<PROJECT NAME>
PROJECT MANAGEMENT PLAN
Version <1.0>
<31/05/2019>
Team Name
Student Name Student Number Comments
[Insert appropriate disclaimer(s)]
A graphic
representing the
project may be
inserted here

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
<Project Name>
VERSION HISTORY
[Provide information on how the development and distribution of the Project Management Plan
Template was controlled and tracked. Use the table below to provide the version number, the
author implementing the version, the date of the version, the name of the person approving the
version, the date that particular version was approved, and a brief description of the reason for
creating the revised version.]
Version
#
Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
1.0 <Author name> <dd/mm/yy> <name> <dd/mm/yy> <reason>
Template Version: BUSM1278-Sem 1-2018
Page 1 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
Note to the Author
[This document is a template of a Project Management Plan document for a project. The
template includes instructions to the author, boilerplate text, and fields that should be replaced
with the values specific to the project.
Blue italicized text enclosed in square brackets ([text]) provides instructions to the
document author, or describes the intent, assumptions and context for content included in
this document.
Blue italicized text enclosed in angle brackets (<text>) indicates a field that should be
replaced with information specific to a particular project.
Text and tables in black are provided as boilerplate examples of wording and formats
that may be used or modified as appropriate to a specific project. These are offered only
as suggestions to assist in developing project documents; they are not mandatory
formats.
When using this template for your project document, it is recommended that you follow these
steps:
1. Replace all text enclosed in angle brackets (e.g.,, <Project Name>) with the correct field
values. These angle brackets appear in both the body of the document and in headers and
footers. To customise fields in Microsoft Word (which display a gray background when
selected):
a. Select File>Properties>Summary and fill in the Title field with the Document
Name and the Subject field with the Project Name.
b. Select File>Properties>Custom and fill in the Last Modified, Status, and Version
fields with the appropriate information for this document.
c. After you click OK to close the dialog box, update the fields throughout the
document with these values by selecting Edit>Select All (or Ctrl-A) and pressing
F9. Or you can update an individual field by clicking on it and pressing F9. This
must be done separately for Headers and Footers.
2. Modify boilerplate text as appropriate to the specific project.
3. To add any new sections to the document, ensure that the appropriate header and body
text styles are maintained. Styles used for the Section Headings are Heading 1, Heading
2 and Heading 3. Style used for boilerplate text is Body Text.
4. To update the Table of Contents, right-click and select “Update field” and choose the
option- “Update entire table”
5. Before submission of the first draft of this document, delete this “Notes to the Author”
page and all instructions to the author, which appear throughout the document as blue
italicized text enclosed in square brackets.]
Page 2 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
TABLE OF CONTENTS
INTRODUCTION.........................................................................................................................6
1.1 Purpose of Project Management Plan........................................................................6
2 EXECUTIVE SUMMARY OF PROJECT CHARTER.......................................................6
2.1 Assumptions/Constraints............................................................................................6
3 SCOPE MANAGEMENT........................................................................................................7
3.1 Introduction/Purpose/Scope.......................................................................................7
3.2 Other Project Plans.....................................................................................................7
3.3 Scope Management Approach...................................................................................7
3.4 Roles and responsibilities...........................................................................................7
3.5 Project Scope Statement.............................................................................................7
3.6 Work Breakdown Structure (WBS) and Dictionary..................................................7
4 STAKEHOLDER MANAGEMENT......................................................................................8
4.1 Introduction/Purpose/Scope.......................................................................................8
4.2 Stakeholder management approach............................................................................8
4.3 Roles and responsibilities...........................................................................................8
4.4 Reporting....................................................................................................................8
4.5 Stakeholder register....................................................................................................8
4.6 Monitor and control Stakeholders..............................................................................8
5 COMMUNICATIONS MANAGEMENT..............................................................................9
5.1 Introduction/Purpose/Scope.......................................................................................9
5.2 Communication management approach.....................................................................9
5.3 Roles and responsibilities.........................................................................................10
5.4 Key communication mechanisms............................................................................11
5.5 Communication register...........................................................................................11
5.6 Conflict management strategy..................................................................................12
5.7 Monitor and control communications......................................................................13
5.8 Communication Matrix............................................................................................13
6 CHANGE CONTROL MANAGEMENT.............................................................................15
6.1 Introduction/Purpose/Scope.....................................................................................15
6.2 Roles and Responsibilities.......................................................................................15
6.3 Change management process...................................................................................15
6.4 Change control board...............................................................................................15
7 SCHEDULE/TIME MANAGEMENT..................................................................................16
7.1 Introduction/Purpose/Scope.....................................................................................16
Page 3 of 29
[Insert appropriate disclaimer(s)]

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
<Project Name>
7.2 Schedule management approach..............................................................................16
7.3 Roles and responsibilities.........................................................................................16
7.4 Schedule Development Process...............................................................................16
7.5 Project Schedule.......................................................................................................16
7.6 Schedule Closing......................................................................................................16
7.7 Dependencies...........................................................................................................16
8 COST/BUDGET MANAGEMENT......................................................................................17
8.1 Introduction/Purpose/Scope.....................................................................................17
8.2 Roles and responsibilities.........................................................................................17
8.3 Cost management approach/strategy........................................................................17
8.4 Estimated cost..........................................................................................................17
8.5 Cost baseline............................................................................................................17
8.6 Cost monitoring and control.....................................................................................17
8.7 Cost change control..................................................................................................17
8.8 Cost closing..............................................................................................................17
9 PROCUREMENT MANAGEMENT....................................................................................18
9.1 Introduction/Purpose/Scope.....................................................................................18
9.2 Procurement management approach........................................................................18
9.3 Roles and responsibilities.........................................................................................18
9.4 Procurement methodology & strategy.....................................................................18
9.5 Procurement risk management.................................................................................18
9.6 Probity plan..............................................................................................................18
9.7 Vendor/Suppler management plan...........................................................................18
9.8 Asset deposal arrangements.....................................................................................18
9.9 Procurement control/monitor...................................................................................18
10 HUMAN RESOURCE MANAGEMENT.............................................................................19
10.1 Introduction/Purpose/Scope.....................................................................................19
10.2 HR management approach/strategy.........................................................................19
10.3 Roles & Responsibilities..........................................................................................19
10.4 Compliance (government rules, union contracts, other HR policies)......................19
10.5 Staffing management...............................................................................................19
11 QUALITY MANAGEMENT.................................................................................................20
11.1 Introduction/Purpose/Scope.....................................................................................20
11.2 Quality management approach.................................................................................20
11.3 Roles and responsibilities.........................................................................................20
11.4 Interfaces..................................................................................................................20
11.5 Quality management................................................................................................20
Page 4 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
12 RISK MANAGEMENT..........................................................................................................21
12.1 Introduction/Purpose/Scope.....................................................................................21
12.2 Risk management approach.....................................................................................21
12.3 Roles and responsibilities.........................................................................................21
12.4 Risk Log...................................................................................................................21
13 OCCUPATIONAL HEALTH & SAFETY PLAN...............................................................22
13.1 Introduction/Purpose/Scope.....................................................................................22
13.2 OHS policy...............................................................................................................22
13.3 OHS management approach/strategy.......................................................................22
13.4 Roles and responsibilities.........................................................................................22
13.5 Emergency contact details........................................................................................22
13.6 Scope and activity details.........................................................................................22
13.7 Safe work methods statements.................................................................................22
13.8 First aid and injury management..............................................................................22
13.9 Training or induction requirements..........................................................................22
13.10 Safety monitoring and control..................................................................................22
14 ENVIRONMENTAL MANAGEMENT PLAN...................................................................23
14.1 Introduction/Purpose/Scope.....................................................................................23
14.2 EMP policy...............................................................................................................23
14.3 EMP management approach/strategy.......................................................................23
14.4 Roles and responsibilities.........................................................................................23
14.5 Emergency contact details........................................................................................23
14.6 EMP and activity and controls.................................................................................23
14.7 Incident reporting and management.........................................................................23
14.8 Specialised work or licensing...................................................................................23
14.9 EMP monitoring and control....................................................................................23
Page 5 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
INTRODUCTION
1.1 PURPOSE OF PROJECT MANAGEMENT PLAN
[Provide the purpose of the project charter.]
The intended audience of the <Project Name> PMP is all project stakeholders including
the project sponsor, senior leadership and the project team.
2 EXECUTIVE SUMMARY OF PROJECT CHARTER
[Provide an executive summary of the approved project charter. Provide a reference to
the approved Project Charter. Elaborate on any sections within the Project Charter that
need further detail contained within the PMP.]
2.1 ASSUMPTIONS/CONSTRAINTS
[Insert summary of any changes from the project assumptions and/or constraints that were
originally outlined in the project charter.]
Page 6 of 29
[Insert appropriate disclaimer(s)]

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
<Project Name>
3 SCOPE MANAGEMENT
3.1 INTRODUCTION/PURPOSE/SCOPE
3.2 OTHER PROJECT PLANS
3.3 SCOPE MANAGEMENT APPROACH
3.3.1 Scope Statement Development
3.3.2 WBS Structure Development
3.3.3 Scope Control
3.3.4 Acceptance of Deliverables
3.4 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
3.5 PROJECT SCOPE STATEMENT
3.5.1 Product Scope Description
3.5.2 Deliverables
3.5.3 Scope Acceptance Criteria
3.5.4 Scope Exclusions
3.5.5 Constraints
3.5.6 Assumptions
3.6 WORK BREAKDOWN STRUCTURE (WBS) AND DICTIONARY
[Insert the project’s work breakdown structure and dictionary.]
Page 7 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
4 STAKEHOLDER MANAGEMENT
4.1 INTRODUCTION/PURPOSE/SCOPE
4.2 STAKEHOLDER MANAGEMENT APPROACH
4.2.1 Identify & analyse Stakeholders
Evaluation methods & criteria
4.2.2 Stakeholder map
4.2.3 Stakeholder engagement matrix/approach
4.3 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
4.4 REPORTING
4.5 STAKEHOLDER REGISTER
4.5.1 Stakeholder communication requirements
4.6 MONITOR AND CONTROL STAKEHOLDERS
Page 8 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
5 COMMUNICATIONS MANAGEMENT
5.1 INTRODUCTION/PURPOSE/SCOPE
The purpose of this communication management plan is to ensure that the project is on
track. This means that all aspects of planning and the management of the project are
communicated in an effective and appropriate manner to all the stakeholders. in essence,
this section demonstrates how the project details are delivered to all the stakeholders in
terms of frequency and methodology. it provides a benchmark from where the deliverables
of capital metro can be met through the communication process.
5.2 COMMUNICATION MANAGEMENT APPROACH
In line with the corporate communication policies, this part of the document describes the
methodologies used in communicating the project needs to both the internal and external
stakeholders. Moreover, it describes the frequency with which the communication occurs.
5.2.1 Assumptions
The communication strategies that will be employed throughout the project will be
discussed during the project briefing which is scheduled on September 2014.
Each of the communication requirements including the time and effort have been
approved in the planning stage.
The communication strategies employed are all in line with the requirements of the
internal stakeholders.
Only the external stakeholders recognized in the business case will be involved in the day
to day management of the project.
Depending on the nature of the external stakeholder, the communication strategies
employed may vary.
Page 9 of 29
[Insert appropriate disclaimer(s)]

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
<Project Name>
The communication strategies that have been employed are in line with the
communication requirements of each of the external stakeholders.
Frequency of communication depends on the urgency of the project and any alternations
that have been brought about by the capital Metro cabinet subcommittee.
5.2.2 Constraints
One of the major drawbacks may be the inability to process all the data received in
a timely manner leading to scope creep.
The timelines and communication dates indicated may vary according to the risks.
In essence, there is a limitation to understanding how the risks may affect the
frequency of communication as well as the methodologies used.
5.2.3 Success criteria
Information is delivered to the internal and external stakeholders in a timely
manner, all in line with the project needs.
The response from each of the parties involved addresses the needs of the project.
There is no need to revise the communication methodologies employed.
There is no need to revise the frequency of communication.
5.3 ROLES AND RESPONSIBILITIES
Group Role
Capital metro cabinet subcommittee Management of the project progress as per the
information received from the various
stakeholders.
The project board
Manage project information and make
important project decisions which do not
require elevation to the cabinet subcommittee.
Shared Service procurement Matters on advisor engagement.
Page 10 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
Advice on procurement.
ACT government procurement Board Determine the interaction point between the
board and the project
Project management team(project director,
Executive director dealing with finance and
economics, and the executive director dealing
with governance and operations)
Ensuring project compliance to the project
board’s directives. This entails daily
management of project activities.
Project director Ensuring the project meets the
objectives of the Act government.
The management of Capital Metro
agency
Ensuring compliance by Capital Metro
agency to the rules and regulations.
Managing capital metro agency.
National Capital Authority Ensuring the project is in line with the needs of
the community and all the stakeholders
5.4 KEY COMMUNICATION MECHANISMS
Situational communication
Resonance communication
5.5 COMMUNICATION REGISTER
status of the
communicati
on event
event details date of
communicati
on
name of
approver
feedback of
the
communicati
on
open Industry
briefing
September
2014
Capital
metro
cabinet
subcommitt
ee
Types of
communicatio
n channels to
be used and
the project
nature
open EOI process Q4 2014-Q1
2015
Capital
metro
cabinet
subcommitt
ee
Beginning of
the
procurement
process
Page 11 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
open RFP process q2 2015-q4
2015
capital
metro
cabinet
subcommitt
ee
RFP
evaluations
open Contract
negotiations
q1-q2 2016 capital
metro
cabinet
subcommitt
ee
The design
process
open Contract
commenceme
nt
h1 2016 capital
metro
cabinet
subcommitt
ee
contract close
open Pperations
commence
2019 capital
metro
cabinet
subcommitt
ee
financial close
open consultations daily for 6
weeks
project
board
project details
5.6 CONFLICT MANAGEMENT STRATEGY
The use of private discussions which address the specific issue. a private
environment provides security
By using the most appropriate communication channel. the channel should be
suitable for each of the conflicting parties
Open communication in order to ensure that everyone is engaged.
Listening techniques are of importance to each conflicting party.
Involving an arbitrator in the discussion.
follow ups by using various communication channels such as email
Page 12 of 29
[Insert appropriate disclaimer(s)]

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
<Project Name>
5.7 MONITOR AND CONTROL COMMUNICATIONS
The process of controlling and monitoring communication is of the essence throughout the
project life cycle. In line with this, monitoring the communication channel entails
determining the:
Competence of communication channels
The feedback process and the efficiency
The nonverbal nature of the channels
The presentation
Therefore:
Meetings should be scheduled on the basis of an agenda
Every attendee should be aware of the agenda.
Team members need to understand their roles
Continuous engagement after meetings should be facilitated.
5.8 COMMUNICATION MATRIX
Stakeholder Messages Vehicle
s
Frequency Communicator
s
Feedback
Mechanism
s
Capital
metro
cabinet
subcommitte
e
High level
approval of
project
change in
direction
7 Less
frequent
Simon Corbell Multifaceted
open and
inclusive
consultation
s
Project board Project
progress
and change
in the
direction of
7 More
frequent
Project director Multifaceted
open and
inclusive
consultation
s
Page 13 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
the project.
Project
director
Directing
the project
progress as
dictated by
the project
team
1 Daily Director general
capital metro
Agency
Multifaceted
open and
inclusive
consultation
s
ACT
government
procurement
board
How the
project
interacts
with the
board and
approval of
the
procuremen
t plans
7 Rare and
only in
procuremen
t instances
Executive
director
procurement
and delivery
Multifaceted
open and
inclusive
consultation
s
Project
management
team
Information
regarding
the daily
progress of
the project
5 daily Project director Multifaceted
open and
inclusive
consultation
s
Page 14 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
6 CHANGE CONTROL MANAGEMENT
6.1 INTRODUCTION/PURPOSE/SCOPE
6.2 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
6.3 CHANGE MANAGEMENT PROCESS
6.3.1 Change request process flow requirements
6.3.2 Change request form and change management log
6.3.3 Evaluating and authorising change requests
6.4 CHANGE CONTROL BOARD
Page 15 of 29
[Insert appropriate disclaimer(s)]

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
<Project Name>
7 SCHEDULE/TIME MANAGEMENT
7.1 INTRODUCTION/PURPOSE/SCOPE
7.2 SCHEDULE MANAGEMENT APPROACH
7.3 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
7.4 SCHEDULE DEVELOPMENT PROCESS
7.4.1 WBS, numbering methodology, dictionary
7.5 PROJECT SCHEDULE
[Insert the project’s schedule or include in appendix.]
7.5.1 Schedule Management & Control
7.5.2 Schedule Status Reporting
7.5.3 Milestones
The table below lists the milestones for this project, along with their estimated completion
timeframe.
Milestones Estimated Completion Timeframe
[Insert milestone information (e.g., Project
planned and authorised to proceed)]
[Insert completion timeframe (e.g.,
Two weeks after project concept is
approved)]
[Add additional rows as necessary]
7.6 SCHEDULE CLOSING
7.6.1 Closing reports
7.6.2 Archive schedule data and tools
7.7 DEPENDENCIES
[Insert the schedule/project dependencies (both internal and external).]
Page 16 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
8 COST/BUDGET MANAGEMENT
8.1 INTRODUCTION/PURPOSE/SCOPE
8.2 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
8.3 COST MANAGEMENT APPROACH/STRATEGY
8.4 ESTIMATED COST
8.5 COST BASELINE
Cash flow
Contingency/Specific exclusion
Reporting
8.6 COST MONITORING AND CONTROL
8.7 COST CHANGE CONTROL
8.8 COST CLOSING
Page 17 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
9 PROCUREMENT MANAGEMENT
9.1 INTRODUCTION/PURPOSE/SCOPE
9.2 PROCUREMENT MANAGEMENT APPROACH
9.3 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
9.4 PROCUREMENT METHODOLOGY & STRATEGY
Contract types
Evaluation process
Procurement constraints
Contract approval process
9.5 PROCUREMENT RISK MANAGEMENT
9.6 PROBITY PLAN
9.7 VENDOR/SUPPLER MANAGEMENT PLAN
Contract performance management
9.8 ASSET DEPOSAL ARRANGEMENTS
9.9 PROCUREMENT CONTROL/MONITOR
Page 18 of 29
[Insert appropriate disclaimer(s)]

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
<Project Name>
10 HUMAN RESOURCE MANAGEMENT
10.1 INTRODUCTION/PURPOSE/SCOPE
10.2 HR MANAGEMENT APPROACH/STRATEGY
10.3 ROLES & RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
10.3.1 Project organisational structure
10.4 COMPLIANCE (GOVERNMENT RULES, UNION CONTRACTS, OTHER HR
POLICIES)
10.5 STAFFING MANAGEMENT
Competency (skill and capacity required)
Staff acquisition
Resource calendars
Team development plan/Training needs
Staff release plan
Performance review
Recognition and rewards
Page 19 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
11 QUALITY MANAGEMENT
11.1 INTRODUCTION/PURPOSE/SCOPE
11.2 QUALITY MANAGEMENT APPROACH
11.3 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
11.4 INTERFACES
11.5 QUALITY MANAGEMENT
11.5.1 Quality planning
Define project quality
Measure project quality
11.5.2 Quality assurance
Analyse project quality
Improve project quality
11.5.3 Quality control/monitor
11.5.4 Quality tools/methods
Page 20 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
12 RISK MANAGEMENT
12.1 INTRODUCTION/PURPOSE/SCOPE
12.2 RISK MANAGEMENT APPROACH
Risk process
Risk rating methodology
Risk identification
Risk Analysis and evaluation
Risk response planning
Risk monitoring and control
12.3 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
12.4 RISK LOG
[The Risk Log is normally maintained as a separate document. Provide a sample of the
risk log]
Page 21 of 29
[Insert appropriate disclaimer(s)]

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
<Project Name>
13 OCCUPATIONAL HEALTH & SAFETY PLAN
[The OH&S plan is optional]
13.1 INTRODUCTION/PURPOSE/SCOPE
13.2 OHS POLICY
13.3 OHS MANAGEMENT APPROACH/STRATEGY
13.4 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
13.5 EMERGENCY CONTACT DETAILS
13.6 SCOPE AND ACTIVITY DETAILS
13.7 SAFE WORK METHODS STATEMENTS
13.8 FIRST AID AND INJURY MANAGEMENT
Incident reporting and management
Specialised work or licensing
13.9 TRAINING OR INDUCTION REQUIREMENTS
13.10 SAFETY MONITORING AND CONTROL
Page 22 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
14 ENVIRONMENTAL MANAGEMENT PLAN
[The EM plan is optional]
14.1 INTRODUCTION/PURPOSE/SCOPE
14.2 EMP POLICY
14.3 EMP MANAGEMENT APPROACH/STRATEGY
14.4 ROLES AND RESPONSIBILITIES
[Insert a table detailing the project team members roles and responsibilities]
14.5 EMERGENCY CONTACT DETAILS
14.6 EMP AND ACTIVITY AND CONTROLS
14.7 INCIDENT REPORTING AND MANAGEMENT
14.8 SPECIALISED WORK OR LICENSING
14.9 EMP MONITORING AND CONTROL
Page 23 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
Appendix A: Project Management Plan Approval
The undersigned acknowledge they have reviewed the <Project Name> Project
Management Plan and agree with the approach it presents. Changes to this Project
Management Plan will be coordinated with and approved by the undersigned or their
designated representatives.
[List the individuals whose signatures are desired. Examples of such individuals are
Business Steward, Project Manager or Project Sponsor. Add additional lines for signature
as necessary. Although signatures are desired, they are not always required to move
forward with the practices outlined within this document.]
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Page 24 of 29
[Insert appropriate disclaimer(s)]

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
<Project Name>
APPENDIX B: REFERENCES
[Insert the name, version number, description, and physical location of any documents
referenced in this document. Add rows to the table as necessary.]
The following table summarises the documents referenced in this document.
Document Name
and Version
Description Location
<Document
Name and
Version Number>
[Provide description of the
document]
<URL or Network path where
document is located>
Page 25 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
APPENDIX C: KEY TERMS
[Insert terms and definitions used in this document. Add rows to the table as
necessary. Follow the link below to for definitions of project management terms
and acronyms used in this and other documents.
The following table provides definitions for terms relevant to this document.
Term Definition
[Insert Term] [Provide definition of the term used in this document.]
[Insert Term] [Provide definition of the term used in this document.]
[Insert Term] [Provide definition of the term used in this document.]
Page 26 of 29
[Insert appropriate disclaimer(s)]
Document Page
<Project Name>
APPENDIX D: SUMMARY OF SPENDING
[The following table is provided as a model. You may either use this table or replace it
with another table that you believe will be suitable.]
PY: Previous Year; CY: Current Year; BY: Budget Year
Page 27 of 29
[Insert appropriate disclaimer(s)]