The report discusses the need for an ERP system to replace manual recording system of ABC pvt. Limited. It describes the limitations of manual record keeping and the benefits of ERP system. The report also provides the steps of implementing the ERP system, project breakdown structure, and precaution measurements. The system design part consists of the requirements and constraints of implementation and assumptions made. The project will not need major revision but some modifications like cost of implementation should be mentioned and the impact of ERP on the employees of the company should be mentioned along with the potential human job reduction.