Participant Name:INSERT NAME HERE Module 3 Assessment Task PART A Everyone who has an interest in a work task should be involved in consultation in regards to risk management and determining safe methods for completing the work.As a Work Health and Safety Advisorfor Australia Wide Construction, you will be involved in the risk management process. In particular, you will be involved in completingSafe Work Method Statements,andanalysing their effectiveness. Your assessment task begins on the following page. 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Participant Name:INSERT NAME HERE Scenario 1 NOTE: This incident has occurred in Queensland, so your references to Legislation and Codes of Practice MUST be referenced relevant to Queensland Legislation. This is good practice to refer to interstate legislation as you may at some stage be working for a national company managing WHS and if incidents occur in other states you will need to reference and apply the state legislation the incident occurred in. 1.As the Work Health and Safety Advisor, you are conducting your daily inspections at 12 Maddison Place, Everton Park, Queensland. The work activity being undertaken is working at heights to install solar panels and the workers do not have access to an elevated work platform or scissor lift. You observe unsafe work practices and order the workers down from the roof. 2.You request to view the SWMS from the Supervisor. As you view the SWMS you identify it is incomplete and nobody has signed onto it. You further inspect the site to see if any controls have been implemented. To your surprise there are no controls implemented. You speak to the site supervisor and ask why the SWMS is not completed and controls are not implemented. His response refers to not having enough time as the Foreman has double booked jobs today. 3.You explain to the work team that it is a regulatory requirement to conduct a risk assessment and have a SWMS completed and implemented as per the WHSMS. You advise the supervisor that the SWMS must be completed and controls implemented before the task is commenced. 2
Participant Name:INSERT NAME HERE You take this opportunity to coach the work team on why a SWMS is needed and that the SWMS is to be completed before the task in undertaken.Complete the following Safe Work Method Statement. 3
Participant Name:INSERT NAME HERE SWMS for Scenario 1 Amend where necessary and complete the Job Safety and Analysis for this task. Some sections have been partially completed. WORK LOCATION:12, Maddison Place, Everton Park, QLDACTIVITY:Conduct Work at HeightsDATE: JOB #:SWMS 1.0SWMS WRITTEN BY:WORK SUPERVISOR:Justin Case Instructions: Use this form to REPORT ALL HAZARDS, whether identified during project planning, pre-start checks or immediately when they are observed This form is designed to produce a Safe Work Method Statement that will enable hazards to be managed effectively and ensure the safety of all IMPORTANT! If the Risk Rating after control measures is still ‘Very High’ – STOP – DO NOT attempt the work immediately CONTACT the Management Team for direction If you don’t understand what you are being told, ask and find out. Your life could depend on it! LIKELIHOOD CONSEQUENCE InsignificantMinor First Aid Required Moderate Medical Attention & Time Off Work Severe Long Term Illness or Serious Injury Catastrophic Kill or Cause Permanent Disability or Illness Almost CertainMed – 1AHigh – 2AHigh – 3AVHigh – 4AVHigh – 5A LikelyMed – 1BMed – 2BHigh – 3BHigh – 4BVHigh – 5B PossibleLow – 1CMed – 2CHigh – 3CHigh – 4CVHigh – 5C UnlikelyLow – 1DLow – 2DMed – 3DMed – 4DHigh – 5D RareLow – 1ELow – 2EMed – 3EMed – 4EMed – 5E 1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Participant Name:INSERT NAME HERE Very HighHighMediumLow The proposed task or process activity must not proceed. Steps must be taken to lower the risk level to as low as reasonably practicable using the hierarchy of risk controls. The proposed activity can only proceed, provided that: 1.The risk level has been reduced to as low as reasonably practicable using the hierarchy of risk controls. 2.The risk controls must include those identified in legislation, Australian Standards, Codes of Practice etc. 3.The risk assessment has been reviewed and approved by the Supervisor. 4.A Safe Working Procedure or Safe Work Method has been prepared. 5.The supervisor must review and document the effectiveness of the implemented risk controls. The proposed task or process can proceed, provided that: 1.The risk level has been reduced to as low as reasonably practicable using the hierarchy of risk controls. 2.The risk assessment has been reviewed and approved by the Supervisor. 3.A Safe Working Procedure or Safe Work Method has been prepared. Managed by local documented routine procedures, which must include application of the hierarchy of controls. Job StepsIdentify Hazards Initial Risk Rating Control MeasuresRevised Risk RatingMonitor/Review Access Work PositionWorking at heights without safety gears (Ross 2018) High-3BProvide safety gears to the works in addition to training Med-2BConduct detailed monitoring throughout construction work Set Up Safety SystemEquipment Failure Gravity No Rescue Plan / Equipment or First-aid Poor Housekeeping VH-4AInstallation of safety equipments and first aid camp, develop rescue plan and provide training to the workers (Regan and Fettell 2017) High-3AConduct testing of the safety system before use Conduct Work at heightPossible injuries due to falling down VH-5BUse lanyards for tools Keep tools away from edge and in tool bag Team lifting High-3AMonitor risks and hazards on frequent basis 2
Participant Name:INSERT NAME HERE Isolate power Apply harness and lanyards Check weather reports Apply barricades and danger tape Pack Up/ Clean Up & Finalise Operations Possible hazards from short circuits and open electrical wiring (Tucket al.2019) High-4BInstallation of installations Use safety gears for handling electrical wirings High-3CHire electrical works expert for wiring connections and insulation installation AUTHORISATION(To be reviewed and approved by the Site Supervisor and workers if required) Authorised Name:Signature:Date: Onsite Supervisor Name:Signature:Date: ACCEPTANCE STATEMENT(To be signed by all workers on site) Please Read and Understand This Acceptance Statement: 1.I confirm that the Site Supervisor has explained to me what the hazard control measures are, and the associated safe work method statement/s. 2.I understand this briefing and I have no questions or doubts about any of the safety control measures explained to me. 3.I agree to work with the health and safety of myself and others being of paramount importance and immediately report hazards to the Site Supervisor. Print NameSignatureSign-On TimePrint NameSignatureSign-On Time Site Supervisor or Workers at site to add any relevant additional information: Such as specialist PPE – Inspection of Contractors Machinery Log Books and Licenses – Environmental Impacts – Public Safety – Machinery or Plant Checklist or any others issues REMEMBER:HAZARDS are DANGEROUS to YOU – YOUR FAMILY – YOUR EARNINGS – YOUR LIFE – YOUR MATES – OTHER WORKERS and members of the PUBLIC 3
Participant Name:INSERT NAME HERE When you have completed the SWMS send an email to the Work Health and Safety Committee to report what your workplace inspection revealed and how you have actioned a solution. The email must be sent to theWork Health and Safety Committee. The emailMUSTaddress the following points: I.Explain what you uncovered during your daily inspection. II.Identify the breaches of legislation that occurred (include reference to legislative documents and relevant section/s). III.What you implemented before work was commenced. IV.State recommendations to prevent these non-compliant actions recurring in the workplace and how you will ensure that teams are actively encouraged and supported in decision making processes. V.In your recommendations you must identify legislative requirements for this type of work (if any). VI.Identify at least two barriers you may face with implementing your recommendations and provide strategies on what you can do to overcome them, and how you will hold workers accountable. TO:The Director, Work Health and Safety Committee FROM:PLEASE FILL Subject:Inspection of Working Conditions at 12 Maddison Place, Everton Park, QLD Email Message: Respected Sir, As you must know by now, I was assigned for inspection of the work being undertaken for installation of solar panels on the roof of a property at 12 Maddison Place, Everton Park, Queensland. During my inspection, I discovered that there the SWMS was not completed and was only filled with very few and random details (Dougall 2019). Moreover, the SWMS was not approved or signed by any relevant personnel and the site supervisor did not even care about filling the same. I noticed that the workers did not have sufficient equipments and that they were working under very risky situations. After my inspection was complete, I took the incomplete SWMS form and filled it with relevant information before getting it signed by relevant personnel (Peetz 2018). Identifying the major risks and hazards for the work, I developed some management plans that are listed as follows. Provide safety gears to the works in addition to training Installation of safety equipments and first aid camp, develop rescue plan and provide training 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Participant Name:INSERT NAME HERE to the workers Use lanyards for tools Keep tools away from edge and in tool bag Team lifting Isolate power Apply harness and lanyards Check weather reports Apply barricades and danger tape Installation of installations Use safety gears for handling electrical wirings While developing the management plans and studying the codes of practice and compliance, I also noticed that various codes of practice have been breached including Construction and Operation of Solar Farms Code of Practice 2019, Electrical safety Code of Practice 2010 - Working near Overhead and Underground Electric Lines, Electrical Safety Code of Practice 2010 – Works, First Aid in the Workplace Code of Practice 2014, Hazardous manual tasks Code of Practice 2011 and How to Manage Work Health and Safety Risks Code of Practice 2011 among others (Murray2015). I strongly emphasised that these codes of practice must be fulfilled before allowing further work in the project. However, I also identified that there are certain barriers for the implementation of these management plans: 1)Lack of sufficient training of the workers regarding WHS practice 2)Lack of interest of the site supervisor regarding the implementation of proper WHS practices For overcoming these barriers, I will suggest some training sessions for the workers regarding proper WHS practices. Moreover, I will also suggest providing strict orders for the site supervisor or hiring new site supervisor who will take more care towards following WHS practices in the project. 2
Participant Name:INSERT NAME HERE Research two Registered Training Organisations (RTO) that can assist with training around the topic of ‘working at height’. RTO name: Site Skills Training RTO website: https://www.siteskillstraining.com.au/courses/brisbane/working- at-heights-training Relevant course(s) offered:Confined Spaces and Work at Heights Training, Work at Heights and Elevating Work Platform EWP Training Cost: $499 - $875 Duration: 2 days to 4 days RTO name: OHSA RTO website: https://www.ohsa.com.au/course/work-safely-at- heights/ Relevant course(s) offered: Working at heights training course Cost: $239 Duration: 1 day Now, you need to develop a short plan to report to management. Respond to the following questions: How would you ensure that all staff were able to attend, without significantly impacting productivity? 10 workers require training and each will be given one full day off to attend training. ●Each worker is paid $270.00 per day (total wages) ●The employer is not required to pay transport costs to training. ●The employerwillpay the cost of the course. What is the total cost to the business to train the staff, based on your chosen provider (you must provide a breakdown of how you reached your total cost)? Due to the less price and convenient time, OHSA is recommended for the training program. There are 10 workers selected for training and the training cost for each is $239. Hence, the total training cost will be $2390. Considering additional costs like conveyance, the total cost determined is $2500. 3
Participant Name:INSERT NAME HERE Please Note:Module 3 Assessment Part B is completed as part of Module 4 4