Running head: SUPPLY CHAIN MANAGEMENT PLATFORM Assignment 2: Australia’s Woolworths Chooses Supply Chain Management Platform Name of the Student: Name of the University:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1SUPPLY CHAIN MANAGEMENT PLATFORM 1. Sponsor letter To, The ABC software consultancy Since last 2 to 3 years our company is facing some operational and functional issues. We would like to implement a supply chain management system. In order to improve the existing customer base we want to implement the supply chain management system. We request you to sponsor a capital amount of $80,000 so that we can implement the system successfully within 6 months. -Thanks and regards Woolworths Limited Group 2. Project proposed The project that has been proposed for Woolworths limited is Implementation of a Supply chain management system within 6 months and a budget of $80,000.
2SUPPLY CHAIN MANAGEMENT PLATFORM Table of Contents 1. Sponsor letter...................................................................................................................1 2. Project proposed..............................................................................................................1 4. Executive summary.........................................................................................................3 5. Introduction......................................................................................................................3 6. Context of the organization.............................................................................................4 6.1 Vision.........................................................................................................................4 6.2 Mission......................................................................................................................4 6.3 Business process........................................................................................................4 7. Internal environment........................................................................................................5 7.1 Structure.....................................................................................................................5 7.2 Leadership..................................................................................................................6 7.3 Culture.......................................................................................................................6 8. External environment.......................................................................................................7 8.1 PESTLE analysis...........................................................................................................7 8.2 SWOT analysis..........................................................................................................8 9. Project planning.............................................................................................................10 9.1 Identification of problem and opportunities available for Information System......10 9.2 IT infrastructure problems may occur.....................................................................11 9.3 IS/IT system (Managing Information system).........................................................11 9.4 Function...................................................................................................................11 9.5 Cost feasibility.........................................................................................................12 9.5.1 Tangible benefits..................................................................................................12 9.5.2 Intangible benefits................................................................................................12 10. System analysis............................................................................................................13 10.1 Business improvement...........................................................................................13 10.2 Functional requirements........................................................................................13 10.3 Non-functional requirements.................................................................................13 11. Build vs. Buy...............................................................................................................14 11.1 Design....................................................................................................................14 11.2 Develop..................................................................................................................15 12. Testing.........................................................................................................................16 12.1 Method selected.....................................................................................................16
3SUPPLY CHAIN MANAGEMENT PLATFORM 12.2 Implementation......................................................................................................16 12.3 Maintenance...........................................................................................................16 12.4 Project management...............................................................................................17 12.4.1 Risk management................................................................................................17 12.4.2 Role of a project manager...................................................................................18 References..........................................................................................................................19
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4SUPPLY CHAIN MANAGEMENT PLATFORM 4. Executive summary This report reflects the issues that the customers of Woolworths Limited were facing due to lack of operational and functional deficiency. After analyzing the detail supply chain structure of the company it is recognized that the company’s supply base is weak and no customer focused. In this proposal a detail supply chain management process is implemented followed by the other functional and nn functional development aspects. 5. Introduction This report depicts importance of using project management planning prcatices essential for designing and implementing any advanced IT excellence in a business organization. Today’s business to business ecommerce service innovators are extremely focused on small, medium and large sized business organization. The project scenario and organizational context that is considered for this report is implementation of supply chain management system in Woolworth Limited. For different organizations mission, vision and business processes are also different. Woolworths Limited was facing various functional and operational risks due to lack of IS/IT excellence. The problem scenario for which the company’s revenue structure was getting interrupted is elaborate in this report. Apart from that, both the internal and external business environment was analyzed in terms of PESTLE analysis, SWOT analysis and other factors analysis. The steps following which Woolworths Limited can earn effective commercial revenue in terms of design, development, planning, testing, maintenance and implementation are also elaborated in this report.
5SUPPLY CHAIN MANAGEMENT PLATFORM 6. Context of the organization 6.1 Vision The vision of Woolworths Limited is to become one of the leading global retailers by delivering best in convenience, quality and values for their customers. The total numbers of employees working for the organization are 201,000 and Woolworths serves for more than 29 Millions of customers. Woolworths Limited is much trusted business partners as well. 6.2 Mission The mission of Woolworths Limited is to grow its market capabilities by improving the operational and functional excellence of the company in terms if IS/IT system implementation. The revenue expected from the company is all related to the vision statement (De Marco, Demagistris and Mangano 2018).The mission of the company is to give best shopping experience to their customers with effective and affordable services. The organization is made up of numbers of departments. The departments will work all together for giving the best possible outcomes. The mission of Woolworths Limited is to give best ever shopping experiences to the global customers. 6.3 Business process WoolworthsLimitedisoneofthelargestretailorganizationsinAustraliathat encompasses different well known brands which includes Woolworth’s supermarket, BIG W etc. The company is committed to continuous business process improvement plan for organizational growth and its commercial profit as well. Woolworths implies process oriented an approach that enables the organization’s business development and ongoing operational improvement as well. It develops the company’s business process capabilities (Yuliadi and Nugroho 2019). The B2B
6SUPPLY CHAIN MANAGEMENT PLATFORM EDI gateway enables the transactional exchange between Woolworths Limited and its trade partners. The business process follows by Woolworths Limited reduces the issues manual intervention, delicacy issues and process automation as well. Users can purchase orders and give quick response on the given orders. It gives opportunities to deliver advanced shipping notice and electronic invoice or feedback facilities to the customers. The E-Commerce values follow by Woolworths Limited gives biggest values and higher conversion rates for faster order fulfillment and direct relationship set up with the customers (Malawige, N.N., 2018). The sales process to reach new market competitors also become easier with B2B business process. However, the supply chain process of the organization is effective enough, due to this reason the company has planned to implement an advanced supply chain management system to improve their operational and functional activities. 7. Internal environment 7.1 Structure The organizational structure of Woolworths Limited is comprises of three stage Board of directors, N1 and N2. The CEO of the company is Brad Banducci and the five directors of the company are Jillian Broadbent, Jennifer Carr smith, Holly Kramer, Siobhan McKenna, Scott Perkins, Kathee Tesija and Micheal Ullmer. The CFO and COO of the organization are Stephen Harrison. The N2 associates of the organization are fiance manager, legal advisor, marketing head, HR manager, supply chain manager. The internal structure of the company also holds chief general manager refresh 3, director supermarket, chief logistic and information officer, general manager business development,
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7SUPPLY CHAIN MANAGEMENT PLATFORM general manager supermarket operations, Gm corporate services, GM Woolworths Academy, GM Big W and GM Property. In order to implement the project the timeline and budget will all estimated by the assigned project manager and checked by the project team associates. 7.2 Leadership The leadership style of Woolworths Limited is completely different for any other retail organization. In this present era of competition being leadership and competition it is determined that market position maintenance is referred to a one of the most essential thing (Ayers and Odegaard 2017). A manager must possess proper leadership features as well. In order to improve performance of the organization and individual associate leadership is very important. However, it is identified that performance of Woolworths Limited is getting negative affected due to lack of leadership skill among the company associates. In order to effectively manage the business activities proper leadership is lagged (Park and Lee 2018.). Due to lack of proper leadership there was no one to direct and support the team towards the preliminary objectives. The integrity of the business organization was not properly managed throughout. In ordertoimprovethebusinessstructurethemanagementteamassociateneedtohold transformational leadership and transactional leadership skills as well. 7.3 Culture Ithasbeendeterminedthat,thecompanyisearninghugerevenuefromglobal competitive market due to its organizational behavior. During recession employee motivation is very essential to give probably the best working experience to the staffs. In most cases the employees of Woolworths are driven by money. However, for all case salary is not important enough for the improving the organization culture (Kumaret al.2019). The staffs were
8SUPPLY CHAIN MANAGEMENT PLATFORM effectively motivated through improvement of work culture. The process of giving feedback was very poor for Woolworths Limited. It is role of the project team members and other company associates to motivate each other to create a great work culture to improve the productivity and quality of services as well. In order to improve the work culture and workplace environment the organization need to consider organizational behavioral theories and practically implement those. 8. External environment 8.1 PESTLE analysis PESTLE is the other analytical tool used to analyze the external environment of Woolworths Limited. Performance of the company can be either negatively or positively impacted due to the external factors. Political factor: The performance of Woolworths Limited is getting highly affected because of the political environment. Some of the major independent players like Woolworths; Coles etc are becoming unable to eliminate competitions due to the recently launched Australian competition policy (Thorlakson, Hainmueller and Lambin 2018). The market dominance of these retailers has resulted struggle for the retail industry. Economic factor:The performance of Woolworths Limited is declining due to economic condition throughout Australia. The international market operation of Woolworths Limited is getting affected adversely for the declining economic market. Social factor: The social factors of Australia are also affecting the retail market and preventingWoolworthstoreachsocietalandcommunitydevelopmentexpectations.Itis
9SUPPLY CHAIN MANAGEMENT PLATFORM happening because of the social trends available within the customers. The negative societal initiatives are creating significant negative impact on the retail operations. Technical factors: The business and operation environment of Woolworths Limited is getting negatively impacted due to the technical factors. Woolworths Limited has significantly considered the green refrigeration 8.2 SWOT analysis SWOT analysis Strength ï‚·WoolworthsLimitedisoneofthe oldestretailcompaniesinAustralia infact known as pioneer of retail trade business model ï‚·Woolworths Limited retail group holds more than 900 stores allover Australia ï‚·Thebrandnameofthecompanyis strongenoughandknownforits operational efficiency ï‚·The company is successful to retain its around 10,000 employees ï‚·Infactinordertobringcommercial revenueWoolworthshasdifferent brandloyaltyschemefortheir Weaknesses ï‚·The international or global presence of the company is low than m any others ï‚·The supplier relations of Woolworths Limited holds a dominant position
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10SUPPLY CHAIN MANAGEMENT PLATFORM customers Many private label brand are owned by Woolworthsthat are enough popular among customers Opportunities Thecompanyhasopportunityto promotetheirproductsthrough advertisement,promotionalactivities, socialmediapresenceand advertisement as well The company has opportunity to open new store in new locations which might boost the business grow (Gürel and Tat 2017) Inordertoearnmorecustomer experiencesithasopportunitiesto enhance big data analytics for business effectiveness and efficiency Threats Many similar companies are entering to the market as tough competitors Theonlinemarketgrowthofthe company is lesser than many others. Thecommercialgrowthofthe companyisgettingaffecteddueto governmental interventions.
11SUPPLY CHAIN MANAGEMENT PLATFORM 9. Project planning 9.1 Identification of problem and opportunities available for Information System After analyzing the current operational and functional activities it is defined that, benefits and working efficiencyof Information system can be divided into tangible benefitsand intangible benefits. The users can gather all useful information those are needed to do any task ontimeandwithinassignedbudget.Duetodeliveryofqualityproductsandservices Woolworths Limited has become one of the most demanding retail organizations all over Australia. The numbers of customers for Woolworths was increasing rapidly and managing large numbers of customer and respective data have become a major problem. Managing large set of data has become a major issue for Woolworths Limited. The chances of error occurrence were also very high in case of manual data management. The manual data management issue was completely resolves with advanced automated data management. Information system gives information access opportunities to all the project team associates. The process of decision making also become easier with this approach. It also gives high level security to data stored in the server. It allows only the authorized person accessing data from server. The degree of productivity gets improved and data comparison becomes easier with this application. It gives real time information sharing opportunities along with reliability, accountability, security, scalability and accessibility to users. In order to improve the identified issues of Woolworths limited the company has planned to implement supply chain management in their regular business operations and function. The possible opportunities that the company will earn with this application include- effective and efficient business process, the business cooperation gets improved, the supply chain network of
12SUPPLY CHAIN MANAGEMENT PLATFORM the company also gets improved and the commercial profit rate of the organization also gets improved a lot with this technical implementation (Düerkop and Huth 2017). Apart from this, it also helps to create good relationship between the suppliers and owners. The logistics of the company gets improved a lot with this application. Infact the product, facilities, finances also helps to create good relationship between the business operators. 9.2 IT infrastructure problems may occur For the above mentioned issues and opportunities the IT infrastructure of Woolworths Limited can be interrupted. If all the security aspects were not properly managed and handled by the project team, then the company may face major functional and operational risks. 9.3 IS/IT system (Managing Information system) Managing Information System (MIS) is used by the project development team to give better decision making opportunities to the developers (Phadermrod, Crowder and Wills 2019). Developers can focus on different organizational assets such as financial, inventory, real estate, manufacturing, marketing, R&D, raw materials, project timelines etc. Woolworths Limited SCM project development team needs to manage the information system to for collecting useful data from various sources. With the help of MIS customers and employees can access all uptodate information. Information can be inserted easily. Information delete, update, insertion activities become easier than any other. 9.4 Function The SCM improve the relationship between the service providers and customer.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13SUPPLY CHAIN MANAGEMENT PLATFORM 9.5 Cost feasibility 9.5.1 Tangible benefits ThetotalbudgetestimatedfordesignandimplementationoftheSupplychain management system is $80,000. The tangible benefits that Woolworths Limited can earn from the SCM are listed in a quantifiable form. For this project the components that will give tangible benefits include: ï‚·SCM contractual items ï‚·Paid time off ï‚·Insurance cost ï‚·Detail profit and salary sharing 9.5.2 Intangible benefits The company would be able to earn intangible benefits from the below components: ï‚·Flexible shift timing to the employees ï‚·Supporting and motivating collegues ï‚·Skilled employees ï‚·Capital managing expertise availability in the workplace
14SUPPLY CHAIN MANAGEMENT PLATFORM 10. System analysis 10.1 Business improvement In order to improve the current business process of Woolworths Limited the actins to be considered include: ï‚·Process mapping ï‚·Proper analysis of the process ï‚·Redesign the process ï‚·Resource acquiring and implementing and communicating changes ï‚·Continuous change management plan ï‚·Review the process periodically 10.2 Functional requirements ï‚·Setup proper business requirements ï‚·Proper administrative functions including authentication and authorization level ï‚·Timely audit tracking ï‚·Requirement certification and reporting requirements ï‚·Keeping all historical data ï‚·Legal and other regulatory requirements 10.3 Non-functional requirements ï‚·Performance, capacity and data integrity of the system ï‚·Proper serviceability, maintainability, security and manageability
15SUPPLY CHAIN MANAGEMENT PLATFORM ï‚·Availability, reliability and usability ï‚·Interoperability, regulatory and recoverability of the system 11. Build vs. Buy 11.1 Design For designing the SCM system SDLC development phases are required to be followed in terms of system planning, source, making, delivery and returning. Procurement is defined as acquisition of services ad goods at the best possible price in correct quantity at proper time (Rao, Kumar and Reddy 2018). In order to build good relationship with customer SCM system implementation is essential.Before developing the SCM company needs to negotiate the contract for successful schedule delivery. Supply chain management is referred to as one of the integral part for most of the businesses and essential to satisfy the expectation of the customers. The customer service channel of the company will be improved. In other words, the customer service will be boost up. Customers of the company will be able to get 24X7 service from the providers (Parihar and Bharti 2019). The customers can give on time delivery with a proper sales support. The customer service delivery structure follows by Woolworths Limited is weak. The SDLC stages to be followed to complement the SCM system are as follows: Project initiation: As soon as the contract is signed the project manager gets into the planning phase. In this stage the objectives, aim and project goal are measured. A project charter that includes expected budget, timeline, risk log, communication plan and major deliverables are prepared and shared among the team members in this stage.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16SUPPLY CHAIN MANAGEMENT PLATFORM Project design stage: In this phase the project scope statement is developed. The time and detail budget distribution are also done in this stage. Apart from that hardware, software, technical and non-technical components those are essential for the implementations are needed to be considered in this stage. After that, detail and major milestones should be set in this phase (Jie and Gengatharen 2019). Risk, communication, quality and procurement are the different project management aspects considered in this project planning phase. Before designing the project brainstorming, interviews, focus group, wireframes, mind map, documentation, user stories are needed to be created. In the planning phase all required data and specifications are needed to be collected from various resources. 11.2 Develop Project development stage:In order to design and SCM for Woolworths Limited the two design aspects those are to be considered include technical architecture and UI/UX design standards. Appropriate design of the SCM system prototype will give clear mockup, wireframes, workflow diagram, architecture description documentation and technology lists as well. After complete design the system is developed in this stage. In this stage the software developers set up an accurate working environment and start writing based on the requirements. Stakeholderengagementstrategy,riskmanagement,communicationplanaretheother development aspect must be considered to create the complete design (Thorlakson, Hainmueller and Lambin 2018). The software specifications and hardware specifications are all properly met or not must integrate all together.
17SUPPLY CHAIN MANAGEMENT PLATFORM 12. Testing Testing phase: After completing the SCM structure it has to be tested before final execution. The project testing stage is comprises of three phases unit testing, integrated testing and user acceptance testing. Apart from that, the quality control supervisor must ensure that the project quality has met the project objectives and other specifications. 12.1 Method selected In order to develop or implement the SCM system for Woolworths among the different SDLC, agile development method is selected. Agile development method is selected for the projectbecauseitgivesefficiencyaswellasprocessimprovementopportunitiestothe development team. Agile also helps the team to avoid some common project development pitfalls related to cost, schedule, resources, quality etc. In this method multiple numbers of activities can run paralelly. Infact, if required specific project activity can be modified even after it is implemented. This method helps project development team to keep focused on the business values. Companies those are customer focused use this development method. It helps the project team to complete any project on predicted time and cost. 12.2 Implementation 12.3 Maintenance Maintenancephase:AftertestingtheSCMsystemdesignanddeveloped,post maintenance program must be developed in this stage (Singh, Shukla and Mishra 2018). Post project maintenance will make sure that the system has specific abilities to administrate the service expected from the Woolworths Limited company.
18SUPPLY CHAIN MANAGEMENT PLATFORM Project closure: The project must be closed followed by stakeholder signoff, final draft work submission and post maintenance program evaluation. 12.4 Project management 12.4.1 Risk management In order to control the performance of the SCM the potential risks and respective management plan that are to be considered are elaborated in the risks log plan. Risk Id Risk NameImpactLikelihoodRisk ranking Risk mitigation strategy R1Overrunning project budget High (4)Likely (4)Medium (16) Beforedevelopingthe finalprojectbudgeta feasibility report needs to be created R2Overallocationof project resources High (4)Most likely (5) High (20) Resourcesmustbe allocatedtoeachproject development activity based ontheirindividual complexity(Fernandoet al.2018) R3Overrunning project timeline Catastrophic (5) Possible (3) Medium (15) Aftermeasuringthe complexity of each SCM development activity time distribution must be done
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
19SUPPLY CHAIN MANAGEMENT PLATFORM by the project manager and team R4Selectionof incorrecttooland development techniques Catastrophic (5) unlikely (2)Medium (10) Comparingallpossible technicalandtoolsthe affordable one has to be chosen and applied R5Insufficient communication and lackoftechnical skillsamongthe projectteam associates High (4)rare (1)Low (4)Open communication and on-jobtrainingprogram has to be arranged by the membersofWoolworths toimprovethetechnical and non technical skills of the project associates and employees as well. 12.4.2 Role of a project manager Theassignedprojectmanagerneedstobeplaythebelowmentionedrolesand responsibilities: ï‚·Theprojectmanagershouldhavegoodcommunication,leadershipand communication skills
20SUPPLY CHAIN MANAGEMENT PLATFORM ï‚·Before implementing the project a detail budget and timeline needs to be prepared by the project manager ï‚·Should have strong risk management abilities ï‚·Must work directly with the vendors to control the project quality ï‚·Should take all possible decision making power ï‚·The main role of the project manager is to complete a project on time and within estimated budget without any delay
21SUPPLY CHAIN MANAGEMENT PLATFORM References Acheampong, B., 2017. A marketing plan for the headquarters of American Premium Enterprise Limited. Andry, J.F., 2017. Development Information Systems of Freight Forwarding with Agile SDLC. InThe 3rd International Conference on Engineering of Tarumanagara. Arora, R. and Arora, N., 2016. Analysis of SDLC models.International Journal of Current Engineering and Technology,1(1), pp.1-6. Ayers, J.B. and Odegaard, M.A., 2017.Retail supply chain management. CRC Press. De Marco, A., Demagistris, P.E. and Mangano, G., 2018, September. 9. Project Management Trends in the Automotive Supply Chain. InProject Management: Driving Complexity. PMI® Italian Academic Workshop(Vol. 43, p. 5). Sapienza Università Editrice. Demirkesen, S. and Ozorhon, B., 2017. Impact of integration management on construction projectmanagementperformance.InternationalJournalofProjectManagement,35(8), pp.1639-1654. Düerkop, S. and Huth, M., 2017. Transportation under Threat–A PESTLE Analysis for Critical Logistical Infrastructures.ICTA2017, p.14. Fernando, Y., Walters, T., Ismail, M.N., Seo, Y.W. and Kaimasu, M., 2018. Managing project successusingprojectriskandgreensupplychainmanagement.InternationalJournalof Managing Projects in Business.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
22SUPPLY CHAIN MANAGEMENT PLATFORM Fernie, J. and Sparks, L. eds., 2018.Logistics and retail management: emerging issues and new challenges in the retail supply chain. Kogan page publishers. Gürel, E. and Tat, M., 2017. SWOT analysis: a theoretical review.Journal of International Social Research,10(51). Jie, F. and Gengatharen, D., 2019. Australian food retail supply chain analysis.Business Process Management Journal. Liao, L., 2019, May. Perspective on Supply Chain Management for Construction Engineering ManagementRiskPrevention.In1stInternationalConferenceonBusiness,Economics, Management Science (BEMS 2019). Atlantis Press. Malawige,N.N., 2018. Supply ChainManagementon ProjectManagementPerformance: SpecialReferencetoConstructionIndustryofSriLanka.InternationalJournalof Research,5(21), pp.588-595. Parihar, M. and Bharti, A., 2019. Role Of Software Testing Life Cycle (STLC) In Software Development Life Cycle (SDLC).International Journal of Research,6(8), pp.649-661. Park, J. and Lee, S.B., 2018. The Effects of Supply Chain Management on Project Manager's Capability and Sustainable Benefit Sharing in Global Leading Companies.Journal of the Korea Academia-Industrial cooperation Society,19(2), pp.548-560. Phadermrod, B., Crowder, R.M. and Wills, G.B., 2019. Importance-performance analysis based SWOT analysis.International Journal of Information Management,44, pp.194-203.
23SUPPLY CHAIN MANAGEMENT PLATFORM Rao, P.V., Kumar, V.P. and Reddy, B.P.K., 2018. Applying Agile Software Methodology for the Development of Software Development Life Cycle Process (SDLC).Journal for Research| Volume,4(02). Sardana,A.,2016.IDENTIFICATIONOFCRITICALSUCCESSFACTORSFOR IMPLEMENTATIONOFINFORMATIONTECHNOLOGYFORSUPPLYCHAIN MANAGEMENT IN INDIAN AUTOMOBILE INDUSTRY(Doctoral dissertation). Singh, A., Shukla, N. and Mishra, N., 2018. Social media data analytics to improve supply chain management in food industries.Transportation Research Part E: Logistics and Transportation Review,114, pp.398-415. Thorlakson, T., Hainmueller, J. and Lambin, E.F., 2018. Improving environmental practices in agricultural supply chains: The role of company-led standards.Global environmental change,48, pp.32-42. Yuliadi, B. and Nugroho, A., 2019. Integration between management capability and relationship capability to boost supply chain project performance.Int. J. Supply Chain Manag,8(2), pp.241- 252.