logo

Training and Apprentices Program for High School Students (TAHS) - Project Details and Team Charter

   

Added on  2023-04-21

9 Pages1329 Words126 Views
Assignment-2
Coversheet: Please provide the member’s details, student ID, student Name and the
Lecturer Name

Part 1
1.1 Project name: Training and Apprentices Program for High School Students
(TAHS)
1.2 Team details: The details of the project team that is formed in order to manage
the project TAHS project is represented in the table below-
First Name Last Name Mobile Email
Please Insert Please Insert Please Insert Please Insert
Please Insert Please Insert Please Insert Please Insert
Please Insert Please Insert Please Insert Please Insert
Please Insert Please Insert Please Insert Please Insert
Table 1: Representing the details of the project Team
1.3 Project description: Globex Corporation aims in helping the farmers to increase
their productivity by decreasing the required time and cost. The Corporation is now
working on implementation of a training program that is directed towards the high
school student. This program is intended to help the high school students in getting
useful work experience by providing training related to management of agricultural
business. A long standing client of Globex that is Virtucon is provided with the
responsibility of developing a computer based system for managing and storing the
details of the High school students that will be collected for the training Project.
1.4 Team charter
A team charter is prepared in order to identify the skills and knowledge of the
project team members.
Skills & knowledge
inventory
Member 1: Please
Insert the name of the
member
The member of the
project is skilled with
good communication
skill and positive
attitude. This member
has knowledge about
the different project
management methods
with which a project
can be implemented.
Member 2: Please
Insert the name of the
member
This member has
knowledge about the
techniques required for
project scheduling and
is skilled in making use
of different scheduling
tools of project
management.

Member3: Please Insert
the name of the
member
The member has
appropriate technical
skills and has
knowledge about
different programming
languages.
Member4: Please Insert
the name of the
member
This member is skilled
with effective problem
solving capability and
has knowledge about
team management.
Roles and
Responsibilities
Member 1 This member is
assigned with the role
of Project Manager and
has the responsibility
of managing the TAHS
project.
Member 2 This member is
assigned with the role
of project supervisor
and has the
responsibility of
ensuring that the TAHS
project is implemented
as per the
specifications
Member 3 The member is
responsible for
ensuring that the
technical specification
of the computer based
system is followed in
project execution. Thus
the member is
assigned with the role
of technical expert in
the project
Member 4 This member is
responsible for
ensuring that the
project is being
implemented as per
the specifications
provided by Globex
and is assigned with
the role of managing
project evaluation
Team communications Week-5 Time and Location: At
University Campus at

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Training and Apprenticeship program for High School students (TAHS)
|11
|2639
|470

Training and Apprenticeship program for High School students (TAHS)
|12
|2690
|196

Training and Apprenticeship program for High School students
|9
|1179
|477

Computer-Based Training Programme and System for TAHS
|10
|2144
|462

Mobile Based Farmer Support Application (MBFSA) Project
|10
|2253
|50

Mobile Based Farmer Support Application (MBFSA) Project
|9
|1316
|49