Project Management Plan for LC-01A Building Project

   

Added on  2023-03-31

27 Pages4180 Words117 Views
University
Semester
Project Management
Student ID
Student Name
Submission Date
1
Project Management Plan for LC-01A Building Project_1
Table of Contents
1. Project Description........................................................................................................................3
2. Project Parameters.........................................................................................................................3
3. Project Management Methodology................................................................................................4
4. Project management tool...............................................................................................................4
5. Project Management Plan..............................................................................................................4
1) Projects Tasks............................................................................................................................4
2) Project Scheduling Plan.............................................................................................................7
3) Gantt chart.................................................................................................................................9
4) Milestones...............................................................................................................................11
5) Work Breakdown Structure.....................................................................................................12
6) Resources.................................................................................................................................14
7) Critical Tasks...........................................................................................................................15
8) Cost..........................................................................................................................................18
References...........................................................................................................................................20
2
Project Management Plan for LC-01A Building Project_2
1. Project Description
Main objective of this project is to create the project plan for building project because
you have been contracted by client under the AS4915-2002 Project Management – General
Conditions contract as the Project Manager internally appointed by parent organization as a
project manager for a building project. So, we are plan and consequently manage the
construction of LC-01A building project. The project management plan is completed by
using MS project. These are will be discussed and analyzed in detail.
2. Project Parameters
Here, we will outline the project parameters for building project plan. These are listed in
below.
Stakeholders
It is used to specify the type of participation. The LC-01A building project has following
stakeholders:
Resource Name
Concrete contractor
General contractor
Owner
Project Manager
Stakeholder Register
It is project management tool which has data regarding the project stakeholders and it
is used to identifying the involving the stakeholders of the projects. It is presented as below.
Stakeholder
name
Roles and
responsibilities
Influence
level
Contribution
level
Interest level Stakeholder
type
LC-01A
owner
Provide project
concepts
High Moderate High External
Project
manager
Manage project
activities
High High High Internal
Design
architect
Create design
for a building
Moderate High High Internal
Contractor Constructing the Moderate High High Internal
3
Project Management Plan for LC-01A Building Project_3
building
Communication of project information
It is used to specify the communication of the project information and its plan (Chatfield and
Johnson, 2015). It is illustrated as below.
Quality
It is used to specify the project efficiency, capabilities and effectiveness of project results.
The quality is used to measure the project quality and it will be measuring using six sigma
approach known as the DMAIC methodology. It is used to measure the project corrective,
preventive and defect repairing options. It is represented as below.
DMAIC Phase Project Quality Tool Description
Define Analysis of Stakeholders This is used to identify the stakeholder priorities
that are together in the building project.
Communication Plan It is used to developing the project
communication plan.
Client Voice It is used to enhancing the client’s requirements
4
Project Management Plan for LC-01A Building Project_4
and feedbacks.
Supplier-Input-Process-Output-
Customer (SIPOC)
It is used to assisting the project scope and
desires of the customers.
Measure Critical to Quality
It is used to identifying the essential quality
standards that are needed by the client and
delivering them.
Metrics It is used to defining the method of the data
collection and performance measures.
Data Collection Plan It is used to defining what needs to be measured
and where that needs to be recorded.
Analyse Histogram It is used to display the various processes like
variance, means, shape and spread.
Root Cause Analysis
It is used to identify the issues which cause the
problem and analysing the solutions available
for it.
Improve Pilot
It is used to testing the project on a small-scale
sample so that it can be extrapolated and
understood.
Control Control Chart It is used to provide the Understanding of
variations that happens over a period of time.
Lessons Learned
The cumulative knowledge gained from doing
the project which needs to be summarized and
documented for further improvement and use in
future project and studies.
All Phases Project Review
It is used to provide the analysis of the project
process and ensuring project is completed in the
given time.
Change Management It is a System methodology which is used to
apply changes in the project.
Time frames - It is used to specify the project duration. It is presented as project
management plan.
Cost - It is used to specify the determination of cost that a project will most likely consume to
be completed. It is presented as project management plan.
Project resources – It is used to specify the project resources. It is presented as project
management plan.
5
Project Management Plan for LC-01A Building Project_5
3. Project Management Methodology
In this project, we are using the Agile software development methodology which is
used for a project needs the extreme agility in project requirements. The agile development
has following key features such as it is short termed delivery cycles, less restrictive project
control, agile requirements, emphasis and dynamic team culture on real time communications
(Daley, 2014).
4. Project management tool
In this project, we are using the Microsoft project management tool which is one of
best PMBOK tool to create the project management plan for LC – 01 A building project. It is
most popular project management tool which is used to provide the effective project
management plan for building project. It is help managers plan, execute and control all
aspects of the project management process like PMBOK processes.
5. Project Management Plan based on Project Parameters
The project management for LC – 01 A building project is illustrated as below.
1) Projects Tasks
The project tasks are illustrated as below (Harris, 2013).
Task Name
LC-01A Building Project Plan
General Conditions
Finalize plans and develop estimate with owner, architect
Sign contract and notice to proceed
Apply for Permits
Secure foundation permit
Secure framing permit
Secure electrical permit
Secure plumbing permit
Secure HVAC permit
Secure miscellaneous permits
Site Work
6
Project Management Plan for LC-01A Building Project_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Advanced Project Management
|14
|3203
|150

The Learning Communities LC-01A) building will go through
|2
|428
|150

Project Management Plan for Learning Communities (LC01A) Building
|21
|2825
|444

Project Schedule 1.
|3
|446
|88

Project Management Project Management Project Management Project Management Project Management Project Management Project Management Project Management Project Management Project Management Project Ma
|15
|3611
|231

Project Management Application: Construction: Case study of Regency Plaza Project
|16
|3544
|367