STAKEHOLDER MANAGEMENT IN CONSTRUCTION INDUSTRY PROJECT SEMINAR REPORT - II Thesis work submitted in partial fulfillment of the requirement for the Degree of Masters in Building Engineering and Management School of Planning and Architecture, New Delhi GIRISH KUMAR SINGH SPA/NS/BEM/612 DEPARTMENT OF BUILDING ENGINEERING AND MANAGEMENT SCHOOL OF PLANNING AND ARCHITECTURE NEW DELHI 110002 DECEMBER 2015 CERTIFICATE Certified that the seminar titled "Stakeholder Management In Construction Industry"
Stakeholder Management In Construction Industry Project Seminar Report - II
Added on 2022-01-20
ShareRelated Documents
STAKEHOLDER MANAGEMENT IN
CONSTRUCTION INDUSTRY
PROJECT SEMINAR REPORT - II
Thesis work submitted in partial fulfillment of the requirement for the
Degree of Masters in Building Engineering and Management
School of Planning and Architecture, New Delhi
GIRISH KUMAR SINGH
SPA/NS/BEM/612
DEPARTMENT OF BUILDING ENGINEERING AND MANAGEMENT
SCHOOL OF PLANNING AND ARCHITECTURE
NEW DELHI – 110002
DECEMBER 2015
CONSTRUCTION INDUSTRY
PROJECT SEMINAR REPORT - II
Thesis work submitted in partial fulfillment of the requirement for the
Degree of Masters in Building Engineering and Management
School of Planning and Architecture, New Delhi
GIRISH KUMAR SINGH
SPA/NS/BEM/612
DEPARTMENT OF BUILDING ENGINEERING AND MANAGEMENT
SCHOOL OF PLANNING AND ARCHITECTURE
NEW DELHI – 110002
DECEMBER 2015
CERTIFICATE
Certified that the seminar titled “Stakeholder Management In Construction Industry”
submitted by Girish Kumar Singh in partial fulfillment of the requirement of award of the
Degree of Master’s in Building Engineering and Management of the School of Planning and
Architecture (deemed to be a university), is a record of the student’s own work carried out by her
under our supervision and guidance. The content embodied in this seminar has not been
submitted for the award of any other degree or diploma.
Prof. (Dr). V. Thiruvengadam Prof. (Dr). V. K. Paul
Seminar Guide Head of the Department
Visiting Professor Department of Building Engineering
Department of Building Engineering and Management
and Management School of Planning and Architecture
School of Planning and Architecture, Delhi Delhi
Certified that the seminar titled “Stakeholder Management In Construction Industry”
submitted by Girish Kumar Singh in partial fulfillment of the requirement of award of the
Degree of Master’s in Building Engineering and Management of the School of Planning and
Architecture (deemed to be a university), is a record of the student’s own work carried out by her
under our supervision and guidance. The content embodied in this seminar has not been
submitted for the award of any other degree or diploma.
Prof. (Dr). V. Thiruvengadam Prof. (Dr). V. K. Paul
Seminar Guide Head of the Department
Visiting Professor Department of Building Engineering
Department of Building Engineering and Management
and Management School of Planning and Architecture
School of Planning and Architecture, Delhi Delhi
ACKNOWLEDGEMENT
First and foremost I offer my sincerest gratitude to my guide, Dr. V. Thiruvengadam, Visiting
Professor, Department of Building Engineering and Management, School of Planning and
Architecture, New Delhi, who has supported me throughout the study with his patience and
knowledge, while still giving me the freedom to work independently. One simply could not wish
for a better guide.
I am grateful to Dr. V.K Paul, Head of Department, for his support at various stages of the
work.
I would also like to thank all the teaching and non-teaching staff of the department for their co-
operation and help during the course.
Last but not the least, I would like to thank my classmates and friends, for their never ending
support and encouragement. I am grateful to the most important people in my life who have
made me what I am today with their unending love and affection, my parents, who are my
constant source of Inspiration.
Girish Kumar Singh
New Delhi
First and foremost I offer my sincerest gratitude to my guide, Dr. V. Thiruvengadam, Visiting
Professor, Department of Building Engineering and Management, School of Planning and
Architecture, New Delhi, who has supported me throughout the study with his patience and
knowledge, while still giving me the freedom to work independently. One simply could not wish
for a better guide.
I am grateful to Dr. V.K Paul, Head of Department, for his support at various stages of the
work.
I would also like to thank all the teaching and non-teaching staff of the department for their co-
operation and help during the course.
Last but not the least, I would like to thank my classmates and friends, for their never ending
support and encouragement. I am grateful to the most important people in my life who have
made me what I am today with their unending love and affection, my parents, who are my
constant source of Inspiration.
Girish Kumar Singh
New Delhi
Chapter Formulation
Chapter 1 Introduction
This chapter include all the basic information about the stakeholder and stakeholder management
Chapter 2 Literature Review
This chapter includes all the literature reviews used for the this report and help in the drafting
this report.
Chapter 3 Management of Stakeholders
This chapter includes PMBOK stakeholder part and also ISO which have portion for stakeholder
is covered.
Chapter 4 Stakeholder
In this chapter all the type of stakeholders and there roll in the project is describe.
Chapter 5 Chapter 5 Stakeholder involvement in Project Life Cycle
This chapter include the various project life cycle of the project and a generalized involvement of
stakeholders in all the phases of the project and their roles and responsibilities will be described
in this chapter
Chapter 6 Stakeholder Management in Real Estate Industry
In this chapter all type of stakeholder involve in residential type of project are covered, the
involvement of each body will be different according to the project will be discussed in detail in
this chapter. Most of the stakeholders in this kind of project have limited but efficient influence
on the project for example in a real estate project the end user have a strong hand after the
competition of the project rather than any of the stakeholder involved during the construction or
before the construction. But during the construction the project team as well as the financial
supporter like banks and other company which supply fund to the project have a very strong
hand during the construction.
Chapter 1 Introduction
This chapter include all the basic information about the stakeholder and stakeholder management
Chapter 2 Literature Review
This chapter includes all the literature reviews used for the this report and help in the drafting
this report.
Chapter 3 Management of Stakeholders
This chapter includes PMBOK stakeholder part and also ISO which have portion for stakeholder
is covered.
Chapter 4 Stakeholder
In this chapter all the type of stakeholders and there roll in the project is describe.
Chapter 5 Chapter 5 Stakeholder involvement in Project Life Cycle
This chapter include the various project life cycle of the project and a generalized involvement of
stakeholders in all the phases of the project and their roles and responsibilities will be described
in this chapter
Chapter 6 Stakeholder Management in Real Estate Industry
In this chapter all type of stakeholder involve in residential type of project are covered, the
involvement of each body will be different according to the project will be discussed in detail in
this chapter. Most of the stakeholders in this kind of project have limited but efficient influence
on the project for example in a real estate project the end user have a strong hand after the
competition of the project rather than any of the stakeholder involved during the construction or
before the construction. But during the construction the project team as well as the financial
supporter like banks and other company which supply fund to the project have a very strong
hand during the construction.
Chapter 7 Stakeholder Management in Infrastructure Project
In an infrastructure project several government as well as private body is involved which have
different policies regarding the land allotment, project execution etc. which will be covered in
this chapter. In most of the projects like road development, dams, metro people who are using it
are not the biggest stakeholder the person who give his land for the development of that project
become the strongest stakeholder and many policies are involve in this to handover and takeover
the land which will be discussed in this chapter
Chapter 8 the Analytic Hierarchy Process For Ranking Stakeholders
In this chapter for analysis Analytic Hierarchy Process (AHP) and Stakeholder circle is used in
the different phase of the project as well as the different type of the project.
In this chapter different project are analyzed and according to the project stakeholders are
ranked/Priorities with the phases of the project.
In an infrastructure project several government as well as private body is involved which have
different policies regarding the land allotment, project execution etc. which will be covered in
this chapter. In most of the projects like road development, dams, metro people who are using it
are not the biggest stakeholder the person who give his land for the development of that project
become the strongest stakeholder and many policies are involve in this to handover and takeover
the land which will be discussed in this chapter
Chapter 8 the Analytic Hierarchy Process For Ranking Stakeholders
In this chapter for analysis Analytic Hierarchy Process (AHP) and Stakeholder circle is used in
the different phase of the project as well as the different type of the project.
In this chapter different project are analyzed and according to the project stakeholders are
ranked/Priorities with the phases of the project.
ABSTRACT
The notion of stakeholder was coined in an internal memorandum at the Stanford Research
Institute in 1963 and means “those groups without whose support the organization would cease
to exist”. IN a famous article Freeman and Reed define stakeholders as "those groups who have a
stake in the action of the corporation” (Freeman & Reed, 1983).
Stakeholder management is a critical component to the successful delivery of any project,
programmer or activity. A stakeholder is any individual, group or organization that can affect,
be affected by, or perceive itself to be affected by a programmer.
In this report the various type of stakeholder are explained with their need, requirement, role and
responsibility of every stakeholder. The involvement of stakeholder is very important according
the stage of the project and to manage it we need to adapt the stakeholder management theory.
All type of stakeholder involve in residential type of project are covered, the involvement of each
body will be different according to the project will be discussed in detail in this chapter. Most of
the stakeholders in this kind of project have limited but efficient influence on the project for
example in a real estate project the end user have a strong hand after the competition of the
project rather than any of the stakeholder involved during the construction or before the
construction. But during the construction the project team as well as the financial supporter like
banks and other company which supply fund to the project have a very strong hand during the
construction.
In an infrastructure project several government as well as private body is involved which have
different policies regarding the land allotment, project execution etc. In most of the projects like
road development, dams, metro people who are using it are not the biggest stakeholder the
person who give his land for the development of that project become the strongest stakeholder
and many policies are involve in this to handover and takeover the land.
For analysis Analytic Hierarchy Process (AHP) and Stakeholder circle is used in the different
phase of the project as well as the different type of the project.
Different responses by survey are analyzed and according to the project stakeholders are
ranked/Priorities with the phases of the project.
The notion of stakeholder was coined in an internal memorandum at the Stanford Research
Institute in 1963 and means “those groups without whose support the organization would cease
to exist”. IN a famous article Freeman and Reed define stakeholders as "those groups who have a
stake in the action of the corporation” (Freeman & Reed, 1983).
Stakeholder management is a critical component to the successful delivery of any project,
programmer or activity. A stakeholder is any individual, group or organization that can affect,
be affected by, or perceive itself to be affected by a programmer.
In this report the various type of stakeholder are explained with their need, requirement, role and
responsibility of every stakeholder. The involvement of stakeholder is very important according
the stage of the project and to manage it we need to adapt the stakeholder management theory.
All type of stakeholder involve in residential type of project are covered, the involvement of each
body will be different according to the project will be discussed in detail in this chapter. Most of
the stakeholders in this kind of project have limited but efficient influence on the project for
example in a real estate project the end user have a strong hand after the competition of the
project rather than any of the stakeholder involved during the construction or before the
construction. But during the construction the project team as well as the financial supporter like
banks and other company which supply fund to the project have a very strong hand during the
construction.
In an infrastructure project several government as well as private body is involved which have
different policies regarding the land allotment, project execution etc. In most of the projects like
road development, dams, metro people who are using it are not the biggest stakeholder the
person who give his land for the development of that project become the strongest stakeholder
and many policies are involve in this to handover and takeover the land.
For analysis Analytic Hierarchy Process (AHP) and Stakeholder circle is used in the different
phase of the project as well as the different type of the project.
Different responses by survey are analyzed and according to the project stakeholders are
ranked/Priorities with the phases of the project.
Contents
Chapter 1 Introduction .................................................................................................................................. 6
Introduction:-- ...................................................................................................................................................... 6
Project stakeholders ............................................................................................................................................. 7
The stakeholder categories identified as:............................................................................................................. 7
Need of study........................................................................................................................................................ 8
Aim........................................................................................................................................................................ 8
OBJECTIVE ............................................................................................................................................................. 8
Scope of the Study: ............................................................................................................................................... 8
Methodology ........................................................................................................................................................ 9
Chapter 2 Literature Review ....................................................................................................................... 10
External Stakeholder Management in the Construction Process (Olander, 2003) ............................................ 10
Investigating the Stakeholder Management in Construction Projects in the Gaza Strip ................................... 10
Stakeholder management in construction: An empirical study to address research gaps in previous studies
(Jing Yanga, 2010) ............................................................................................................................................... 11
Construction project success analysis from stakeholders' theory perspective (Moradi, 2011)......................... 11
Strategic Management of Stakeholders: Theory and Practice (Eden, 2010)...................................................... 11
Project Stakeholder Management (Jepsen, 2013) .............................................................................................. 12
Chapter 3 Management of Stakeholders .................................................................................................... 13
PROJECT STAKEHOLDER MANAGEMENT ............................................................................................................ 13
3.1 Identify Stakeholders .................................................................................................................................... 14
3.1.1 Identify Stakeholders: Inputs................................................................................................................. 16
3.1.1.1 Project Charter.................................................................................................................................... 16
3.1.1.2 Procurement Documents.................................................................................................................... 16
3.1.1.3 Enterprise Environmental Factors ...................................................................................................... 16
3.1.1.4 Organizational Process Assets ............................................................................................................ 16
3.1.2 Identify Stakeholders: Tools and Techniques ............................................................................................ 16
3.1.2.1 Stakeholder Analysis........................................................................................................................... 16
3.1.2.2 Expert Judgment ................................................................................................................................. 18
3.1.2.3 Meetings ............................................................................................................................................. 18
3.1.3 Identify Stakeholders: Outputs.................................................................................................................. 19
3.1.3.1 Stakeholder Register........................................................................................................................... 19
3.2 Plan Stakeholder Management .................................................................................................................... 19
3.2.1 Plan Stakeholder Management: Inputs ..................................................................................................... 20
3.2.2 Plan Stakeholder Management: Tools and Techniques ............................................................................ 21
Chapter 1 Introduction .................................................................................................................................. 6
Introduction:-- ...................................................................................................................................................... 6
Project stakeholders ............................................................................................................................................. 7
The stakeholder categories identified as:............................................................................................................. 7
Need of study........................................................................................................................................................ 8
Aim........................................................................................................................................................................ 8
OBJECTIVE ............................................................................................................................................................. 8
Scope of the Study: ............................................................................................................................................... 8
Methodology ........................................................................................................................................................ 9
Chapter 2 Literature Review ....................................................................................................................... 10
External Stakeholder Management in the Construction Process (Olander, 2003) ............................................ 10
Investigating the Stakeholder Management in Construction Projects in the Gaza Strip ................................... 10
Stakeholder management in construction: An empirical study to address research gaps in previous studies
(Jing Yanga, 2010) ............................................................................................................................................... 11
Construction project success analysis from stakeholders' theory perspective (Moradi, 2011)......................... 11
Strategic Management of Stakeholders: Theory and Practice (Eden, 2010)...................................................... 11
Project Stakeholder Management (Jepsen, 2013) .............................................................................................. 12
Chapter 3 Management of Stakeholders .................................................................................................... 13
PROJECT STAKEHOLDER MANAGEMENT ............................................................................................................ 13
3.1 Identify Stakeholders .................................................................................................................................... 14
3.1.1 Identify Stakeholders: Inputs................................................................................................................. 16
3.1.1.1 Project Charter.................................................................................................................................... 16
3.1.1.2 Procurement Documents.................................................................................................................... 16
3.1.1.3 Enterprise Environmental Factors ...................................................................................................... 16
3.1.1.4 Organizational Process Assets ............................................................................................................ 16
3.1.2 Identify Stakeholders: Tools and Techniques ............................................................................................ 16
3.1.2.1 Stakeholder Analysis........................................................................................................................... 16
3.1.2.2 Expert Judgment ................................................................................................................................. 18
3.1.2.3 Meetings ............................................................................................................................................. 18
3.1.3 Identify Stakeholders: Outputs.................................................................................................................. 19
3.1.3.1 Stakeholder Register........................................................................................................................... 19
3.2 Plan Stakeholder Management .................................................................................................................... 19
3.2.1 Plan Stakeholder Management: Inputs ..................................................................................................... 20
3.2.2 Plan Stakeholder Management: Tools and Techniques ............................................................................ 21
Stakeholder Management In Construction Industry
Girish Kumar Singh SPA/NS/BEM/612
Building Engineering & Management Department,
School of Planning & Architecture, New Delhi
3.2.2.1 Expert Judgment ................................................................................................................................. 21
3.2.2.2 Meetings ............................................................................................................................................. 22
3.2.2.3 Analytical Techniques ......................................................................................................................... 22
3.2.3 Plan Stakeholder Management: Outputs .................................................................................................. 23
3.2.3.1 Stakeholder Management Plan .......................................................................................................... 23
3.2.3.2 Project Documents Updates ............................................................................................................... 23
3.3 Manage Stakeholder Engagement................................................................................................................ 23
3.3.1 Manage Stakeholder Engagement: Inputs ............................................................................................ 25
3.3.2 Manage Stakeholder Engagement: Tools and Techniques.................................................................... 26
3.3.3 Manage Stakeholder Engagement: Outputs ......................................................................................... 26
3.4 Control Stakeholder Engagement................................................................................................................. 27
3.4.1 Control Stakeholder Engagement: Inputs.............................................................................................. 28
3.4.2 Control Stakeholder Engagement: Tools and Techniques..................................................................... 29
3.4.3 Control Stakeholder Engagement: Outputs........................................................................................... 30
Chapter 4 Stakeholders .................................................................................................................................. 1
4.1 Internal Stakeholder ....................................................................................................................................... 2
4.1.1 Project Owner .......................................................................................................................................... 3
4.1.2 The Project Professional .......................................................................................................................... 3
4.1.3 Suppliers/Contactors ............................................................................................................................... 3
4.1.4 Customer ................................................................................................................................................. 3
4.2 External Stakeholder....................................................................................................................................... 6
4.2.1 External Public Parties ................................................................................................................................. 7
4.2.2 External Private Parties................................................................................................................................ 7
4.2.1.1 Interests groups ........................................................................................................................................ 7
4.2.1.2 The Media ................................................................................................................................................. 7
4.2.1.3 Local and National Authorities ................................................................................................................. 7
4.2.2.1 The Public.................................................................................................................................................. 8
4.2.2.2 Trade and Industry.................................................................................................................................... 8
Chapter 5 Stakeholder involvement in Project Life Cycle........................................................................ 11
5.1 Phase Of construction Project and stakeholder involvement according the phase:- .................................. 11
5.1.1 Prefeasibility Phase.................................................................................................................................... 11
5.1.2 Feasibility Phase......................................................................................................................................... 12
5.1.3 Planning Phase........................................................................................................................................... 12
5.1.4 Initiation Phase ...................................................................................................................................... 12
5.1.5 Execution Phase......................................................................................................................................... 14
Girish Kumar Singh SPA/NS/BEM/612
Building Engineering & Management Department,
School of Planning & Architecture, New Delhi
3.2.2.1 Expert Judgment ................................................................................................................................. 21
3.2.2.2 Meetings ............................................................................................................................................. 22
3.2.2.3 Analytical Techniques ......................................................................................................................... 22
3.2.3 Plan Stakeholder Management: Outputs .................................................................................................. 23
3.2.3.1 Stakeholder Management Plan .......................................................................................................... 23
3.2.3.2 Project Documents Updates ............................................................................................................... 23
3.3 Manage Stakeholder Engagement................................................................................................................ 23
3.3.1 Manage Stakeholder Engagement: Inputs ............................................................................................ 25
3.3.2 Manage Stakeholder Engagement: Tools and Techniques.................................................................... 26
3.3.3 Manage Stakeholder Engagement: Outputs ......................................................................................... 26
3.4 Control Stakeholder Engagement................................................................................................................. 27
3.4.1 Control Stakeholder Engagement: Inputs.............................................................................................. 28
3.4.2 Control Stakeholder Engagement: Tools and Techniques..................................................................... 29
3.4.3 Control Stakeholder Engagement: Outputs........................................................................................... 30
Chapter 4 Stakeholders .................................................................................................................................. 1
4.1 Internal Stakeholder ....................................................................................................................................... 2
4.1.1 Project Owner .......................................................................................................................................... 3
4.1.2 The Project Professional .......................................................................................................................... 3
4.1.3 Suppliers/Contactors ............................................................................................................................... 3
4.1.4 Customer ................................................................................................................................................. 3
4.2 External Stakeholder....................................................................................................................................... 6
4.2.1 External Public Parties ................................................................................................................................. 7
4.2.2 External Private Parties................................................................................................................................ 7
4.2.1.1 Interests groups ........................................................................................................................................ 7
4.2.1.2 The Media ................................................................................................................................................. 7
4.2.1.3 Local and National Authorities ................................................................................................................. 7
4.2.2.1 The Public.................................................................................................................................................. 8
4.2.2.2 Trade and Industry.................................................................................................................................... 8
Chapter 5 Stakeholder involvement in Project Life Cycle........................................................................ 11
5.1 Phase Of construction Project and stakeholder involvement according the phase:- .................................. 11
5.1.1 Prefeasibility Phase.................................................................................................................................... 11
5.1.2 Feasibility Phase......................................................................................................................................... 12
5.1.3 Planning Phase........................................................................................................................................... 12
5.1.4 Initiation Phase ...................................................................................................................................... 12
5.1.5 Execution Phase......................................................................................................................................... 14
End of preview
Want to access all the pages? Upload your documents or become a member.
Related Documents
Mookambika Cashew Industry organizational Reportlg...
|28
|6970
|47
The Effect of Digital Marketing on Consumer Buying Behaviour: A Study in Nigerialg...
|53
|15697
|201
Summer Tarining Report Assignmentlg...
|37
|6413
|927
A Study of May & Baker Plc pdflg...
|127
|43743
|293
Intrusion Detection Network in Mobile Ad-Hoc Network: Comparison and Recommendationslg...
|97
|24679
|344
Information Communication Technology Assignmentlg...
|36
|8245
|241