Table of ContentsIntroduction...........................................................................................................................................2Project Overview...............................................................................................................................2Project Background...........................................................................................................................21. Part One: (15 Marks).........................................................................................................................21.1 MOV - Measurable Organisational Value (5 Marks).....................................................................21.2 SUMMARISE THE MOV IN A CLEAR CONCISE STATEMENT..........................................................21.3 MOV Metrics................................................................................................................................22. Part Two:..........................................................................................................................................32.1 Scope...........................................................................................................................................32.2 Out of Scope................................................................................................................................32.3 Assumptions................................................................................................................................32.4 Constraints...................................................................................................................................32.5 Scope Management Plan.............................................................................................................42.6 Resource Plan (from MS-Project).................................................................................................43. Part Three..........................................................................................................................................64. Part Four............................................................................................................................................94.1 Assumptions................................................................................................................................94.2 Risk Analysis.................................................................................................................................95. Part Five.............................................................................................................................................95.1 Quality Statement........................................................................................................................95.2 Verification Activity......................................................................................................................95.3 Validation Activities.....................................................................................................................96. Part Six.............................................................................................................................................106.1 Annotated Bibliography.................................................................................................................106.2 Checklist.....................................................................................................................................106.3 Evaluation Criteria.....................................................................................................................10Bibliography.........................................................................................................................................11Appendix: Annotated Bibliography......................................................................................................12

IntroductionProject OverviewThe project of Farm Management System for Stud Farm would be developed based on thetraditional waterfall methodology. The activities of the project are sequentially aligned and it wouldresult in forming the successive alignment of the activities. The project development would beformed for ensuring that the system is working effectively.Project BackgroundThe organization of Stud Farm has been dealing with the concept and development of the activitiesfor aligning with the development of the activities. The implication would also form the utilization ofthe operations using the implication of the operations. The development of the farm would alignwith the implication of the successive alignment of the operations. The project would form thealignment of the system for easing the payment process and development of the activities. 1. Part One: (15 Marks)1.1 MOV - Measurable Organisational Value (5 Marks)Area of ImpactRank (1 to 5)Operational1Customer2Financial3Social 4Strategy51.2 SUMMARISE THE MOV IN A CLEAR CONCISE STATEMENTThe project of Farm Management System for Stud Farm would be based on the alignment of the technology development. However, the project would form the major alignment of the activities andit would form the development of the activities. Better – Operational development would help in easing the activities and probability ofdeveloping improved functions for Stud FarmFaster – Operational development using effective implementation would be eased bythe alignment of the faster processes for the organizationCheaper – The overall expense of the project would be reduced due to the automationof the project activities. Do more – The cloud computing can be implemented by the use of the FarmManagement System in Stud Farm

1.3 MOV MetricsArea of ImpactTime Frame (months)MetricsOperational4Number of possible operations Customer6Total number of customersFinancial12Net profit Social 3People following the organizationStrategy5Marketing strategy for the project2. Part Two:2.1 ScopeThe project scopes for the development of effective project plan Project would consider the proper documentation Design for the system is developed Integrated database would be deployed Complete system would be developed 2.2 Out of ScopeProcurement agreement would not be considered for the project development Alignment for the development of the activities for forming the utilization of the project completion2.3 AssumptionsThe project form the development of effective project plan The project forms the proper documentation Design for the system is developed using the profound management Integrated database would be deployed in the expected quality managementComplete system would be developed in the estimated time duration 2.4 ConstraintsTime, budget, and quality are the constraints of the project of Farm Management System for Stud Farm

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Stud Farm Management System for Stud Farm Introduction 2 Project Overview 2
|16
|1984
|340

Developing Online Farm Management System for Stud Farm
|12
|2347
|432

Farm Management System for Stud Farm - Project Overview, Background, Scope, Resources, and Time Estimation
|18
|3628
|58

Online Farm Management System for Stud Farm - MOV, Scope, Resource Plan, Risk Analysis, Quality Statement
|13
|2831
|102

Project Plan Assignment - (Doc)
|21
|3363
|24

Developing Online Stud Farm Management System PDFv
|17
|2531
|29