Week 4 Topic: Describe how systems engineering concepts and methodologies can help
a project manager organise a project.
Reading samples Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory Readings
SEBoKhttp://
www.sebokwiki.org
•Part 2: Foundations of
Systems Engineering
-'Knowledge Area:
Systems Approach
Applied to Engineered
Systems';
•Part 5: Enabling
Systems Engineering;
–Kerzner (2013)
Chapters 1.21; 2.16-
2.18; 17.18;
–AS/NZS 15288:2015
Chapter 6.1-6.2;
Optional Readings
AS ISO 21504:2016
Project, programme and
portfolio management—
Guidance on portfolio
management;
–Visit the PMI web site
for Portfolio
Management
-http://www.pmi.org/Lea
rning/portfolio-
management.aspx
4. Describe how
systems
engineering
concepts and
methodologies
can help a
project manager
organise a
project
I have learned from the study learning materials of week 4 about
the details of whole system and its application is project and
overall organizational success. Three different types of systems
are there such as situational system, respondent system and
system assets. In order to control the application and other
elements the system engineering concept and methodologies
are very essential. I have learned that in order to identify
potential problems system complexities are required to analyse
first by the organizational project managers. For some cases
understanding opportunities and problems become difficult for
the project associates therefore, system solution may fail to
resolve problems at the initial stage. Though, in order to
enhance the understanding for both issues and solution for next
problems system level solutions are very helpful. I have learned
that, verification and validation are the two different stages
must be followed to execute any project successfully within
assigned budget and timeline. Verification make sure that
whether each of the project elements are meeting the clients
requirements or not. On the other hand, a system will be
identified as a validated one if it meets all the stakeholder’s
requirements and expectation.
I have gained knowledge regarding risks associated to
concurrent engineering. I have come to know that a project will
face major issues due to the following reasons:
Extreme system over lapping
Extreme reworks
Unexpected issues
The above identified issues can collectively result issues of
PPMP
20012Program &
Portfolio Information
Systems Lecture 4
for Week 4
1 of 2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Relevance of Systems Thinking to PM
|4
|1337
|68

The Use of PM Application System for Effective PM Knowledge Management and Decision Making
|2
|564
|97

Identify Different Systems Thinking Tools and Techniques for Project Managers
|2
|544
|41

Assessing Relevance of Systems Engineering to Project Cases
|2
|544
|90

Contemporary Developments in the Use of PM Application Systems
|2
|525
|30

Propose appropriate PM application systems for successful project execution in infrastructure and resource industries
|2
|564
|39