There are two parts for this assessment: 1 Discussion Forum (Part A) that prepares students to write a Change Management Plan (Part B). Each student will construct an initial response in approximately 500 words to the following questions and post on the Module discussion forums.

Business Project Management Change Control

Assessment 1: Change Management (2 parts) in the subject PROJ6003 Project Execution and Control at Laureate International Universities.

   Added on 2022-08-12

ShareRelated Documents
Running head: BUSINESS PROJECT MANAGEMENT
Business Project Management Part B: Change Control
Name of Student
Name of University
Author Note
Business Project Management Change Control_1
1
BUSINESS PROJECT MANAGEMENT
Table of Contents
Introduction..........................................................................................................................2
1. Identification of the Changes Required...........................................................................2
2. Process of Submitting a Change Request........................................................................5
3. Options to satisfy each change and Risks........................................................................6
4. Change Request Form......................................................................................................8
Conclusion...........................................................................................................................9
Bibliography......................................................................................................................10
Business Project Management Change Control_2
2
BUSINESS PROJECT MANAGEMENT
Introduction
Change is an inevitable part of any project and proper management of changes in a
project is necessary to ensure that a project is proceeding as per plan (Heldman, 2018). Effective
project management is associated with proper change control and change management so that at
the end of the project, the key project specifications are met (Stackpole, 2013). A number of
problems were identified for the blue spider project that needed effective management to ensure
that the project is a success. In the following paragraphs the changes that were needed in the blue
spider project were identified followed by discussing the process of submitting a change. The
report further discusses the options of satisfying each change and the key risks associated with
the option of change. The report provides the evidence of a complete change request form
associated with the chosen project.
1. Identification of the Changes Required
The case study Blue Spider needed significant changes that could have eliminated or
significantly reduced the chances of project failure.
The analysis of the case indicated that there were certain issues with the project plan that
lead to the project going over budget. The key change that is needed in the blue spider project is
redesign and develop the project plan that will ensure that the key specification of the project are
met.
Another change that is essential for the project include change in the communication
process of the project. There were issues with the communication within the team as the team
lacked effective communication. To formulate this change and incorporate the same in the
project it is essential to properly identify the key communication needs in the project.
Business Project Management Change Control_3
3
BUSINESS PROJECT MANAGEMENT
Another change that is required in the blue spider project is related to management of the
human resources. The analysis of the case study indicate that there are certain issues that were
faced with the management of the human resources. The changes were needed in terms of
allocation of the human resources throughout the entire duration of the blue spider project.
The identified changes in the project will have certain impact on scope, time, cost and
quality of a project. The impact of the said changes and the technique of managing the impact of
the changes on scope, time, cost and quality of the project are indicated in the following table-
Changes Needed Impact on Scope, Time,
Cost and Quality
Techniques to Manage the
Impact
Changes in Project Plan Time: The project might
require additional time for
completion (Hornstein,
2015)
Cost: Changes in Project plan
while the project is in its
execution stage might incur
additional cost to complete
the project
The impact on the time and
cost can be managed by the
technique of project crashing.
Project crashing can
accelerate the project
schedule and can help in
completion of the project on
time. Crashing some
unimportant tasks will help in
releasing the cost associated
with those tasks, thus helping
in managing the project
scope.
Changes in Communication Scope: The change in the The change in the scope of
Business Project Management Change Control_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Assignment - The Blue Spider Project
|10
|1866
|15

The Blue Spider Project Report 2022
|11
|2168
|15

Computer Standards & Interfaces
|10
|2167
|22

Impact on Project And Techniques to Manage
|12
|2310
|14

Project Execution Assignment Review
|10
|2161
|19

DEVELOPING THE CHANGE CONTROL REPORT
|13
|2360
|15