System Analysis and Design of Student Enrolment System
VerifiedAdded on 2023/04/04
|17
|1683
|184
AI Summary
This document provides a system analysis and design of a student enrolment system, including justification, business case description, project scope, and cost analysis.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: STUDENT ENROLMENT SYSTEM
System Analysis and Design of Student Enrolment
System
Name of the Student
Name of the University
Author’s note:
System Analysis and Design of Student Enrolment
System
Name of the Student
Name of the University
Author’s note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1STUDENT ENROLMENT SYSTEM
Table of Contents
Justification for System:..................................................................................................................2
Business Case Description and Business Benefits from System Implementation:.........................2
Project Scope and Cost and Schedule Analysis:..............................................................................3
Use Case Diagram:..........................................................................................................................8
Data Flow Diagram:........................................................................................................................9
Entity Relationship Diagram:........................................................................................................11
Interfaces:......................................................................................................................................12
Gantt Chart:...................................................................................................................................14
Bibliography:.................................................................................................................................15
Table of Contents
Justification for System:..................................................................................................................2
Business Case Description and Business Benefits from System Implementation:.........................2
Project Scope and Cost and Schedule Analysis:..............................................................................3
Use Case Diagram:..........................................................................................................................8
Data Flow Diagram:........................................................................................................................9
Entity Relationship Diagram:........................................................................................................11
Interfaces:......................................................................................................................................12
Gantt Chart:...................................................................................................................................14
Bibliography:.................................................................................................................................15
2STUDENT ENROLMENT SYSTEM
Justification for System:
Information systems are consisted of electronic devices to access the system and database
to store the data collected from various devices. The proposed enrolment system will offer the
opportunity to convert the manual paper based works into technology driven automated
processes. The system will be covering entire enrolment system along with the course/program
management. The management can easily see the progress of works through the system. The
system will reduce the operational cost by making the back office processes automatic. This
means that teachers and other staff does not have to involve in handling paper works for
completing an enrolment. The management can see the enrolment reports based on semesters by
just selecting the semester and year in the report section.
Business Case Description and Business Benefits from System
Implementation:
The SPCB wants current information regarding the enrolment, student, courses and
program. The organization offers various courses that are available under various programs to
the potential student. The organization gathers student information such as name, address,
contact, email and many more. It is assumed that organization facing a fraud related issues. One
student can apply for multiple courses for a single semester and gets admission to the course he
gets selected. This is resulting in reducing the number of potential students as organization offer
limited sits for enrolment.
The information system will provide various advantages to SPCB. The biggest is the
fraud elimination. As the system will be tracking all the enrolment requests, the system will
automatically detect if a single student is applying for multiple courses. Moreover, the
Justification for System:
Information systems are consisted of electronic devices to access the system and database
to store the data collected from various devices. The proposed enrolment system will offer the
opportunity to convert the manual paper based works into technology driven automated
processes. The system will be covering entire enrolment system along with the course/program
management. The management can easily see the progress of works through the system. The
system will reduce the operational cost by making the back office processes automatic. This
means that teachers and other staff does not have to involve in handling paper works for
completing an enrolment. The management can see the enrolment reports based on semesters by
just selecting the semester and year in the report section.
Business Case Description and Business Benefits from System
Implementation:
The SPCB wants current information regarding the enrolment, student, courses and
program. The organization offers various courses that are available under various programs to
the potential student. The organization gathers student information such as name, address,
contact, email and many more. It is assumed that organization facing a fraud related issues. One
student can apply for multiple courses for a single semester and gets admission to the course he
gets selected. This is resulting in reducing the number of potential students as organization offer
limited sits for enrolment.
The information system will provide various advantages to SPCB. The biggest is the
fraud elimination. As the system will be tracking all the enrolment requests, the system will
automatically detect if a single student is applying for multiple courses. Moreover, the
3STUDENT ENROLMENT SYSTEM
organization can track all the internal processes effectively. Each data collected from the end
users will be verified. This will result in accurate data acceptance and reports quality will
automatically enhance. The system will also provide significant assistance to decision making.
Project Scope and Cost and Schedule Analysis:
The primary scope of the project is covering all the aspects of the enrolment process and
making it as automatic as possible. The second scope is validation of forms. Third scope is
implementing a centralized database management system. Fourth scope is implementing a
remote website.
WBS Task Name Duration Start Finish Predecessors Cost
Resource
Names
0
Student
Enrolment
System Project
119 days
Thu
5/30/19
Tue
11/12/19
$181,080.00
1 Sprint 1 49 days
Thu
5/30/19
Tue
8/6/19
$17,040.00
1.1
Sprint
Planning
3 days
Thu
5/30/19
Mon
6/3/19
$4,560.00
End
User,Project
Owner,Scrum
Master
1.2 Create 2 days Tue Wed 2 $2,880.00 Agile Team
organization can track all the internal processes effectively. Each data collected from the end
users will be verified. This will result in accurate data acceptance and reports quality will
automatically enhance. The system will also provide significant assistance to decision making.
Project Scope and Cost and Schedule Analysis:
The primary scope of the project is covering all the aspects of the enrolment process and
making it as automatic as possible. The second scope is validation of forms. Third scope is
implementing a centralized database management system. Fourth scope is implementing a
remote website.
WBS Task Name Duration Start Finish Predecessors Cost
Resource
Names
0
Student
Enrolment
System Project
119 days
Thu
5/30/19
Tue
11/12/19
$181,080.00
1 Sprint 1 49 days
Thu
5/30/19
Tue
8/6/19
$17,040.00
1.1
Sprint
Planning
3 days
Thu
5/30/19
Mon
6/3/19
$4,560.00
End
User,Project
Owner,Scrum
Master
1.2 Create 2 days Tue Wed 2 $2,880.00 Agile Team
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4STUDENT ENROLMENT SYSTEM
Database 6/4/19 6/5/19
1.3 Testing 5 days
Thu
6/6/19
Thu
6/27/19
3 $4,680.00
Agile
Team,End
User
1.4 Fix period 2 days
Wed
7/31/19
Thu
8/1/19
4 $2,880.00 Agile Team
1.5 Deploy 3 days
Fri
8/2/19
Tue
8/6/19
5 $2,040.00 Scrum Master
2 Sprint 2 51 days
Tue
6/4/19
Tue
8/13/19
$27,360.00
2.1
Sprint
Planning
3 days
Tue
6/4/19
Thu
6/6/19
2 $0.00
2.2
Create Website
Structure
3 days
Thu
6/13/19
Mon
6/17/19
3,8 $4,560.00
End
User,Project
Owner,Scrum
Master
2.3
Design
Website
7 days
Tue
6/18/19
Wed
6/26/19
9 $10,080.00 Agile Team
2.4 Testing 10 days Fri
6/28/19
Fri
7/12/19
4,10 $7,800.00 Agile
Team,End
Database 6/4/19 6/5/19
1.3 Testing 5 days
Thu
6/6/19
Thu
6/27/19
3 $4,680.00
Agile
Team,End
User
1.4 Fix period 2 days
Wed
7/31/19
Thu
8/1/19
4 $2,880.00 Agile Team
1.5 Deploy 3 days
Fri
8/2/19
Tue
8/6/19
5 $2,040.00 Scrum Master
2 Sprint 2 51 days
Tue
6/4/19
Tue
8/13/19
$27,360.00
2.1
Sprint
Planning
3 days
Tue
6/4/19
Thu
6/6/19
2 $0.00
2.2
Create Website
Structure
3 days
Thu
6/13/19
Mon
6/17/19
3,8 $4,560.00
End
User,Project
Owner,Scrum
Master
2.3
Design
Website
7 days
Tue
6/18/19
Wed
6/26/19
9 $10,080.00 Agile Team
2.4 Testing 10 days Fri
6/28/19
Fri
7/12/19
4,10 $7,800.00 Agile
Team,End
5STUDENT ENROLMENT SYSTEM
User
2.5 Fix period 2 days
Wed
8/7/19
Thu
8/8/19
5,11 $2,880.00 Agile Team
2.6 Deploy 3 days
Fri
8/9/19
Tue
8/13/19
12 $2,040.00 Scrum Master
3 Sprint 3 60 days
Fri
6/7/19
Thu
8/29/19
$37,920.00
3.1
Sprint
Planning
4 days
Fri
6/7/19
Wed
6/12/19
8 $6,080.00
End
User,Project
Owner,Scrum
Master
3.2
Develop
Course
Management
Module
7 days
Thu
6/27/19
Fri
7/5/19
15,9 $10,080.00 Agile Team
3.3
Development
Forms
5 days
Wed
7/24/19
Tue
7/30/19
16,10 $7,200.00 Agile Team
3.4
Add Buttons
and Links
3 days
Fri
8/2/19
Tue
8/6/19
17 $4,320.00 Agile Team
3.5 Testing 4 days Wed
8/7/19
Mon
8/12/19
18,11 $3,120.00 Agile
Team,End
User
2.5 Fix period 2 days
Wed
8/7/19
Thu
8/8/19
5,11 $2,880.00 Agile Team
2.6 Deploy 3 days
Fri
8/9/19
Tue
8/13/19
12 $2,040.00 Scrum Master
3 Sprint 3 60 days
Fri
6/7/19
Thu
8/29/19
$37,920.00
3.1
Sprint
Planning
4 days
Fri
6/7/19
Wed
6/12/19
8 $6,080.00
End
User,Project
Owner,Scrum
Master
3.2
Develop
Course
Management
Module
7 days
Thu
6/27/19
Fri
7/5/19
15,9 $10,080.00 Agile Team
3.3
Development
Forms
5 days
Wed
7/24/19
Tue
7/30/19
16,10 $7,200.00 Agile Team
3.4
Add Buttons
and Links
3 days
Fri
8/2/19
Tue
8/6/19
17 $4,320.00 Agile Team
3.5 Testing 4 days Wed
8/7/19
Mon
8/12/19
18,11 $3,120.00 Agile
Team,End
6STUDENT ENROLMENT SYSTEM
User
3.6 Fix period 4 days
Thu
8/22/19
Tue
8/27/19
19,12 $5,760.00 Agile Team
3.7 Deploy 2 days
Wed
8/28/19
Thu
8/29/19
20 $1,360.00 Scrum Master
4 Sprint 4 68 days
Thu
6/13/19
Mon
9/16/19
$46,880.00
4.1
Sprint
Planning
3 days
Thu
6/13/19
Mon
6/17/19
15 $0.00
4.2
Develop
Student Enrolment
Module
6 days
Tue
6/18/19
Tue
6/25/19
23,15 $9,120.00
End
User,Project
Owner,Scrum
Master
4.3 Develop Form 7 days
Mon
7/15/19
Tue
7/23/19
24 $10,080.00 Agile Team
4.4
Develop
JavaScript Font
End Animations
7 days
Tue
8/13/19
Wed
8/21/19
25 $10,080.00 Agile Team
4.5 Testing 8 days Thu
8/22/19
Mon
9/2/19
26,19 $6,240.00 Agile
Team,End
User
3.6 Fix period 4 days
Thu
8/22/19
Tue
8/27/19
19,12 $5,760.00 Agile Team
3.7 Deploy 2 days
Wed
8/28/19
Thu
8/29/19
20 $1,360.00 Scrum Master
4 Sprint 4 68 days
Thu
6/13/19
Mon
9/16/19
$46,880.00
4.1
Sprint
Planning
3 days
Thu
6/13/19
Mon
6/17/19
15 $0.00
4.2
Develop
Student Enrolment
Module
6 days
Tue
6/18/19
Tue
6/25/19
23,15 $9,120.00
End
User,Project
Owner,Scrum
Master
4.3 Develop Form 7 days
Mon
7/15/19
Tue
7/23/19
24 $10,080.00 Agile Team
4.4
Develop
JavaScript Font
End Animations
7 days
Tue
8/13/19
Wed
8/21/19
25 $10,080.00 Agile Team
4.5 Testing 8 days Thu
8/22/19
Mon
9/2/19
26,19 $6,240.00 Agile
Team,End
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7STUDENT ENROLMENT SYSTEM
User
4.6 Fix period 6 days
Tue
9/3/19
Tue
9/10/19
27,20 $8,640.00 Agile Team
4.7 Deploy 4 days
Wed
9/11/19
Mon
9/16/19
28 $2,720.00 Scrum Master
5 Sprint 5 41 days
Tue
9/17/19
Tue
11/12/19
$51,880.00
5.1
Sprint
Planning
3 days
Tue
9/17/19
Thu
9/19/19
29 $0.00
5.2
Develop
Validation Rules
6 days
Fri
9/20/19
Fri
9/27/19
31,24 $9,120.00
End
User,Project
Owner,Scrum
Master
5.3
Develop
Backend
Connection
6 days
Mon
9/30/19
Mon
10/7/19
32 $8,640.00 Agile Team
5.4
Optimize All
Codes
9 days
Tue
10/8/19
Fri
10/18/19
33 $12,960.00 Agile Team
5.5 Testing 4 days Mon
10/21/19
Thu
10/24/19
34,27 $6,240.00 Agile
Team,End
User
4.6 Fix period 6 days
Tue
9/3/19
Tue
9/10/19
27,20 $8,640.00 Agile Team
4.7 Deploy 4 days
Wed
9/11/19
Mon
9/16/19
28 $2,720.00 Scrum Master
5 Sprint 5 41 days
Tue
9/17/19
Tue
11/12/19
$51,880.00
5.1
Sprint
Planning
3 days
Tue
9/17/19
Thu
9/19/19
29 $0.00
5.2
Develop
Validation Rules
6 days
Fri
9/20/19
Fri
9/27/19
31,24 $9,120.00
End
User,Project
Owner,Scrum
Master
5.3
Develop
Backend
Connection
6 days
Mon
9/30/19
Mon
10/7/19
32 $8,640.00 Agile Team
5.4
Optimize All
Codes
9 days
Tue
10/8/19
Fri
10/18/19
33 $12,960.00 Agile Team
5.5 Testing 4 days Mon
10/21/19
Thu
10/24/19
34,27 $6,240.00 Agile
Team,End
8STUDENT ENROLMENT SYSTEM
User
5.6 Fix period 8 days
Fri
10/25/19
Tue
11/5/19
35,28 $11,520.00 Agile Team
5.7 Deploy 5 days
Wed
11/6/19
Tue
11/12/19
36 $3,400.00 Scrum Master
Use Case Diagram:
Figure 1: Use Case Diagram of Enrolment Management System
(Source: Created by Author)
User
5.6 Fix period 8 days
Fri
10/25/19
Tue
11/5/19
35,28 $11,520.00 Agile Team
5.7 Deploy 5 days
Wed
11/6/19
Tue
11/12/19
36 $3,400.00 Scrum Master
Use Case Diagram:
Figure 1: Use Case Diagram of Enrolment Management System
(Source: Created by Author)
9STUDENT ENROLMENT SYSTEM
Data Flow Diagram:
Figure 2: Context Level Diagram of Enrolment Management System
(Source: Created by Author)
Data Flow Diagram:
Figure 2: Context Level Diagram of Enrolment Management System
(Source: Created by Author)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10STUDENT ENROLMENT SYSTEM
Figure 3: Level 0 DFD of Enrolment Management System
(Source: Created by Author)
Figure 3: Level 0 DFD of Enrolment Management System
(Source: Created by Author)
11STUDENT ENROLMENT SYSTEM
Entity Relationship Diagram:
Figure 4: ERD of Enrolment Management System Database
(Source: Created by Author)
Entity Relationship Diagram:
Figure 4: ERD of Enrolment Management System Database
(Source: Created by Author)
12STUDENT ENROLMENT SYSTEM
Interfaces:
Figure 5: Home Page
(Source: Created by Author)
Figure 6: Input Page
(Source: Created by Author)
Interfaces:
Figure 5: Home Page
(Source: Created by Author)
Figure 6: Input Page
(Source: Created by Author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13STUDENT ENROLMENT SYSTEM
Figure 7: Report Page
(Source: Created by Author)
Figure 7: Report Page
(Source: Created by Author)
14STUDENT ENROLMENT SYSTEM
Gantt Chart:
Task Name Duration Start Finish
Student Enrolment System Project 119 days Thu 5/30/19Tue 11/12/19
Sprint 1 49 days Thu 5/30/19Tue 8/6/19
Sprint Planning 3 days Thu 5/30/19Mon 6/3/19
Create Database 2 days Tue 6/4/19 Wed 6/5/19
Testing 5 days Thu 6/6/19 Thu 6/27/19
Fix period 2 days Wed 7/31/19Thu 8/1/19
Deploy 3 days Fri 8/2/19 Tue 8/6/19
Sprint 2 51 days Tue 6/4/19 Tue 8/13/19
Sprint Planning 3 days Tue 6/4/19 Thu 6/6/19
Create Website Structure 3 days Thu 6/13/19Mon 6/17/19
Design Website 7 days Tue 6/18/19Wed 6/26/19
Testing 10 days Fri 6/28/19 Fri 7/12/19
Fix period 2 days Wed 8/7/19 Thu 8/8/19
Deploy 3 days Fri 8/9/19 Tue 8/13/19
Sprint 3 60 days Fri 6/7/19 Thu 8/29/19
Sprint Planning 4 days Fri 6/7/19 Wed 6/12/19
Develop Course Management Module7 days Thu 6/27/19Fri 7/5/19
Development Forms 5 days Wed 7/24/19Tue 7/30/19
Add Buttons and Links 3 days Fri 8/2/19 Tue 8/6/19
Testing 4 days Wed 8/7/19 Mon 8/12/19
Fix period 4 days Thu 8/22/19Tue 8/27/19
Deploy 2 days Wed 8/28/19Thu 8/29/19
Sprint 4 68 days Thu 6/13/19Mon 9/16/19
Sprint Planning 3 days Thu 6/13/19Mon 6/17/19
Develop Studemt Enrolment Mdoule6 days Tue 6/18/19Tue 6/25/19
Develop Form 7 days Mon 7/15/19Tue 7/23/19
Develop JavaScript Font End
Animations
7 days Tue
8/13/19
Wed
8/21/19
Testing 8 days Thu 8/22/19Mon 9/2/19
Fix period 6 days Tue 9/3/19 Tue 9/10/19
Deploy 4 days Wed 9/11/19Mon 9/16/19
Sprint 5 41 days Tue 9/17/19Tue 11/12/19
Sprint Planning 3 days Tue 9/17/19Thu 9/19/19
Develop Validation Rules 6 days Fri 9/20/19 Fri 9/27/19
Develop Backend Connection 6 days Mon 9/30/19Mon 10/7/19
Optimize All Codes 9 days Tue 10/8/19Fri 10/18/19
Testing 4 days Mon 10/21/19Thu 10/24/19
Fix period 8 days Fri 10/25/19Tue 11/5/19
Deploy 5 days Wed 11/6/19Tue 11/12/19
End User,Project Owner,Scrum Master
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Master
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Master
Agile Team
Agile Team
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Master
Agile Team
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Maste
Agile Team
Agile Team
Agile Team,End User
Agile Team
Scrum Master
S W S T
Apr 7, '19 Jun 16, '19 Aug 25, '19
Figure 8: Gantt Chart of SPCB Enrolment System ImpeProject
(Source: Created by Author)
Gantt Chart:
Task Name Duration Start Finish
Student Enrolment System Project 119 days Thu 5/30/19Tue 11/12/19
Sprint 1 49 days Thu 5/30/19Tue 8/6/19
Sprint Planning 3 days Thu 5/30/19Mon 6/3/19
Create Database 2 days Tue 6/4/19 Wed 6/5/19
Testing 5 days Thu 6/6/19 Thu 6/27/19
Fix period 2 days Wed 7/31/19Thu 8/1/19
Deploy 3 days Fri 8/2/19 Tue 8/6/19
Sprint 2 51 days Tue 6/4/19 Tue 8/13/19
Sprint Planning 3 days Tue 6/4/19 Thu 6/6/19
Create Website Structure 3 days Thu 6/13/19Mon 6/17/19
Design Website 7 days Tue 6/18/19Wed 6/26/19
Testing 10 days Fri 6/28/19 Fri 7/12/19
Fix period 2 days Wed 8/7/19 Thu 8/8/19
Deploy 3 days Fri 8/9/19 Tue 8/13/19
Sprint 3 60 days Fri 6/7/19 Thu 8/29/19
Sprint Planning 4 days Fri 6/7/19 Wed 6/12/19
Develop Course Management Module7 days Thu 6/27/19Fri 7/5/19
Development Forms 5 days Wed 7/24/19Tue 7/30/19
Add Buttons and Links 3 days Fri 8/2/19 Tue 8/6/19
Testing 4 days Wed 8/7/19 Mon 8/12/19
Fix period 4 days Thu 8/22/19Tue 8/27/19
Deploy 2 days Wed 8/28/19Thu 8/29/19
Sprint 4 68 days Thu 6/13/19Mon 9/16/19
Sprint Planning 3 days Thu 6/13/19Mon 6/17/19
Develop Studemt Enrolment Mdoule6 days Tue 6/18/19Tue 6/25/19
Develop Form 7 days Mon 7/15/19Tue 7/23/19
Develop JavaScript Font End
Animations
7 days Tue
8/13/19
Wed
8/21/19
Testing 8 days Thu 8/22/19Mon 9/2/19
Fix period 6 days Tue 9/3/19 Tue 9/10/19
Deploy 4 days Wed 9/11/19Mon 9/16/19
Sprint 5 41 days Tue 9/17/19Tue 11/12/19
Sprint Planning 3 days Tue 9/17/19Thu 9/19/19
Develop Validation Rules 6 days Fri 9/20/19 Fri 9/27/19
Develop Backend Connection 6 days Mon 9/30/19Mon 10/7/19
Optimize All Codes 9 days Tue 10/8/19Fri 10/18/19
Testing 4 days Mon 10/21/19Thu 10/24/19
Fix period 8 days Fri 10/25/19Tue 11/5/19
Deploy 5 days Wed 11/6/19Tue 11/12/19
End User,Project Owner,Scrum Master
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Master
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Master
Agile Team
Agile Team
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Master
Agile Team
Agile Team
Agile Team,End User
Agile Team
Scrum Master
End User,Project Owner,Scrum Maste
Agile Team
Agile Team
Agile Team,End User
Agile Team
Scrum Master
S W S T
Apr 7, '19 Jun 16, '19 Aug 25, '19
Figure 8: Gantt Chart of SPCB Enrolment System ImpeProject
(Source: Created by Author)
15STUDENT ENROLMENT SYSTEM
Bibliography:
Abankina, Irina Vsevolodovna, and Liudmila Filatova. "Sustaining student enrolment: impact of
demand trends for higher education in Russia." Journal of US-China Public Administration 12,
no. 5 (2015): 345-359.
Ganesan, L., Dalia Ignatius, and B. Neppolian. "Potential for Entrepreneurship in E-Learning
System of Higher Education in India: A Bird View Study." (2018).
Okokpujie, Kennedy O., Etinosa Noma-Osaghae, Olatunji J. Okesola, Samuel N. John, and
Okonigene Robert. "Design and implementation of a student attendance system using iris
biometric recognition." In 2017 International Conference on Computational Science and
Computational Intelligence (CSCI), pp. 563-567. IEEE, 2017.
Pathak, Pinal, M. M. Paratnale, D. R. Khairnar, P. V. Yadhav, and P. R. Wadgaonkar. "Student
Attendance Monitoring System Via Face Detection and Recognition System." International
Journal of Science Technology & Engineering (IJSTE) 2, no. 11 (2016).
Rodríguez-Gómez, David, Julio Meneses, Joaquín Gairín, Mònica Feixas, and José Luís Muñoz.
"They have gone, and now what? Understanding re-enrolment patterns in the Catalan public
higher education system." Higher Education Research & Development 35, no. 4 (2016): 815-
828.
Sharma, Sahil, and Purnendu Sharma. "Indian higher education system: challenges and
suggestions." Electronic Journal for Inclusive Education 3, no. 4 (2015): 6.
Thangavelu, Anbarasu, Helen Partridge, Kathy Carey, Carmel O'Sullivan, and Naomi Lutvey.
"Evaluating the student experience with enrolment assistance in an integrated student support
Bibliography:
Abankina, Irina Vsevolodovna, and Liudmila Filatova. "Sustaining student enrolment: impact of
demand trends for higher education in Russia." Journal of US-China Public Administration 12,
no. 5 (2015): 345-359.
Ganesan, L., Dalia Ignatius, and B. Neppolian. "Potential for Entrepreneurship in E-Learning
System of Higher Education in India: A Bird View Study." (2018).
Okokpujie, Kennedy O., Etinosa Noma-Osaghae, Olatunji J. Okesola, Samuel N. John, and
Okonigene Robert. "Design and implementation of a student attendance system using iris
biometric recognition." In 2017 International Conference on Computational Science and
Computational Intelligence (CSCI), pp. 563-567. IEEE, 2017.
Pathak, Pinal, M. M. Paratnale, D. R. Khairnar, P. V. Yadhav, and P. R. Wadgaonkar. "Student
Attendance Monitoring System Via Face Detection and Recognition System." International
Journal of Science Technology & Engineering (IJSTE) 2, no. 11 (2016).
Rodríguez-Gómez, David, Julio Meneses, Joaquín Gairín, Mònica Feixas, and José Luís Muñoz.
"They have gone, and now what? Understanding re-enrolment patterns in the Catalan public
higher education system." Higher Education Research & Development 35, no. 4 (2016): 815-
828.
Sharma, Sahil, and Purnendu Sharma. "Indian higher education system: challenges and
suggestions." Electronic Journal for Inclusive Education 3, no. 4 (2015): 6.
Thangavelu, Anbarasu, Helen Partridge, Kathy Carey, Carmel O'Sullivan, and Naomi Lutvey.
"Evaluating the student experience with enrolment assistance in an integrated student support
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
16STUDENT ENROLMENT SYSTEM
service program at the University of Southern Queensland." Student Success 10, no. 1 (2019):
99-114.
service program at the University of Southern Queensland." Student Success 10, no. 1 (2019):
99-114.
1 out of 17
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.