This document discusses the implementation of operations management principles, including Six Sigma and Lean methodologies, in relation to Unilever. It also presents a continuous improvement plan based on the review and critique of operations management principles. The effectiveness of the plan is analyzed using appropriate theories and concepts. The document further explores strategies for achieving improved efficiency and justifies the use of these strategies. Overall, it provides insights into operations and project management in the context of Unilever.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Unit 16 – Operations
and Project
Management

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Contents
INTRODUCTION...........................................................................................................................4
MAIN BODY...................................................................................................................................4
TASK 1............................................................................................................................................4
P1 Conduct a critique and review of the implementation of operations management principles.
................................................................................................................................................4
M1 Review and critique the implementation of operations management in relation to Six
Sigma methodology and Lean principles...............................................................................6
TASK 2............................................................................................................................................8
P2 Prepare a continuous improvement plan based on the review and critique of operations
management principles...........................................................................................................8
M2 Analyse the effectiveness of a continuous improvement plan using appropriate theories,
concepts and/or models..........................................................................................................9
D1. Apply appropriate theories, to justify strategies of a continuous improvement plan for
achieving improved efficiency...............................................................................................9
TASK 3..........................................................................................................................................10
P3 Apply each stage of the PLC to a given project, producing necessary supporting
documentation for completing the project............................................................................10
M3 Analyse the rationale for the project methodologies, tools and leadership within the PLC
for the given project..............................................................................................................13
P4 Review and critique the effectiveness of the PLC in application to the chosen project using
appropriate theories, concepts and models...........................................................................13
M4 Critically analyse how the use of appropriate theories, concepts and models in the PLC
will differentiate between large and small-scale projects.....................................................13
D2 Critically evaluate the PLC through a practical and theoretical exploration of its
effectiveness to draw valid conclusions and recommendations for improvement...............14
CONCLUSION..............................................................................................................................15
REFERENCES..............................................................................................................................16
Document Page
Books and Journals...............................................................................................................16
Document Page
INTRODUCTION
Operations management is the process of dealing with day to day manufacturing process of
an organisation and using best strategies to achieve the goals and objectives. Project management
helps in planning organising motivating as well as controlling the resources to achieve the goal
that is set by the organisation (Tetik, Peltokorpi and Holmström, 2019). It is seen that there are
number of issues that come in path while doing a project so with the help of operations and
Project Management and Organisation is able to achieve specific goals within time. For part one
of this report Unilever is taken into consideration that is a famous consumer goods organisation.
There is dispersion related to the major principles of operations management that an organisation
needs to follow for their success. Various theories and concepts are also part of this report that
shows the continuous improvement plan that helps in achieving efficiency. Different stages of
product life cycle are discussed in the report along with that how a company can gain leadership
within the PLC is discussed. In the end of this report there is review of effectiveness of the PLC
with the help of models theories as well as concepts
MAIN BODY
TASK 1
P1 Conduct a critique and review of the implementation of operations management principles.
Unilever
Unilever is a multinational corporation headquartered in London, England. The company
was founded in 1929 and now serves their global activities. Unilever offers a diverse product
portfolio that contains all of the fundamental consumer goods found in every home (Dhamija and
Bag, 2020). It products offered by the organisation are as follows food, cleaning agents, energy
drinks, bottled water, baby food, confections, soft drinks, ice cream, cheese, tea, instant coffee,
pet food, toothpaste. It is also vital to note that the company is largest producer of soap in world.
Along with that the company has its operations in 190 countries.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Business operations Operation management
Business operation includes all the vital
principles that are important for a
manufacturing company to run effectively as
well as to earn reasonable amount of profit. It
includes activities such as material, Finance,
technology and employees. Operations are the
basic function of the organisation and in
relation to Unilever it means manufacturing of
goods that helps the company in achieving
economy of scale (Bjorvatn and Wald, 2018).
It is seen that the employees face lot of
challenges while working. It is also important
to note that Technology has impact on the
productivity as well as performance of an
organisation.
It means the practice of business that helps
them to achieve efficiency and effectiveness in
the operational work. It is the way in which
company is able to change the design,
implement and control the production process
that is done by Unilever and that helps to
satisfy the needs and wants of customer. It is
seen that Unilever is getting advantage of
managing its operations and satisfying
customers.
Document Page
It is vital for an organisation to focus on the principles of operations management as they
help company to developers form strong position and enhance their performance (Smith,
Jitpaiboon and Gu, 2018). The basic principles that are followed by Unilever are as follows:
Reality it is important for management of Unilever to take care and focus on the real problems
that are faced and to point solution of the problem. This helps the organisation to you have a
strong image in market.
Organisation: It is seen that all the activities of a company should be connected with its
production process. It is seen that in Unilever the focus is on the production of organisation and
to attain profit.
Humanity: It is seen that the human beings main make mistakes and have some
limitations that causes problems. In respect to Unilever the company always focuses on
providing proper training to the Employees so that they are able to provide High Quality
Services and make the production process strong.
Success: Each and every company believes in attaining success by satisfying needs and
wants of customers. In relation which Unilever the company measures its success by fulfilling
the demand of its customers with high quality products.
Accountability: It is vital to note that every business is accountable for their work.
Unilever takes here a principle of accountability and always maintains a record of all the work
done by them so that they may show the records whenever required (Bond-Barnard, Fletcher and
Steyn, 2018).
Causality: As per the principle of casualty it is important to remove the casual attitude
from the process of operations management as mistake may decrease the the performance of the
organisation.
Change: As per the principal it is important to regularly change in update the process as
well is technology. It is seen that in relation to Unilever the company always tries to use new and
updated Technology so as to improve their productivity as well as performance. It also helps to
satisfy the needs and wants of customers
Collaborating with customers: The principle focuses on knowing the needs and wants
of customers and manufacturing the product as per their preference. And you never they
regularly take feedback from the customers and modify the product according to their needs.
Document Page
Knowing the competition: It is vital to know that the competition is present at every
level and in every business organisation. Unilever knows about the competition and makes
efforts as well as strategies that help them to gain at over the competitors.
Quality control: It is important to note that the companies should check the quality of
products and services they are providing to their customers. Unilever always take care and
maintain the quality of their products and service and keep it as priority
M1 Review and critique the implementation of operations management in relation to Six Sigma
methodology and Lean principles
Six Sigma is a method that is linked with operations management. It is a principle that
helps to enhance the quality of the process and the focus is to eliminate errors. The principle
focuses on reducing the cost of manufacturing along with that reducing the time taken for the
same (Kakade and Bagga, 2021). It is a process that helps to bring economy of scale. It can be
said that the company games advantage in long run. It is used by Unilever and the company is
able to achieve higher quality products that help to satisfy the needs and wants of customers and
attain huge amount of profits.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Lean manufacturing is another methodology that focuses on minimising waste while
manufacturing and at the same time the focus is on maximizing the productivity by the
organisation (de Nadae, and Carvalho, 2017). It is seen that Unilever is able to reduce the
wastage then it is seen the value of the organisation increases. In regard with Unilever the
company is getting benefit of increasing productivity at the same cost.
Total Quality Management: As per the strategy the focus is on enhancing the involvement
of the customers in the process. That helps to increase the satisfaction level of customers and
attaining success of the company. It helps Unilever to manage quality and provide effective
services to all the customers.
It is seen that the company get benefit of using Six Sigma as well as in manufacturing as
they are the principles that increase the productivity of organisation by minimising the waste. It
is beneficial for organisation to know about the wastage that they are causing and reduce the
wastage as it helps to produce the goods and services in in faster duration of time as well as serve
the customers of the company effectively.
Document Page
TASK 2
P2 Prepare a continuous improvement plan based on the review and critique of operations
management principles
Continuous improvement plan is the process of efforts of management of an organisation
to improve the product service or process. There is on going efforts to enhance the performance
of the company as it helps to privatise the strategic goals and achieve them. It helps to benefit the
organisation as well as attaining profitability (Mihalescu, Gheorghe and Boiangiu, 2017). It is
seen in relation to Unilever that the company uses continuous improvement plan that helps them
to work in an effective and efficient manner and enhance their productivity that helps to increase
the sales and earn more revenues.
Plan: It is the first level of continuous improvement. It is seen that an organisation that
wants improvement should first do a proper planning. By planning the companies able to know
about all the objective along with that the solutions of the problems. In relation to Unilever the
company has conducted proper planning that helps them to regularly improvise the product that
is causing problem to the customers.
Do: It is important to do what the company have planned. All the plans that are
formulated and objective that are set are practically checked and implemented in the market
(Kim and Irizarry, 2019). There is involvement of employees in this stage as they help in
implementation of the plan for betterment of customers.
Document Page
Check: It is next level and the focus is on checking the efficiency of the plan. In Unilever
the company checks the performance of employees and if there are any mistakes then corrective
measures are taken so as to reduce the loss.
Study: Once the solution and change are well-integrated into the organization's strategy
and capable of meeting consumer requests (Asef-Vaziri and Moghaddam, 2021). To bring the
requirement for continuous development, be sure to execute the solution gradually and begin
with the planning process. As a result, Unilever must behave as a dynamic merchandiser in the
market, allowing employees to advance professionally as well.
Objectives of
the plan
Continuous
improvement
technique
Implementation
strategy
Responsibility Resource
allocation
Review
date
To monitor the
needs and wants
of customers
Using the
artificial
intelligence
software.
This will help to
analyse the changing
needs and wants of
customers and
provide them
products according
to their needs.
There is
requirement of
IT Department
& Marketing
department.
IT experts; IT
equipment’s;
software
Monthly
To enhance
their presence
over social
media
Use latest
technology
By working with
effective technology
the organization can
enhance sales and
earn more profits.
Digital
marketing
management &
sales
department
sales
manager, IT
expert that
can manage
work.
2 months
It is a continuous improvement plan that help Unilever to you always research about the
problem that the customer has face and at the same time the process goes on to find solution and
implementation of the solution for benefit of the organisation as well as provide better and
quality product to the customers
M2 Analyse the effectiveness of a continuous improvement plan using appropriate theories,
concepts and/or models
The continuous improvement plan is effective because it allows employees to grow
internally and advance their careers within the business by engaging in problem-solving
activities, applying a creative mind set to solve operational problems, identifying root causes,
and determining whether the remedies make the organisation more effective and inventive.
Rather than sitting and thinking about an issue, the principle assures that a real problem is found

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
in the real business world (Arasteh, 2020). To put it another way, continent improvement will
only be effective if a real problem is identified and a real remedy is devised. The cycle is a
method of improving an organisation that is planned and systematic. Analysing the problem,
determining the best remedy, and implementing or measuring success through improvement are
all successful methods. This cycle is designed to meet the expectations of both the organisation
and the customers.
D1. Apply appropriate theories, to justify strategies of a continuous improvement plan for
achieving improved efficiency
It is important for an organisation to know about the strategies that will help in continuous
development of the organisation. The strategies that are being used by Unilever for the
continuous development is as follows:
Lean and Continuously Improving: The focus is to eliminate the wastage of resources
from the process of manufacturing. As waste reduces value for the customers. The process of
continuous development helps in elimination of problems and improves the process.
Value Stream Mapping: It is one of the efficient strategy that can be used by an
organisation to for improvement (Dominy, O’Connor and Purevgerel, 2018). As focus is to
check the design and process of the company and then adds value to it. It is also called as
brainstorming technique as it is helpful for the organisation and finds various solutions for the
problems faced by the company.
Kaizen: It is one the vital technique that helps to improvise the strategy. They focus is to
bring in lot of small changes and not to make few long changes. The process of improvement
becomes effective and helps in achieving goals and objectives.
TASK 3
P3 Apply each stage of the PLC to a given project, producing necessary supporting
documentation for completing the project.
Product life cycle includes various stages of project development. It is seen that the project
life cycle includes various trade changes that help the organisation to satisfy the needs and wants
of customers. It is important for an organisation to understand the project plan and to follow all
the stages in the development of project so that the company is able to achieve the goals and
objectives effectively (Fettermann, and et.al., 2018). It is effective strategy that helps the
Document Page
organisation to work in all the stages from starting to the closure. This project is based on
Midlands that is a manufacturing organisation in UK. It is seen that the organisation has around
1250 employees. So the project is based on engaging the employees in the organisation during
the lunch hours as if they are leaving the premises then it is causing problem. Along with that the
focus of this project is on enhancing a Healthy lifestyle for the employees so that there is
reduction in employee absenteeism in the organisation. So the various stages that help the
organisation effectively implement the project are discussed below:
Project Initiating: This is the first stage in which the focus is on which will icing the project and
to check what the goals that are to be achieved are. It is the part of project in which the scope is
defined as well as all the stakeholders are identified. All the goals and objectives are studied so
as a Project may be started (Liu and Bai, 2021). All the resources and options for conducting the
research study so as the objective can be finalized are discussed upon this stage. All the
permissions are taken so that each and every member knows about the initiation of the project. In
regard to Midland manufacturing the focus is to analyse base through which the employees can
be engaged in the organisation as well as planning related to the healthy working environment
for employees is also done.
Cost benefit analysis
In a project, cost benefit analysis is critical because the organisation wants to achieve its
objectives with the most possible benefit at the lowest possible cost. Sweet is the finest
instrument for assisting organisations in analysing project costs in light of current circumstances
and determining the benefit.
Project Charter: It is an important part of project management. It includes scope, objectives and
participants involved in the project management.
Document Page
Work breakdown structure
It helps to divide the work in small activities and help in completing the work in time. With the
use of a break down structure, a corporation may break down a large project into smaller
portions and assign duties and obligations to each employee who is a part of the project, allowing
each worker to fulfil their tasks and responsibilities. Because everyone is specialised in their jobs
and responsibilities, it contributes to efficiency.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Gantt chart: It's a tool that displays and records all of the activities that are crucial to the
investigation. It also specifies how long the task should take to complete. The aims are
efficiently achieved by working according to the timetable set.
Project Planning: It is one of the crucial processes of project management. It is said that the
process of planning is at heart of the project life cycle is in this project the stakeholders are given
guidance and steps are told them related to the project. In this step the project plans are
documented as well as all the requirements are clearly defined so as a Project schedule can be
formulated. In this step set of plants is created that helps to implement the project and decide the
closure faces of project also. In relation to Midland manufacturing in this stage there is
discussion related to changes quality cost time risk and all the other issues that might occur at the
time of project. It is important to collect all the resources that are required at the time of planning
and decide the timeframe so as to complete the project on time. In this stage the employees of
Midland manufacturing company set budget as well as collect all the resources that are required.
In this stage all the programs that will help the company to take care of health of the employees
are taken into consideration along with that of planning related to canteen is done so that the
employees eat inside the premises while lunch.
Business Case:
Executive summary The business plan is expected to implement
strategies and goals in a systematic way. This
Document Page
strategy would distribute resources and include
assistance in incorporating resources and
transition into project progress.
Mission To provide plastic bottles and containers in
many parts of country. At the same time they
are planning to keep the employees engaged in
the organisation and provide healthy working
environment. To keep employees in the
organisation during the time of lunch.
Project To start a canteen and engage the employees
with the help of proper planning and execution
of plans.
Resources and funds The company could obtain capital and
investments from a variety of banking
institutions because banks are a less expensive
source of loan approvals, and all of the
company's workers are expected to participate
by working overtime to meet project objectives
(Hill, and et.al., 2020).
Competition Betts Industry, Protego, and other companies
have recently competed with the firm. This
form will provide business opportunities in the
near future, requiring the Midland
manufacturing company to take an earlier
move toward success.
Project execution: It is important in most crucial stage under the process. It is important to
know that all the employees and Organisation is working on the project. It is said that execution
of the project is important as planning. This is tab all the work and the timelines and resources
everything is practically implemented. It is important to note that the stage needs effective
Document Page
communication as well as proper guide is required at this level. Firstly the organisation will
enhance the safety and health standards of the company and will abide them effectively and
efficiently and it will also contribute to CSR. The company is also focusing to start canteen
facility in the organisation where the employees can sit and eat so there will not be any need to
go out for the lunch.
Project closure: It is the last step in the project life cycle it is important to check whether the
aims and objectives are achieved as well as the company is able to work in an effective and
efficient manner. If there is any problem that is still faced by the employees than Midland ceiling
company will take into consideration and resolve the problem before closing the project. After
this stage the company understands the problems as well as tries to identify the strategies that
will help them to work in an effective and efficient manner
M3 Analyse the rationale for the project methodologies, tools and leadership within the PLC for
the given project.
There are a number of useful tools and methods for project performance. Many project
events encountered complexities and effects, resulting in failure and the loss of manpower and
funds. In that case, the project must be completed with clear set guidelines and a clear path so
that the next best superior plan can be developed, saving the project from failure and loss. The
company should do a proper research and identify the best tools and techniques. Of all the
processes are followed and guidelines are taken care than the company is able to manage all the
phases of project effectively. So these are the tools and techniques that are being used by the
Midland manufacturing organisation.
P4 Review and critique the effectiveness of the PLC in application to the chosen project using
appropriate theories, concepts and models
The project life cycle which is used in this project is if factor to be applied in the current project
as it will help the organisation to carry out all the essential task in a proper way (Putniņa, 2018).
In the competitive market it is essential for a project to have a proper planning and execution to
be successful. The project started by metal manufacturing company has its own meaning to
engage Their employees in the canteen open by them in the organisation so that they cannot be is
there so much of time outside the organisation. The organisation also have a motive to take care
of health and safety of their employees and requires to take effective decisions for the same. For
the purpose of this project the organisation can use network based diagram in which in the

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
initiation phase they can make essential decisions to start the project. In the second phase they
will plan that how will they achieve the project for which they have taken effective decisions
about. In the third phase of execution the planet which has been made in street 2 has been
executed with the help of resource, materials and tools required for the project. In the last stage
of the project the project life cycle will take care of the closure of the project and transfer it to the
legal user for or a certain payment to the project manager. The theory which can be used for this
PLC is Agile Approach.
Agile Approach: This approach helps in the project lifecycle to manage the project and promote
discipline so that frequent inspection and adaptation can be made in this project life cycle.
M4 Critically analyse how the use of appropriate theories, concepts and models in the PLC will
differentiate between large and small-scale projects.
Classic technique: Classic technique is used to develop a complete plan for the project and
refers to the whole process which contains a plan for all the activities it needs to be carried out in
the project (Aćimović, Mijušković and Obradović, 2021). Proper plan is required to provide step
by step procedure for a project which will later help in checking of performance and quality of
the work. In case of Midland manufacturing company the company can also use the classical
technique by dividing their work in simple steps for their employees to be completed on a given
time. The task should be assigned on the basis of priorities and its importance for the project.
This technique is is easy to be applied in a project process and provides most suitable results for
the development of project.
Waterfall technique: As the name signifies the waterfall technique depicts the process of work
in a slide move down position to complete the work in smooth manner. According to this
technique the work should be assigned in such a manner that it travels from upper level to the
lower level. The work should be divided in such a manner that depicts its efficiency and proper
management in a waterfall like structure. This technique also proposes to use Gantt chart in order
to break down the work in effective manner which helps the organization to make their work
simple and less Complex and to be completed in proper deadline. As it is essential for the
Midland manufacturing company to construct a canteen in the organization and take care of the
health and safety of the employees the company used this technique to complete the project in
effective manner. The waterfall technique helps the company in in effective and efficient
management of the project and complete it into simple manner (Tamura and Yamada, 2019).
Document Page
D2 Critically evaluate the PLC through a practical and theoretical exploration of its effectiveness
to draw valid conclusions and recommendations for improvement.
It is can be concluded that if the organisation follows all the steps while working on a project
plan. Then it became easier for them to achieve the goals and objectives. It is important to use
the strategy that is right fit for the Midland. It is analysed that classical technique is helpful as
helps in developing the whole plan. At the same time waterfall strategy plays a vital role in
working in smooth manner.
It is recommended that Midland organisation should keep the employees at priority as all
threw work in an organisation is done by the employees. The success of a company is in hands of
the working population. So they should formulate and follow laws related to managing the health
and safety of the employees in the organisation.
CONCLUSION
From the above report it can be analysed that project management is critical for
performance. Operational and project management have an effect on an organization's overall
performance, profitability, and growth, as well as helping to minimise resource waste. The report
is divided down into two sections that are operations and project management. Within an
organisation, there is debate over different values. On the basis of operational management
principles, an improvement plan is stated. In addition, all phases of the product life cycle are
clarified. The PLC's effectiveness is also discussed at the end.
Strength: It helps in knowing all the stages of the project and completing them
effectively. Continuous development plan enhances the position of the organisation.
It helps in communicating all the points effectively and achieving goals and
objectives. All the technical skills are used and in the end business is able to achieve
success.
Weakness: But if proper documentation is not done then the project goals cannot be
accomplished. It can often result in overlapping of authority and accountability
between top management and project management, especially when they have
different ideas in mind, causing uncertainty among project team members and further
project suffering.
Document Page
REFERENCES
Books and Journals
Aćimović, S., Mijušković, V.M. and Obradović, J., 2021. Standardization of Global Logistics
Business Operations. In Eurasian Business Perspectives: Proceedings of the 29th
Eurasia Business and Economics Society Conference (pp. 87-97). Springer International
Publishing.
Arasteh, A., 2020, December. Considering Project Management Activities for Engineering
Design Groups. In SN Operations Research Forum (Vol. 1, No. 4, pp. 1-29). Springer
International Publishing.
Asef-Vaziri, A. and Moghaddam, K.S., 2021. Incorporating the academic performance of
undergraduate students into the teaching material of an operations management
course. International Journal of Teaching and Case Studies, 12(1), pp.17-41.
Bjorvatn, T. and Wald, A., 2018. Project complexity and team-level absorptive capacity as
drivers of project management performance. International Journal of Project
Management, 36(6), pp.876-888.
Bjorvatn, T. and Wald, A., 2018. Project complexity and team-level absorptive capacity as
drivers of project management performance. International Journal of Project
Management, 36(6), pp.876-888.
Bond-Barnard, T.J., Fletcher, L. and Steyn, H., 2018. Linking trust and collaboration in project
teams to project management success. International Journal of Managing Projects in
Business.
de Nadae, J. and de Carvalho, M.M., 2017. A knowledge management perspective of the project
management office. Brazilian Journal of Operations & Production Management, 14(3),
pp.350-362.
Dhamija, P. and Bag, S., 2020. Role of artificial intelligence in operations environment: a review
and bibliometric analysis. The TQM Journal.
Dominy, S.C., O’Connor, L., Parbhakar-Fox, A., Glass, H.J. and Purevgerel, S., 2018.
Geometallurgy—A route to more resilient mine operations. Minerals, 8(12), p.560.
Fettermann, D.C., Cavalcante, C.G.S., Almeida, T.D.D. and Tortorella, G.L., 2018. How does
Industry 4.0 contribute to operations management?. Journal of Industrial and
Production Engineering, 35(4), pp.255-268.
Hill, A., Flagey, N., Barden, S., Erickson, D., Sivanandam, S. and Szeto, K., 2020, December.
Concept of operations versus operations concept: how do you choose?. In Modeling,
Systems Engineering, and Project Management for Astronomy IX (Vol. 11450, p.
114502U). International Society for Optics and Photonics.
Kakade, R.G. and Bagga, P.S., 2021, March. Remote Operations: The New Norm.
In International Petroleum Technology Conference. OnePetro.
Kim, S. and Irizarry, J., 2019. Human performance in UAS operations in construction and
infrastructure environments. Journal of Management in Engineering, 35(6),
p.04019026.
Liu, Z., Li, A., Li, J. and Bai, M., 2021, April. Development of Intelligent Planning & Integrated
Office Management System for Drilling Operations in South Azadagan. In Journal of
Physics: Conference Series (Vol. 1894, No. 1, p. 012037). IOP Publishing.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Mihalescu, G.A., Gheorghe, A.G. and Boiangiu, C.A., 2017. TEACHING SOFTWARE
PROJECT MANAGEMENT: THE COLLABORATIVE VERSUS COMPETITIVE
APPROACH. Journal of Information Systems & Operations Management, 11(1).
Putniņa, L., 2018. Service company operations improvement project.
Smith, S., Jitpaiboon, T., Yang, J. and Gu, Q., 2018. Effects of non-cognitive skills on project
management behaviors: An agency view. Journal of Supply Chain and Operations
Management, 16(3), p.263.
Tamura, Y. and Yamada, S., 2019. Maintenance effort management based on double jump
diffusion model for OSS project. Annals of Operations Research, pp.1-16.
Tetik, M., Peltokorpi, A., Seppänen, O. and Holmström, J., 2019. Direct digital construction:
Technology-based operations management practice for continuous improvement of
construction industry performance. Automation in construction, 107, p.102910.
1 out of 20
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]