can
take appropriate decisions. Research assist to increase profitability and productivity of the
company because in which researcher can examine the customers needs so that they can provide
services as per their demand. Thus, while organisation full fill the needs of consumers then
respectively increased sales and revenue of the business firm.
M3:‘Performance Review’ accuracy and authenticity to support
In the research project conduct many useful and useless things those are may be help to
develop business in the systematic way and also help to achieve objectives and goals of the
business, in which to evaluate and determine data and information relating to the business project
using many methods and techniques those should applicable and suitable on the project. Suitable
methods provide accurate data informations that help to develop business and full fill all
achieving the tasks and objectives.
Should be effectively manage and control all over research activities and operations in a
effective and efficient manner.
Should be provide business services and facilities to customers as per their needs and
expectations.
Every business firm must be invest fund in CSR activities ad functions.
P7: Objectives and own learning and performance.
Research project related to any business that help to find out something new and
innovative things related to the project. In the research project process there are involving project
manager, project team and other all persons those are working in the systematic manner
according to the process so in which increase working performance of the employees and they
learn something new by research project. Research project in having different works and
activates those are should complete in the systematic way and increase performance and working
involvement of employees and project team(.Too and Weaver 2014).
As per my experience, research is one of the best method for collecting and gathering the
actual information about market as well as company. Additionally, with the help of this
effectively analyse and identify the market condition and situation. Due to this, researcher can
take appropriate decisions. Research assist to increase profitability and productivity of the
company because in which researcher can examine the customers needs so that they can provide
services as per their demand. Thus, while organisation full fill the needs of consumers then
respectively increased sales and revenue of the business firm.
M3:‘Performance Review’ accuracy and authenticity to support
In the research project conduct many useful and useless things those are may be help to
develop business in the systematic way and also help to achieve objectives and goals of the
business, in which to evaluate and determine data and information relating to the business project
using many methods and techniques those should applicable and suitable on the project. Suitable
methods provide accurate data informations that help to develop business and full fill all
objectives and goals of the business. In the other hand, in the research project should select
suitable and appropriate methods to complete the research.
M4: Project management process and use of quality research
Research management process involving many stages and activities those are completed
in the systematic way to achieve the objective and goals of the business project. It is require to
evaluate and determine working activities in this and also identifies which methods and activities
are using to complete the tasks and works. If the business project in using appropriate methods
so they help to increase working performance of employees and improve their working
involvement to complete the task and goals. In the research project conduct something new and
innovative things relating to the project so that help to increase knowledge and learning power to
employees
D2: Decision-making process and changes or developments
Research project process through get some effective outcomes those may be use full and
harmful for project some outcomes are help to develop project and complete the task and works
of the project and help to achieve the objectives and goals. Outcomes relating to the project help
to take effective decisions towards project that help to develop project and increase working
performance of employees.
CONCLUSION
As per the project report Corporate social responsibility represents a form of corporate
self regulation integrated into a business model. The functions of CSR as a self regulatory
mechanism where by a business monitor and ensures its active compliance with the spirit of the
law, ethical standers and national or international norms. ASDA is famous supermarket in UK, in
the external market has different competitors, which all are tires to compete each others by using
effective and smart techniques. The actual meaning of CSR is to aid an organisations mission as
well as serve as a guide to what the company represents for its consumers. The business ethics is
suitable and appropriate methods to complete the research.
M4: Project management process and use of quality research
Research management process involving many stages and activities those are completed
in the systematic way to achieve the objective and goals of the business project. It is require to
evaluate and determine working activities in this and also identifies which methods and activities
are using to complete the tasks and works. If the business project in using appropriate methods
so they help to increase working performance of employees and improve their working
involvement to complete the task and goals. In the research project conduct something new and
innovative things relating to the project so that help to increase knowledge and learning power to
employees
D2: Decision-making process and changes or developments
Research project process through get some effective outcomes those may be use full and
harmful for project some outcomes are help to develop project and complete the task and works
of the project and help to achieve the objectives and goals. Outcomes relating to the project help
to take effective decisions towards project that help to develop project and increase working
performance of employees.
CONCLUSION
As per the project report Corporate social responsibility represents a form of corporate
self regulation integrated into a business model. The functions of CSR as a self regulatory
mechanism where by a business monitor and ensures its active compliance with the spirit of the
law, ethical standers and national or international norms. ASDA is famous supermarket in UK, in
the external market has different competitors, which all are tires to compete each others by using
effective and smart techniques. The actual meaning of CSR is to aid an organisations mission as
well as serve as a guide to what the company represents for its consumers. The business ethics is
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
the min part of applied ethics that examines ethical principles and moral or ethical problem that
can arises in a business environment.
can arises in a business environment.
REFERENCES
Books and journals
Baiden, B.K. and Price, A.D., 2011. The effect of integration on project delivery team
effectiveness. International Journal of Project Management 29(2) pp.129-136.
Bakker, R.M and et.al 2011. Managing the project learning paradox: A set-theoretic approach
toward project knowledge transfer. International Journal of Project Management 29(5)
pp.494-503.
Doherty, N.F., Ashurst, C. and Peppard, J., 2012. Factors affecting the successful realisation of
benefits from systems development projects: findings from three case studies. journal of
Information Technology, 27(1), pp.1-16.
Keller, K.L., Parameswaran, M.G. and Jacob, I., 2011. Strategic brand management: Building,
measuring, and managing brand equity. Pearson Education India.
Kerzner, H., 2013. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Kowalkowski, C., Kindström, D. and Brehmer, P.O., 2011. Managing industrial service
offerings in global business markets. ournal of Business & Industrial Marketing 26(3)
pp.181-192.
Polonsky, M.J. and Waller, D.S., 2014. Designing and managing a research project: A business
student's guide. Sage Publications.
Smith, W.K., Gonin, M. and Besharov, M.L., 2013. Managing social-business tensions: A
review and research agenda for social enterprise. Business Ethics Quarterly, 23(03),
pp.407-442.
Sparrow, E., 2012. Successful IT outsourcing: from choosing a provider to managing the
project. Springer Science & Business Media.
Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual
framework for project governance. International Journal of Project Management 32(8)
pp.1382-1394.
Books and journals
Baiden, B.K. and Price, A.D., 2011. The effect of integration on project delivery team
effectiveness. International Journal of Project Management 29(2) pp.129-136.
Bakker, R.M and et.al 2011. Managing the project learning paradox: A set-theoretic approach
toward project knowledge transfer. International Journal of Project Management 29(5)
pp.494-503.
Doherty, N.F., Ashurst, C. and Peppard, J., 2012. Factors affecting the successful realisation of
benefits from systems development projects: findings from three case studies. journal of
Information Technology, 27(1), pp.1-16.
Keller, K.L., Parameswaran, M.G. and Jacob, I., 2011. Strategic brand management: Building,
measuring, and managing brand equity. Pearson Education India.
Kerzner, H., 2013. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Kowalkowski, C., Kindström, D. and Brehmer, P.O., 2011. Managing industrial service
offerings in global business markets. ournal of Business & Industrial Marketing 26(3)
pp.181-192.
Polonsky, M.J. and Waller, D.S., 2014. Designing and managing a research project: A business
student's guide. Sage Publications.
Smith, W.K., Gonin, M. and Besharov, M.L., 2013. Managing social-business tensions: A
review and research agenda for social enterprise. Business Ethics Quarterly, 23(03),
pp.407-442.
Sparrow, E., 2012. Successful IT outsourcing: from choosing a provider to managing the
project. Springer Science & Business Media.
Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual
framework for project governance. International Journal of Project Management 32(8)
pp.1382-1394.
1 out of 21
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.