This assignment explores the critical aspects of project planning and management, emphasizing the importance of proper planning and review before implementing any project. It discusses different steps involved in successful project completion, various types of required resources, the significant role of a project manager, timely activity completion to avoid cost and time overruns, and the necessity of monitoring and controlling projects to mitigate risks.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Managing Projects
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
INTRODUCTION...........................................................................................................................2
TASK 1............................................................................................................................................2
1.) Types of project.................................................................................................................2
2.) Scope management............................................................................................................2
3.) Difference among Gantt chart and critical path................................................................2
4.) Way to measure the success of the project........................................................................3
5.) Managing a change within a project.................................................................................3
6.) Evaluating, monitoring and controlling the project..........................................................3
TASK 2............................................................................................................................................3
Background.............................................................................................................................3
Structure of the project...........................................................................................................4
CONCLUSION..............................................................................................................................15
REFERENCES..............................................................................................................................17
1
INTRODUCTION...........................................................................................................................2
TASK 1............................................................................................................................................2
1.) Types of project.................................................................................................................2
2.) Scope management............................................................................................................2
3.) Difference among Gantt chart and critical path................................................................2
4.) Way to measure the success of the project........................................................................3
5.) Managing a change within a project.................................................................................3
6.) Evaluating, monitoring and controlling the project..........................................................3
TASK 2............................................................................................................................................3
Background.............................................................................................................................3
Structure of the project...........................................................................................................4
CONCLUSION..............................................................................................................................15
REFERENCES..............................................................................................................................17
1
INTRODUCTION
Managing project is the procedure of initialising, controlling and exctuing by the team in
respect to accomplish the goals and objective in a given period of time. Further it is one of the
effective way of managing the project and remove all the risk which are involved in it. The
present report is based on the given scenario of TSK bearing Ltd which deals in designing and
manufacturing of industrial bearing for automotive industry. This report will cover a new project
which is introduced by an organisation for gaining success. Along with this, different types of
activities which is required to manage and successfully implementing this project will be
discussed.
TASK 1
1.) Types of project
TSK bearing company is focusing on manufacturing project with the aim of developing a
new technology that can be fit in the cars for making it more innovative. Further this will be
supply to suppliers into different global car manufacturing plants. The reason behind developing
new technology is that it helps in gaining competitive advantage. Further this type of project will
be completed in the factory or home-based environment. The other types of projects are known
as the managing project. It is essential to manage the project so that it can accomplished
successfully.
2.) Scope management
In scope management a set of process is being defined and mapped accordingly. It is an effective
technique in order to accomplish the project and make sure that project manager allocate
resources successfully (Addis, 2012).. In this project, TSK bearing limited is focusing on
launching a new technology that is Mild Hybrid which will help in gaining competitive
advantage. For this project allocated budget is $ 12 million pound and it will be completed
within a year 2018. Further for implementing it successfully manager will provide training and
development facilities to employees.
3.) Difference among Gantt chart and critical path
For a project management Gantt chart is a tool that can be used for schedule the time of each and
every activity. Further it shows the visual representation of the tome which is consume in each
activity and impact on delay (Griffith, Stephenson and Watson, 2014).. On the other side, in
critical path the dependencies show between the given task. Along with the logical relationship
2
Managing project is the procedure of initialising, controlling and exctuing by the team in
respect to accomplish the goals and objective in a given period of time. Further it is one of the
effective way of managing the project and remove all the risk which are involved in it. The
present report is based on the given scenario of TSK bearing Ltd which deals in designing and
manufacturing of industrial bearing for automotive industry. This report will cover a new project
which is introduced by an organisation for gaining success. Along with this, different types of
activities which is required to manage and successfully implementing this project will be
discussed.
TASK 1
1.) Types of project
TSK bearing company is focusing on manufacturing project with the aim of developing a
new technology that can be fit in the cars for making it more innovative. Further this will be
supply to suppliers into different global car manufacturing plants. The reason behind developing
new technology is that it helps in gaining competitive advantage. Further this type of project will
be completed in the factory or home-based environment. The other types of projects are known
as the managing project. It is essential to manage the project so that it can accomplished
successfully.
2.) Scope management
In scope management a set of process is being defined and mapped accordingly. It is an effective
technique in order to accomplish the project and make sure that project manager allocate
resources successfully (Addis, 2012).. In this project, TSK bearing limited is focusing on
launching a new technology that is Mild Hybrid which will help in gaining competitive
advantage. For this project allocated budget is $ 12 million pound and it will be completed
within a year 2018. Further for implementing it successfully manager will provide training and
development facilities to employees.
3.) Difference among Gantt chart and critical path
For a project management Gantt chart is a tool that can be used for schedule the time of each and
every activity. Further it shows the visual representation of the tome which is consume in each
activity and impact on delay (Griffith, Stephenson and Watson, 2014).. On the other side, in
critical path the dependencies show between the given task. Along with the logical relationship
2
between the project so that with its starting and finished date. With the use of Gantt chart it
become easy to monitor the progress of the project and complete on time. It made easier for the
project manager to see its needs and work accordingly. Further Gantt chart comes under the
category of bar chart and critical path come under the flow category.
4.) Way to measure the success of the project
It is important for the company to measure success of the project and it can be done through
review the quality and completion of each and every activity (Walker, 2015).. If the project
quality is good then it will be considered as a effective. Further the project management is on
higher probity and it cost is $ 12 million pounds. Along with this to measure the success the
project, stakeholder satisfaction level can be recognised.
5.) Managing a change within a project
It is also essential to manage the project on time. For this purpose, first objective need to
set and defined in front of project team member. Further different strategies will be made so that
it can be accomplished on time. For monitoring the progress control process can be installed and
implement in all the stages. Along with this change management process can be used for
bringing the changes within the plan.
6.) Evaluating, monitoring and controlling the project
For the progress and impact of the project it is important to made judgement and evaluate
the project. Further project is need to monitored continuously so that changes can be made if
required. Through tracking the process of implementation, it become easy to analyse the
mistake and steps taken to remove it. There are various method which can be used for
evaluating the project that is status of the project or first hand information or project profile.
Apart from this it is important to monitor each and every activity time and control
unnecessary wastage of time consuming process.
TASK 2
Background
In modern era, there are many new technologies are introduced in the market and it made tough
for the company to survive in competitive market. To meet the needs and demand of the
customer has become tough and great challenge for the firm (De Bruijn and Ten Heuvelhof,
2010).. Therefore, to accomplish success organisation need to implement new technologies and
make innovative products and services for their customers so that they can easily grab attention
3
become easy to monitor the progress of the project and complete on time. It made easier for the
project manager to see its needs and work accordingly. Further Gantt chart comes under the
category of bar chart and critical path come under the flow category.
4.) Way to measure the success of the project
It is important for the company to measure success of the project and it can be done through
review the quality and completion of each and every activity (Walker, 2015).. If the project
quality is good then it will be considered as a effective. Further the project management is on
higher probity and it cost is $ 12 million pounds. Along with this to measure the success the
project, stakeholder satisfaction level can be recognised.
5.) Managing a change within a project
It is also essential to manage the project on time. For this purpose, first objective need to
set and defined in front of project team member. Further different strategies will be made so that
it can be accomplished on time. For monitoring the progress control process can be installed and
implement in all the stages. Along with this change management process can be used for
bringing the changes within the plan.
6.) Evaluating, monitoring and controlling the project
For the progress and impact of the project it is important to made judgement and evaluate
the project. Further project is need to monitored continuously so that changes can be made if
required. Through tracking the process of implementation, it become easy to analyse the
mistake and steps taken to remove it. There are various method which can be used for
evaluating the project that is status of the project or first hand information or project profile.
Apart from this it is important to monitor each and every activity time and control
unnecessary wastage of time consuming process.
TASK 2
Background
In modern era, there are many new technologies are introduced in the market and it made tough
for the company to survive in competitive market. To meet the needs and demand of the
customer has become tough and great challenge for the firm (De Bruijn and Ten Heuvelhof,
2010).. Therefore, to accomplish success organisation need to implement new technologies and
make innovative products and services for their customers so that they can easily grab attention
3
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
of large number of customer. For this purpose, attention need to be paid by the firm on the
practice the way of managing project successfully. To survive in market different car
manufacturing companies are introducing advance technologies. All the issues companies are
facing because of the globalisation and huge competition. Therefore, for gaining competitive
advantage and expand the business TSK bearing lt. is focusing on introducing new technology
that is a mild hybrid system within the car as it makes the use of electronic motor. It will made
easier for the firm to survive in the UK market and increase sales and profitability.
Aim: The main aim of TSK bearing Ltd is that it can introduce a mild hybrid technology within the
cars for survive in global market.
Objectives: The main objectives related to the aim of TSK beaning are as follows
 To gain competitive advantage and give tough competition to firms in global market
 To implement Mild Hybrid technology within the cars.
 To accomplish project in fixed budget that is $12 million pounds
 To increase sales upto 12% within the 7 months
 To enhance customer satisfaction level and retain them
 To complete the project within a 6 month
Structure of the project
Figure 1Project based organization structure
(Source: Types of project management structure, 2011)
4
practice the way of managing project successfully. To survive in market different car
manufacturing companies are introducing advance technologies. All the issues companies are
facing because of the globalisation and huge competition. Therefore, for gaining competitive
advantage and expand the business TSK bearing lt. is focusing on introducing new technology
that is a mild hybrid system within the car as it makes the use of electronic motor. It will made
easier for the firm to survive in the UK market and increase sales and profitability.
Aim: The main aim of TSK bearing Ltd is that it can introduce a mild hybrid technology within the
cars for survive in global market.
Objectives: The main objectives related to the aim of TSK beaning are as follows
 To gain competitive advantage and give tough competition to firms in global market
 To implement Mild Hybrid technology within the cars.
 To accomplish project in fixed budget that is $12 million pounds
 To increase sales upto 12% within the 7 months
 To enhance customer satisfaction level and retain them
 To complete the project within a 6 month
Structure of the project
Figure 1Project based organization structure
(Source: Types of project management structure, 2011)
4
Project manager: Project manager need to delegate the roles and responsibilities to employees
on time. Further it control all the resources which are used for the project (Hallowell and Wehle,
2013)..
Steering committee: There role is to make decision related to work and then and overall sight of
the project is in their in charge and they also represent al the significant are of the participation.
Executive committee: Entire executive committee was presented in front of the firm and board of
directors are included in this activity.
Scope: A new technology which is implementing by TSK bearing limited is known Mild Hybrid
car which make use of the electronic motor. In this all the work is done with the help of
machinery and this electronic motor work as power booster. Along with this, with the use of this
technology a fuel can be saved as because engine of gasoline will be shut down when vehicle is
stop or break down (Dykstra, 2011).. It will be efficient enough that is assist in restarting the gas
engine motor. Therefore, the main aim is to develop this project within the $12 million pounds
and introduced it in market within a year 2018. The budget of factory or building where this
technology will be developed is included in $12 million pounds. Apart from this to increase the
sales pre-order booking will be started when project is at last stage so that target can be
accomplished on time.
Resources: There are different types of resources which is required in this project so that it can
be accomplish successfully. However, it is important for project manager to ensure that all the
resources acquired on time and in less cost. Here below are proved some of the essential
resources:
Material good: For introducing new technology that is Mild hybrid it is essential to have
software licence. Along with this hardware is also needed such as cabling etc.
Capital: It is important to purchase factor or building where entire project work can be carried
out.
People: Human resources is one of the important resources as highly skill employees are needed
for this project and project training and guidance need to give them (Nicholas and Steyn, 2017)..
Staff planning:
There are some roles and responsibilities of the staff member and project manager which are as
follows:
5
on time. Further it control all the resources which are used for the project (Hallowell and Wehle,
2013)..
Steering committee: There role is to make decision related to work and then and overall sight of
the project is in their in charge and they also represent al the significant are of the participation.
Executive committee: Entire executive committee was presented in front of the firm and board of
directors are included in this activity.
Scope: A new technology which is implementing by TSK bearing limited is known Mild Hybrid
car which make use of the electronic motor. In this all the work is done with the help of
machinery and this electronic motor work as power booster. Along with this, with the use of this
technology a fuel can be saved as because engine of gasoline will be shut down when vehicle is
stop or break down (Dykstra, 2011).. It will be efficient enough that is assist in restarting the gas
engine motor. Therefore, the main aim is to develop this project within the $12 million pounds
and introduced it in market within a year 2018. The budget of factory or building where this
technology will be developed is included in $12 million pounds. Apart from this to increase the
sales pre-order booking will be started when project is at last stage so that target can be
accomplished on time.
Resources: There are different types of resources which is required in this project so that it can
be accomplish successfully. However, it is important for project manager to ensure that all the
resources acquired on time and in less cost. Here below are proved some of the essential
resources:
Material good: For introducing new technology that is Mild hybrid it is essential to have
software licence. Along with this hardware is also needed such as cabling etc.
Capital: It is important to purchase factor or building where entire project work can be carried
out.
People: Human resources is one of the important resources as highly skill employees are needed
for this project and project training and guidance need to give them (Nicholas and Steyn, 2017)..
Staff planning:
There are some roles and responsibilities of the staff member and project manager which are as
follows:
5
Project manager: Role of project manager is to manage the entire team and coordinate each and
every activity effectively. Along with this it also need to measure the risk of the project and try
to minimise it so that each and every activity can be carry out on time without risk (Ilozor and
Kelly, 2012).. One of the main role of project manager is to resolve the conflict which can take
place between the team members.
Project team member: The role of team member work under the guidance of project manager
and they need to complete each and every activity within the given period of time(Lientz, 2012).
.
Financial team: Role of financial team to ensure that all the fund is allocated on time and no
unnecessary expenses take place.
Quality team: in order meet the quality and quality guideline can be developed and followed it
effectively.
Technician: The project is to developed new technology that is mild hybrid car for this purpose
proper coordination between technician and team member is required. Along with this, changes
is need to made if required by technician (Kubba, 2010)..
Project life cycle
For introducing a new technology that is Hybrid it is important for the firm to follow a proper
steps so that it can be implemented successfully without missing any important activity. There
are some steps in the project life cycle which are as follows:
Initiation:
The first step if start the project so for initialising the plan TSK bearing ltd. Required to develop
a project charter as in it all the activities and resources are mentioned which are required for the
project(Lientz, 2012).. Along with this time and deadline of each activities are need to included
in it. Further all the employees and staff members who are involved in this project are mentioned
with the goal and objective of the project
Planning: In second step proper planning is need to be done and management plan is created.
Further scope and risk related to the project which will bring in future is discussed. So that plan
can be made for resolving any future or present risk. Cost of each activities and from where
information will be gathered is also included in this stage.
6
every activity effectively. Along with this it also need to measure the risk of the project and try
to minimise it so that each and every activity can be carry out on time without risk (Ilozor and
Kelly, 2012).. One of the main role of project manager is to resolve the conflict which can take
place between the team members.
Project team member: The role of team member work under the guidance of project manager
and they need to complete each and every activity within the given period of time(Lientz, 2012).
.
Financial team: Role of financial team to ensure that all the fund is allocated on time and no
unnecessary expenses take place.
Quality team: in order meet the quality and quality guideline can be developed and followed it
effectively.
Technician: The project is to developed new technology that is mild hybrid car for this purpose
proper coordination between technician and team member is required. Along with this, changes
is need to made if required by technician (Kubba, 2010)..
Project life cycle
For introducing a new technology that is Hybrid it is important for the firm to follow a proper
steps so that it can be implemented successfully without missing any important activity. There
are some steps in the project life cycle which are as follows:
Initiation:
The first step if start the project so for initialising the plan TSK bearing ltd. Required to develop
a project charter as in it all the activities and resources are mentioned which are required for the
project(Lientz, 2012).. Along with this time and deadline of each activities are need to included
in it. Further all the employees and staff members who are involved in this project are mentioned
with the goal and objective of the project
Planning: In second step proper planning is need to be done and management plan is created.
Further scope and risk related to the project which will bring in future is discussed. So that plan
can be made for resolving any future or present risk. Cost of each activities and from where
information will be gathered is also included in this stage.
6
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Execution: For TSK bearing it is important to make sure that quality of Mild Hybrid technology
is up to the standard or not. Further plan will be started after finishing this activity (Rakos and
et.al., 2015.)..
Monitoring and controlling: After starting the project it should be properly monitored and
controlled so that each and every activity can be accomplished successfully.
Closing: At the last stage the project is closed with all the details related to the project which is
discussed.
Figure 2Project life cycle
Risk management:
At the time of executing project there are different types of risk which are associated with the
Mild Hybrid project that need to be identified and overcome.
Identification of risk:
If there are changes in the scope
Due to shortage of the resources and quality of product
7
is up to the standard or not. Further plan will be started after finishing this activity (Rakos and
et.al., 2015.)..
Monitoring and controlling: After starting the project it should be properly monitored and
controlled so that each and every activity can be accomplished successfully.
Closing: At the last stage the project is closed with all the details related to the project which is
discussed.
Figure 2Project life cycle
Risk management:
At the time of executing project there are different types of risk which are associated with the
Mild Hybrid project that need to be identified and overcome.
Identification of risk:
If there are changes in the scope
Due to shortage of the resources and quality of product
7
 In case of failure of the project ((Kerzner, 2009).).
 If budget of the project is reached out of the expected cost
 If quality not up to the satisfactory level
 Resources are not available on time
 Any activity of the project not completed on the given time.
 If there is not satisfaction in quality level and shortage of labour

No Risk Occurring of
risk
Project Measures
1 Not
availability
of resources
Due to delay
by supplier
in delivering
the resources
Moderate Cost of the
project can
be increased.
Proper
communicati
on with
supplier
Role and
responsibility
of supplier.
2 Shortage of
labour and
quality
Due to
improper
training
provided to
employees
Moderate There are
chances of
delay in
activities as
because of
fight
between
team
member
Offer high
wage to
ensure
quality work
Responsibilit
y of contract
3 Failure of
project
This may be
happening
due to the
improper
planning of
the project
(Janda and
High Due to this
reason
project can
be cancelled
Proper
planning and
communicati
on
Responsibilit
y of the
project
manager
8
 If budget of the project is reached out of the expected cost
 If quality not up to the satisfactory level
 Resources are not available on time
 Any activity of the project not completed on the given time.
 If there is not satisfaction in quality level and shortage of labour

No Risk Occurring of
risk
Project Measures
1 Not
availability
of resources
Due to delay
by supplier
in delivering
the resources
Moderate Cost of the
project can
be increased.
Proper
communicati
on with
supplier
Role and
responsibility
of supplier.
2 Shortage of
labour and
quality
Due to
improper
training
provided to
employees
Moderate There are
chances of
delay in
activities as
because of
fight
between
team
member
Offer high
wage to
ensure
quality work
Responsibilit
y of contract
3 Failure of
project
This may be
happening
due to the
improper
planning of
the project
(Janda and
High Due to this
reason
project can
be cancelled
Proper
planning and
communicati
on
Responsibilit
y of the
project
manager
8
Killip,
2013).
4 If there is
change in
scope
This may
take place
due to lack
in fund
High This may
lead to poor
quality and
submission
will be late.
Changes
need to made
in scope
Responsibilit
y of client
and project
sponsor
6 Extension of
construction
period
Due to bad
whether such
as rain or
strike
High Lead to
increase in
cost
Deliverable
allow float
Role of
contract of
see it.
Communication management:
According to the company the entire project team will determine different communication
method and policies for successful completion of project. It is important to communicate with
both internal and external stakeholder and provide them information related to new project Mild
Hybrid system. A share point platform need to be maintained by the firm through sharing all the
information related to the project with the stakeholders (Bryde, 2003). In respect to collaborate
with the work of project it leads to provide data and information related to the project. Further
other shareholder not have access on the share point can easily view all the information through
visiting to the sites of the firm. As they can easily get username and password for accessing the
site. Further it is important for project manager that all the information related to the project
should be communicated and its document uploaded on website so that other can easily view it.
9
2013).
4 If there is
change in
scope
This may
take place
due to lack
in fund
High This may
lead to poor
quality and
submission
will be late.
Changes
need to made
in scope
Responsibilit
y of client
and project
sponsor
6 Extension of
construction
period
Due to bad
whether such
as rain or
strike
High Lead to
increase in
cost
Deliverable
allow float
Role of
contract of
see it.
Communication management:
According to the company the entire project team will determine different communication
method and policies for successful completion of project. It is important to communicate with
both internal and external stakeholder and provide them information related to new project Mild
Hybrid system. A share point platform need to be maintained by the firm through sharing all the
information related to the project with the stakeholders (Bryde, 2003). In respect to collaborate
with the work of project it leads to provide data and information related to the project. Further
other shareholder not have access on the share point can easily view all the information through
visiting to the sites of the firm. As they can easily get username and password for accessing the
site. Further it is important for project manager that all the information related to the project
should be communicated and its document uploaded on website so that other can easily view it.
9
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Commination matrix
Type of
communic
ation
Communi
cation
objective
Medium Frequency Audience Owner Deliverabl
e
Format
Project
team
meetings
Communi
cation is
need to be
done and
review the
project
Through
conference
or face to
face
meeting
Need to
organized
weekly for
project
completio
n
successfull
y
Project
team
member
Project
manager is
owner
Schedule
for project
Soft copy
need to be
kept
Project
status
report
In this
communic
ation is
done
related to
the cost
and
project
activities
This can
be
communic
ated
through
email
Conducted
monthly
Main
audience
is
stakeholde
r and
project
sponsor
It is led by
project
manager
Schedule
for project
project
status
report
On share
point soft
copy is
archive
Meeting In this
face to
face
introductio
n is done
between
the project
manager
and team
Face to
face
medium is
used so
that all the
informatio
n can be
shared
This
meeting is
need to
organized
once in a
month
Main
audience
is
stakeholde
r and
project
sponsor
Project
manager
Minute
meeting
Soft copy
of
informatio
n is kept
10
Type of
communic
ation
Communi
cation
objective
Medium Frequency Audience Owner Deliverabl
e
Format
Project
team
meetings
Communi
cation is
need to be
done and
review the
project
Through
conference
or face to
face
meeting
Need to
organized
weekly for
project
completio
n
successfull
y
Project
team
member
Project
manager is
owner
Schedule
for project
Soft copy
need to be
kept
Project
status
report
In this
communic
ation is
done
related to
the cost
and
project
activities
This can
be
communic
ated
through
Conducted
monthly
Main
audience
is
stakeholde
r and
project
sponsor
It is led by
project
manager
Schedule
for project
project
status
report
On share
point soft
copy is
archive
Meeting In this
face to
face
introductio
n is done
between
the project
manager
and team
Face to
face
medium is
used so
that all the
informatio
n can be
shared
This
meeting is
need to
organized
once in a
month
Main
audience
is
stakeholde
r and
project
sponsor
Project
manager
Minute
meeting
Soft copy
of
informatio
n is kept
10
member in
order to
review the
objective
of the
project
easily
Technical
meeting
The
technical
designed
that is
been
developed
is disused
The
medium is
face to
face
As per the
requireme
nts it is
been done
The
technical
staff are
the
audience
The owner
is
technical
lead.
Agenda
are
delivered
On share
point soft
copy
Task Name Duration Start Finish Predecessors Total Slack
TSK bearings 55 days Tue 12/26/17 Mon 3/12/18 0 days
Starting 33 days Tue 12/26/17 Thu 2/8/18 0 days
Project deadline and
time need to set 19 days Tue 12/26/17 Fri 1/19/18 1 day
Staff members
involved in this project 13 days Mon 1/22/18 Wed 2/7/18 3 1 day
need to discuss goals
and objectives of project 11 days Mon 1/22/18 Mon 2/5/18 3 2 days
Planning 51 days Fri 12/29/17 Fri 3/9/18 0 days
project scope need to
discussed 11 days Thu 2/8/18 Thu 2/22/18 4 11 days
Plan need to be made
for managing project 16 days Fri 2/9/18 Fri 3/2/18 2 5 days
Roles and
responsibilities of project
with the breakdown
structure
16 days Tue 2/6/18 Tue 2/27/18 5 8 days
Budget of the project
is set 5 days Fri 2/9/18 Thu 2/15/18 2 16 days
Execution 11 days Thu 2/8/18 Thu 2/22/18 0 days
Ensuring quality of the
project 6 days Thu 2/8/18 Thu 2/15/18 4 5 days
11
order to
review the
objective
of the
project
easily
Technical
meeting
The
technical
designed
that is
been
developed
is disused
The
medium is
face to
face
As per the
requireme
nts it is
been done
The
technical
staff are
the
audience
The owner
is
technical
lead.
Agenda
are
delivered
On share
point soft
copy
Task Name Duration Start Finish Predecessors Total Slack
TSK bearings 55 days Tue 12/26/17 Mon 3/12/18 0 days
Starting 33 days Tue 12/26/17 Thu 2/8/18 0 days
Project deadline and
time need to set 19 days Tue 12/26/17 Fri 1/19/18 1 day
Staff members
involved in this project 13 days Mon 1/22/18 Wed 2/7/18 3 1 day
need to discuss goals
and objectives of project 11 days Mon 1/22/18 Mon 2/5/18 3 2 days
Planning 51 days Fri 12/29/17 Fri 3/9/18 0 days
project scope need to
discussed 11 days Thu 2/8/18 Thu 2/22/18 4 11 days
Plan need to be made
for managing project 16 days Fri 2/9/18 Fri 3/2/18 2 5 days
Roles and
responsibilities of project
with the breakdown
structure
16 days Tue 2/6/18 Tue 2/27/18 5 8 days
Budget of the project
is set 5 days Fri 2/9/18 Thu 2/15/18 2 16 days
Execution 11 days Thu 2/8/18 Thu 2/22/18 0 days
Ensuring quality of the
project 6 days Thu 2/8/18 Thu 2/15/18 4 5 days
11
Providing training and
development facility to
project member
11 days Thu 2/8/18 Thu 2/22/18 5 0 days
Monitoring and
controlling 27 days Wed 1/24/18 Thu 3/1/18 0 days
Monitoring and
controlling the project 15 days Fri 2/9/18 Thu 3/1/18 2 0 days
Monitoring resources
involved project 13 days Wed 1/24/18 Fri 2/9/18 3 14 days
Making changes after
monitoring if required 15 days Tue 2/6/18 Mon 2/26/18 5 3 days
Closure 17 days Thu 2/8/18 Fri 3/2/18 6 days
measuring entire
project 16 days Fri 2/9/18 Fri 3/2/18 2 6 days
Modifying if required
in project 15 days Thu 2/8/18 Wed 2/28/18 4 8 days
12
development facility to
project member
11 days Thu 2/8/18 Thu 2/22/18 5 0 days
Monitoring and
controlling 27 days Wed 1/24/18 Thu 3/1/18 0 days
Monitoring and
controlling the project 15 days Fri 2/9/18 Thu 3/1/18 2 0 days
Monitoring resources
involved project 13 days Wed 1/24/18 Fri 2/9/18 3 14 days
Making changes after
monitoring if required 15 days Tue 2/6/18 Mon 2/26/18 5 3 days
Closure 17 days Thu 2/8/18 Fri 3/2/18 6 days
measuring entire
project 16 days Fri 2/9/18 Fri 3/2/18 2 6 days
Modifying if required
in project 15 days Thu 2/8/18 Wed 2/28/18 4 8 days
12
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13
CONCLUSION
From the above report it is concluded that before implementing any project it is important to
properly plan it and review. There are different steps involved in the project that will help in
completing the project successfully. Further There are different types of resources which are
required for implementing the plan successfully such as human resources, capital etc. further it is
concluded that project manager play significant role as it delegate works to team member and
resolve conflict between them. Further it is important to complete all the activities of the project
on time as delay of one activity can increase cost and time of the project. All the project should
be properly monitored and controlled so that risk can be avoided and it is completed on time.
14
From the above report it is concluded that before implementing any project it is important to
properly plan it and review. There are different steps involved in the project that will help in
completing the project successfully. Further There are different types of resources which are
required for implementing the plan successfully such as human resources, capital etc. further it is
concluded that project manager play significant role as it delegate works to team member and
resolve conflict between them. Further it is important to complete all the activities of the project
on time as delay of one activity can increase cost and time of the project. All the project should
be properly monitored and controlled so that risk can be avoided and it is completed on time.
14
REFERENCES
Books and Journals
Addis, B., 2012. Building with reclaimed components and materials: a design handbook for
reuse and recycling. Routledge.
De Bruijn, H. and Ten Heuvelhof, E., 2010. Process management: why project management fails
in complex decision making processes. Springer Science & Business Media.
Dykstra, A., 2011. Construction project management: A complete introduction. Kirshner
Publishing Company.
Griffith, A., Stephenson, P. and Watson, P., 2014. Management systems for construction.
Routledge.
Hallowell, M.R. and Wehle, A., 2013. Proactive construction safety control: Measuring,
monitoring, and responding to safety leading indicators. Journal of Construction
Engineering and Management, 139(10), p.04013010.
Ilozor, B. D. and Kelly, D. J., 2012. Building information modeling and integrated project
delivery in the commercial construction industry: A conceptual study. Journal of
Engineering, Project, and Production Management. 2(1). p.23.
Janda, K. B. and Killip, G., 2013. Building expertise: renovation as professional
innovation. Constructing green: The social structures of sustainability. pp.35-55.
Kubba, S., 2010. Green construction project management and cost oversight. Butterworth-
Heinemann.
Lientz, B. P., 2012. Project Management: A problem-based approach. Palgrave Macmillan.
Nicholas, J. M. and Steyn, H., 2017. Project management for engineering, business and
technology. Taylor & Francis.
Rakos, J. and et.al., 2015. The practical guide to project management documentation. John
Wiley & Sons.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Online
Structure of project . 2017. [Online] <http://www.epmbook.com/structure.htm/>
15
Books and Journals
Addis, B., 2012. Building with reclaimed components and materials: a design handbook for
reuse and recycling. Routledge.
De Bruijn, H. and Ten Heuvelhof, E., 2010. Process management: why project management fails
in complex decision making processes. Springer Science & Business Media.
Dykstra, A., 2011. Construction project management: A complete introduction. Kirshner
Publishing Company.
Griffith, A., Stephenson, P. and Watson, P., 2014. Management systems for construction.
Routledge.
Hallowell, M.R. and Wehle, A., 2013. Proactive construction safety control: Measuring,
monitoring, and responding to safety leading indicators. Journal of Construction
Engineering and Management, 139(10), p.04013010.
Ilozor, B. D. and Kelly, D. J., 2012. Building information modeling and integrated project
delivery in the commercial construction industry: A conceptual study. Journal of
Engineering, Project, and Production Management. 2(1). p.23.
Janda, K. B. and Killip, G., 2013. Building expertise: renovation as professional
innovation. Constructing green: The social structures of sustainability. pp.35-55.
Kubba, S., 2010. Green construction project management and cost oversight. Butterworth-
Heinemann.
Lientz, B. P., 2012. Project Management: A problem-based approach. Palgrave Macmillan.
Nicholas, J. M. and Steyn, H., 2017. Project management for engineering, business and
technology. Taylor & Francis.
Rakos, J. and et.al., 2015. The practical guide to project management documentation. John
Wiley & Sons.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Online
Structure of project . 2017. [Online] <http://www.epmbook.com/structure.htm/>
15
1 out of 16
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.