This assessment kit is for Project Management Practitioner BSBPMG511, 517, 520. It includes information on the competencies being assessed, the assessment process, and the assessment requirements. The kit covers topics such as project scope management, project risk management, and project governance.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 contents ASSESSMENT INFORMATION.............................................................2 Competencies Being Assessed......................................................................2 Assessment Process......................................................................................3 Progress Checklist.........................................................................................5 ASSESSMENT COVERSHEET..............................................................6 Supervisor/Manager Support and Communication........................................7 ASSESSMENT REQUIREMENTS..........................................................8 1.Knowledge Questions.............................................................................8 2.Tasks....................................................................................................11 1
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Assessment Information Competencies Being Assessed BSBPMG511 Manage project scope 1.Conduct project authorisation activities 2.Define project scope 3.Manage project scope control process For a full view of this unit of competency please visit https://training.gov.au/Training/Details/BSBPMG511 BSBPMG517 Manage Project Risk 1.Identify project risks 2.Analyse project risks 3.Establish risk treatments and controls 4.Monitor and control project risks 5.Assess risk management outcomes For a full view of this unit of competency please visit https://training.gov.au/Training/Details/BSBPMG517 BSBPMG520 Manage Project Governance 1.Identify project management structure 2.Apply project governance policies and procedures 3.Monitor and review project governance For a full view of this unit of competency please visit https://training.gov.au/Training/Details/BSBPMG520 2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Assessment Process Purpose of Assessment The assessment is designed to help you gather evidence of your competence against the requirements of the unit of competency (as outlined above) while applying your learning in the workplace. Your evidence may take a variety of forms and must be: Authentic – your own work Valid – related to the competency Sufficient – appropriate quantity and quality Current – recent proof of your skills and knowledge When should I submit this assessment? It is recommended that you submit this assessment within the first three (3) months of your enrolment. You have twelve months to submit all the assessments for the Diploma of Project Management. Please advise AIM if you anticipate needing more time so that your records can be updated. Use this assessment kit to complete your responses to the assessment, attaching additional evidence and documentation as appropriate. Please ensure all additional documents are clearly labelled so that your assessor understands the relevance to specific parts of the assessment. Assessment Submission and Feedback Submit your assessment online viamyAIM. Once submitted, your assessment will be assessed and feedback returned to you viamyAIM. You will receive an assessment of either Competent or Not Yet Competent. If you receive a Not Yet Competent assessment you will be provided with one (1) more opportunity to submit your work. If you are assessed as Competent, you will be eligible for a Statement of Attainment. If you are enrolled in a full qualification, you will be issued with a Certificate and Transcript upon successful completion of all of your units. Video evidence You are required to submit video evidence for part of this assessment. Ideally you will upload your video evidence to YouTube (as a private link) and supply the link to your assessor. Seek permission from any participants that are involved and ensure they are aware of the purpose of the video, i.e. to assess your competence in a task. Technical tools for completing this assessment To complete this assessment you need access to: A computer with internet 3
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Programs for word processing and other relevant programs to develop project management documentation and reports as required (please use work tools wherever possible) A camera or video recording device such as a mobile phone. 4
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Progress Checklist This checklist is designed to help ensure you don’t miss anything when completing your assessments and preparing them for submission. ItemComplete? Read and ensure you understand the AIM Student Handbook. Particularly in terms of your rights and responsibilities. Access the Student Handbookon the AIM website. Read the assessment information, particularly the competency being assessed Complete the cover sheet Answer the knowledge questions within this assessment kit Complete the tasks within this assessment kit. Compile your complete submission, ensuring that all additional documents and attachments are appropriately labelled. Also ensure any media submissions such as video and audio are ready for submission. Save this assessment document with the following name: Surname_firstname_Assessmentkit1of4 Save additional documents with the following name: Surname_firstname_Assessment1of4_tasknumber_docum enttype For example: Smith_Jane_ Assessment1of4_Task2.2.1_projectcharter Or Smith_Jane_ Assessment1of4_Task2.2.1_meetingminutes 5
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Submit your assessments viamyAIM. 6
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Assessment Coversheet Program title:Project Management Practitioner Unit of competency: BSBPMG511 Manage project scope BSBPMG517 Manage project risk BSBPMG520 Manage project governance Program date: Name:Email: Telephone:Mobile: Organisation: A brief description of your organisation: A brief description of your team/department: A brief description of your role: You will submit your completed assessment online throughmyAIM. By making this submission you agree to the following declaration: Declaration: oI have read and understand the information contained within theStudent Handbook oAll responses and evidence submitted here are my own work and contain no material written by another person, except where due reference is made oI understand that the Australian Institute of Management Education and Training will retain information relating to my assessment and not disclose it to third parties without my permission, with the exception of my employer on request (where my employer is financing my course) and AIM service providers (such as my assessor) acting in confidence on my behalf. 7
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Supervisor/Manager Support and Communication Having the support of your supervisor/manager will assist you in completing your assessment and applying your learning back into the workplace. Please note:This is not a compulsory part of the assessment process. Communication with your Supervisor/Manager Participant CommentSupervisor/Manager Comment Review your experience of the training Discuss the assessment requirements and its applicability to the workplace Identify the resources and support needed to complete the assessment Agree a plan of action for successful completion within the timeframes Discuss your satisfaction with the training and assessment process Participant Name: Date: Supervisor/Manager Name: Phone# Date: 8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Assessment Requirements 1.Knowledge Questions Instructions Answer all parts of each question Use your own words and give examples wherever possible The quality of your answer is more important than how long it is Enter your answers in this document Answer the following questions: 1.1.Identify 3 components of a project scope management plan Answer: The three components of project scope management plan include: 1. Scope statement 2. Work breakdown structure 3. Deliverables 1.2.Describe 3 factors likely to require changes to the project scope Answer: The three factors which likely to required changes to project scope includes: 1. Legal constraints: it may createchangesin the scope project asany change in laws and regulations may directly impact on the project and the way it carries out. 2. External and internal risks:there are several tests present in external and internal environment which impact on the activities and operations of project. Proper analysis of these risks are very necessary as these directly impact on the scope of project. 3. Variable resource levels:level of resources in project management may bring changes to the project scope. The resources like people, capital, materials and technology are needed for successful completion of which also determines the scope of project. Any variability in the resources bring changes in the scope of project. 1.3.Outline 2 tasks of a formal change control process. Answer: The two task of formal change control process includes: 9
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 1. Defining the change request which includes information about actual request, reason for request, condition of success, expected completion and expected value. 2. Submit and review of the change request. 1.4.Describe 2 reporting methods for measuring work outcomes and progress against plans. Answer: The two reporting methods for measuring work outcomes and progress against plans includes: 1. Written reporting which includes tabulated information, formal financial statements etc. 2. Graphic reporting which involves pie chart, flow chart, bar chart, control chart, progress chart, break even chart etc. Apart from this, use of work breakdown structure and Gantt chart also help in measuring work outcomes and progress against plans. 1.5.Describe a method for developing a work breakdown structure Answer: There are two methods through which work breakdown structure can be developed. These are: 1. Pictorial method: this work breakdown structure looks like organizational chart. Its structure is like reverse tree and EA descending node depicts a component of high level node. 2. Outline method:it looks like list of items and has sub items also. Each small item of work breakdown structure depicts high level item component. 1.6.Describe a method for documenting a work breakdown structure Answer: The method for documenting work breakdown structure includes: 1. project deliverables are appropriately determined and organized in hierarchical structure. 2.Workprocessaredeterminedinproperwaytomakesureprojectteammembershavesimilar understanding of what request to be done some work process to ensure delivery of project. 1.7.Identify and describe 3 problem areas likely to be encountered in scope management Answer: The three problem areas which are likely to be encountered in scope management includes: 1. Poor alignment with goals and objectives. 2. Not including all the work 3. Gold plating 10
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 1.8.Explain the procedures for reporting scope change in your workplace Answer: The procedure for reporting the scope change in workplace includes: Solicit potential scope alteration request from project stakeholder involving client, sponsors and project team. Scope change management metrics Scope change impact analysis Scope change decision Scope alteration log for tracking purposes Assign scope change request to member of team for further investigation Take scope change request Document the cause of action Brief documentation of resolution on scope change log. After approval, appropriate activities are added Current project definition must be updated. 1.9.Explain the term “project life cycle” and include the stages of the life cycle Answer: Project life cycle can be defined as a framework which is designed to assist the managers 2 guide the project successfully from the initiation to completion. Its main purpose is to develop a framework which is easy to follow for guiding the project. It helps project manager in effectively managing the project and ensure its successful completion. The project life cycle includes four stages, that are initiation, planning, execution and closure. In the initiation phase, priorities, deadlines, goals and risks are understand. The second stage outlines the tasks as wellas time needed to implement a project. Execution phase brings the plan into action and performance is monitored. In the last stage results are analyzed, learnings are summaries along with next steps of plan. 1.10.Explain the significance of scope management Answer: Scope is defined as the descriptive set of deliverables of project. Scope management is very important as it makes sure that the scope of project is defined and mapped accurately and allow the project managers to assign proper cost and labour needed to finish the project. Managing the expectations of clients and stakeholders is a challenging task. With specified project scope, it becomes easier for project manager to stay on track and make sure that the deadlines are being followed in the entire project life cycle. 1.11.Identify 3 project management tools that can be used for managing scope Answer: 11
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 The three project management tools which can be used for managing the scope of project includes: 1. PERT chart 2. Logic network 3. Work breakdown structure 1.12.Outline 3 roles and responsibilities of a project manager in relation to project planning Answer: The main roles and responsibilities of project manager associated with the project planning are as follows: 1. Activity and resource planning 2. Organizing as well as motivating the project team 3. Cost estimation and development of budget. 1.13.Identify 3 types of project initiation documentation Answer: The three types of project initiation documents include: 1. Business case 2. Cost case 3. PID sign off 1.14.Describe the purpose of a governance plan and identify 3 things that should be included Answer: Governance plan is the plan which documents the approach to the way decisions aremade on project. It defines responsibilities and roles along with the time frame within which decisions should be made. An effective governance plan gives the framework for service level agreements, information architecture, design standards, infrastructure maintenance and overall measurement plan. The three things which must be included in the governance plan are as follows: 1. Roles and responsibilities 2. Vision statement 3. Policies and standards 1.15.Explain the nominal group technique for moderating and resolving conflicts in a project. Answer: Nominalgrouptechniqueisconsideredasapartofteamandinterpersonalskills.Itimproves brainstorming with the process of voting utilise to rank useful ideas for prioritisation or for further brainstorming. With help of nominal group technique, a balance can be find out between two highly sought after elements concept - collecting proper information an encouraging discussion in group to get grip on different viewpoints. It enables to combine the emphasis of individual reflection with group discussions richness. This technique helps in moderating and resolving conflicts in the project by combination of individual as well as collective steps. It provides the ability to determine and develop consensus between different stakeholders and provides a clear output. 12
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 1.16.Identify 2 potential project risks for each of the following risk categories a)Human resources b)Compliance c)Finance Answer: The potential project risks in relation tohuman resourceare: 1. Workers comp injuries, lost productivity and medical cost 2. Theft and embezzlement The potential risks associated withcomplianceincludes: 1. Regulatory and political uncertainty 2. Conflicts of interest The potential project risks in context offinanceand as follows: 1. Supply risk 2. Repayment risk 1.17.Explain 4 key components of a risk management plan Answer: The key components of risk management plan are as follows: 1. Risk breakdown structure 2. Risk register 3. Probability impact matrix 4. Accuracy estimates (cost and schedule) 1.18.Using the risk rating matrix below, identify the risk score for each of the following and explain why: a)You have an inexperienced team member working on the project 13
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Answer: The risk score if an inexperienced team member working on the project is 25. There is a severe risk as if the team member is inexperienced then he or she will not be able to perform their roles and responsibilities effectively. Apart from this, the project manager requires to provide much guidance and direction to the inexperienced team member which takes a lot of time and may lead to delay in completion of the project activities. b)Workplace policies and procedures are not being implemented Answer: If the policies and procedures of workplace are not being executed properly, then the risk score is 12. The reason behind this is there are high chances that employees are not working effectively and in systematic and ethical way if the policies and procedures are executed improperly. The likelihood of risk is high and its impact is moderate. c)The project budget has been exceeded Answer: If the project budget has been exceeded, then the risk score is 12 which means the likelihood of risk is high and the impact of risk major on the project. If the project goes over the budget, which brings financial stability. It can cause project to take much money and time then planned in starting. 1.19.Identify 3 further risk categories that might be related to your industry Answer: The risk categories which might be related to retail industry are as follows: 1. Inventory damage 2. Failing to monitor competitors 3. Data breaches as well as digital theft 1.20.How can the AS/NZS ISO 31000:2009 standard be applied to project risk management? Answer: The ISO 31000 2009 be applied to harmonize processes of risk management in existing as well as future standards. It renders a common approach or method in support of standards dealing with particular sectors or risk and doesn't replace those. It can be applied to any sort of risk which weather having negative or positive consequences. It renders generic guidelines and not intended to promote risk management uniformity across company. The design and execution of plans and frameworks of risk management bill required to take into consideration different needs of organisation, its objectives, processes, operations, structure, function, products and particular practices employed. 1.21.Describe the processes and techniques used to apply the following risk management approaches: 14
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 a)Quantitative Answer: Qualitative analysis needs that the consequences and probability of risk be evaluated by utilizing established methods and tools of qualitative analysis, describing them in terms like very low, low, moderate, high and very high. On each risk event, two risk dimensions are applied and outcomes may be plotted utilizing probability impact matrix. The techniques applied for performing qualitative risk analysis involves brainstorming, Delphi technique and interviewing. b)Qualitative Answer: Quantitative risk analysis is specifically used to anticipate potential schedule and cost outcomes of project listing the related confidence level of every potential value of considered value. This approachdeterminesprobabilityofaccomplishingparticularprojectobjectiveandquantify exposure of risk for project. The techniques used to perform quantitative risk analysis includes decision tree analysis, sensitivity analysis, modelling simulation, expected monetary value analysis etc. 15
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 2.Tasks Instructions Acknowledge any information you have used (websites, books etc.) by referencing the original source. For more information about how to reference, please refer to theAIM Harvard Referencing Guide. You will be asked to provide examples and evidence to support your answers; attach additional documents and work samples where appropriate to demonstrate your competency. Please remove any private or sensitive information from your evidence by blacking it out. This includes any personal information identifying individuals or confidential business information. Before you submit your work please ensure you have clearly named and labelled your documents so that your assessor knows what submissions relate to which questions and tasks. Refer to the Progress Checklist in this assessment kit for how to name your documents. For some tasks you are required to submit workplace evidence to support your answers. Important note: Please be aware that assessment evidence provided from your workplace will be treated as commercial-in-confidence. Workplace evidence and project documentation You will be required to submit and/or develop workplace documents related to project management for your chosen project/s.In all cases you are encouraged to use the documentation, templates and tools that are used in your workplace. This means that if your workplace utilises IT/online or digital tools to run projects you may submit the work you do using these tools. For example, you will be asked to submit a risk management plan for your project. You may not have developed a risk management plan (word document) but have a documented risk analysis and strategy in your online PM tool. In this case, you would submit this, or use the tools to develop your plan. Project Management templates If required, PM templates will be available inmyAIMfor you to use. You may use these as templates or guidance for what should be reflected in your own documentation. 16
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Select a project To complete the assessment tasks you need to select a project as the basis for your responses. You have a number of options: 1.Select a workplace project you have managed in the past. 2.Select a small (short term) workplace project that you are currently managing. 3.Create a small (short term) workplace project that you will manage. Complete the following tasks in relation to this project. Record your answers in this document. 17
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Task 1 Project Initiation & Governance 2.1.1.Source and submit documentationin relation to how you communicated the project initiation and governance information to relevant stakeholders. The documents must demonstrate that you have developed a governance planand that you obtained the relevant approvals before starting your project. These documents may include: Project charter Project nameIVR project Date of project approval 8 march 2020 Project descriptionThis project is planned for introducing a automatic telephone system using IVR technology which allow reducing thecustomer issues by ensuring that all calls get attend. ScopeThe scope is very broad as it help the sales team of ALDI in taking order and reducing the waiting time for customers to resolve queries along with getting a better assistance in training staff members to solve issues of customers. Business caseThe competition is increasing at marketplace which require ALDI to put some extra effort to keep customers base maintain as delay and dissatisfaction lead customers to switch brand. Project deliverableThis project will assist sales team, help in training sales team and also support during first operational month. BenefitsThis will be helpful in increasing order per sale person, unhandled calls reduced and help in getting maximum customer satisfaction StakeholdersTechnical staff, financial manager, consumers, IT expert, CEO etc. RiskRisk related with the understanding of work is high as staff do not have previous experience, Delegation of authority for the project As the project is based on IT infrastructure, so the role for all the configuration, setting, system update and training to employees are assigned to IT department. Rest the preparing of budget is assign to finance manager, sales team are delegated with a role to provide information about basic queries to create program in IVR etc. Meeting minutes ALDI 18
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Meeting minutes Opening The meeting for the discussion of IVR technology project was called for 10:00 PM on march 6 2020. Present Project manager Department head of IT, Department head of HR, Finance manager, sales manager, CEO, Branch head of ALDI. Approval of Agenda The agenda was unanimously approved as disturbed Approval for minute It is approved for getting future reference about basic information Things discussed in meeting The discussion was all about the project plan going to be start for IVR technology. The project manager discussed about the importance of its in customers satisfaction. This technology will help in reducing the burden of sales team and also help in providing the more order per sales person. This help in dealing with competition, customer issue, increasing sales and profit. Adjournment Meeting was adjournment at2 pm in afternoon. 2.1.2.Describe the project background, its purpose, key deliverables, and how it will contribute to the organisations vision, goals and strategic direction. Ans The project is based on inserting the IVR system to the ALDI so that the sales team can generate more leads for further sale by attending all the calls so that the products can be further deliver to the customers. This in turn help in keeping the customer satisfied as their all calls get answered and on the other side also help the sales person in increasing the volume of sale per person. The main deliverable would be a new method of increasing sale by maintaining direct contact with customers. This will support in fulfilling the goals and mission of ALDI i.e. remains 24 hour over their services as with eth help of this customers can either place order online or directly contact the sales person and get their order deliver. 2.1.3.Who are the key stakeholders for your project and how were they involved in the project initiation phase? 19
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 The main stakeholders for this project are brand managers, CEO, sales manager, head of IT and head of HR department etc. will be the main stakeholder fro this project. These all will involve in project initiation stage where planning regarding project will be done and they will provide with their valuable suggestion as per area of expertise and help in determining the feasibility of project. This help in further identifying set of actions to be taken into consideration. 2.1.4.How was project authority for decision-making delegated? Create a RACI matrixof the roles and responsibilities within the project. For effective execution project the delegation of authority in right manner is crucial as it is a step toward success. For this IVR technology installation project the authority are delegated as per the area of work. So the majority of authority to guide and direct the work are assigned to IT manager of project who handle all the actions to be taken in technical way. Additionally training to employees authority are assigned to HR manager, finance related decision authority are for Finance manager. These are represent with the help of RAXCI matrix that make it easier for the people involve in team to understand their part of responsibility. 2.1.5.How do the delegatedproject authoritiesdiffer from the organisation’sfunctional authorities(provide at least one example)? What are the implications of this on the stakeholders involved and how the project will be managed? Ans The delegation of project authority is different from functional authority, as the project manager usually direct how and by whom work to be done for short term goal of an organisation that is a project. But the functional authorities are delegated for longer period of time as per power, experience and responsibilities which remain for overall organisation. 2.1.6.What is the project management methodology, framework or approach that will be applied to this project? Why was this approach chosen? The project management methodology is consist of set of principles and practices that help in guiding the project manager about the practices and actions to be consider for ensuring the optimum performance. For this project the waterfall methodology of project management is consider. The main reason behind considering this is that it supports in executing the tasks of project in sequential manner which reduce chances of errors. 20
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Task 2 Project Scope Management Planning 2.2.1.Develop and submita work breakdown structure (WBS) for the project. 2.2.2.Develop and submita scope management plan for the project. The scope management plan is defined as the bunch of processes which are at a place for ensuring that a particular project must includes all kind of task required for the project success. The project scope for IVR project contains detail about the requirement of resources, stakeholder, scope statement, WBS, role and responsibilities. 21
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 2.2.3.Explain the processes and tools you usedto create the WBS and the scope management plan. Include details about how you involved stakeholders, how agreement was established, and what approvals you needed to sign off on the scope management plan. The WBS is a very essential tool used within project management that help in ensuring that all the tasks are assigned by without nay kind of error by the right person to whom it is assigned. For this current project for preparing the WBS the decomposition technique is used which help in dividing the deliverables in small and more manageable components until they get defined to the work package level. The decomposition firstly help in determining the deliverables, then structuring WBS. On other side the scope management plan is designed using techniques like data analysis and meeting. At the time of project initiation when planning about project is done the analysis of several area where this project execution will be helpful in analysed by gathering further data and discussing within meeting. This supported in preparing the scope plan. For both the activities the stakeholders are involve by organising a meeting and discussing over it. 2.2.4.Explain the governance considerationsthat impacted and influenced the development of WBS and scope management plan. The project governance is responsible for taking up the decision related with project and ensuring that each action went in right direction and remain appropriate as per the capital investment of organisation for project. This can influence the development of WBS in case the activities are going out of budget range, on other side the scope management plan can also be affected when it is not providing the benefit more then the capital invested after execution of project. 22
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Implementing and monitoring the scope management plan Describe at least one (1) instancewhere you became aware of a non- compliance with the scope management plan. Your answer must include details addressing the following questions: 2.2.5.Describe the formal change-control processes in place at your organisation that apply to this situation All thing were went well but there is a issue which found in process i.e. a part of system was hanging during the call process and repeating the same statements against and again which is irritating the customers on call. This was remain unnoticed by the employees of Aldi until a customer complaint about it. So, this require an instant change within system to avoid error for present and to get interrupt the system for future. So, the system again get upgraded in order to avoid the chance of noncompliance with the customer satisfaction and better experience scope with this IVR technology. 2.2.6.Describe the monitoring tools you used to identify and communicate this non-compliance? For determining this error in system the Product breakdown structure is used which help in dividing the whole project into small deliverable that help in identifying eth particular area which is in defect and creating this issue. For communicating it with the stakeholder the email are send to the internal stakeholders to make them aware and keep them active to take maximum calls while maintainance and external stakeholder are communicated with personal emails and website advertisements. 2.2.7.What was the impact of this non-compliance on the project (in terms of time, cost & quality constraints)? This issue has increased the cost of the project as it require more changes in the programs and also time is also get increased. 2.2.8.What changes were implemented as a result? For removing this error a part of program was changed y removing all the errors and bugs so that in future such error not takeplace again in project. 23
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 2.2.9.Submit evidence to support your response. Evidence may include: Emails Meeting minutes A completed change request document Changes you made to project documentation such as the WBS or scope management plan. Summary of what to submit for Task 2 Project scope management 1.A WBS for your project 2.A Scope Management Plan for your project 3.Written responses Tasks 2.2.3- 2.2.8 4.Workplace documents and evidence to address Tasks 2.2.5 - 2.2.8. 24
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Task 3 Project Risk Management Planning 2.3.1.Develop and submita risk management plan for the project. Answer: Risk management plan: It is a plan which helps in managing the risk in an appropriate way. It involves the elements like identification of risk, mapping impact v/s likelihood, risk response, owner to risk, measuring the threshold of risk etc. The risk management plan in relation to the IVR project is provided below: RiskLikeli hood Imp act Rati ng MitigationLike liho od Imp act Rati ng Contingency plan StatusOwner Health and safety risk 347Aproper examinationof riskcanbe doneto safety ofproject managers as if healthand safetypolicies arenot executed properly, then it may affects the healthof people. 223Toensurewell being along with safety of all the members associatedwith project,some strategiescan beexecutedas wellassafety measurescan be taken. Monito ring stage Event directo r Financial risk 216A provision can bemadein ordertomake sure availability ofacceptable amountof capital. 322Aloancanbe takenforshort termfrombank so as to mitigate theriskin relation to funds. ClosedFinanc e manag er Technolo gical risk 338.5Technological failure is one of thesignificant riskinproject. To mitigate this risk,itis necessaryfor 223Atechnology professional who is expert in handling technology appropriately canbehireso ClosedInform ation technol ogy manag er 25
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 project managerto provide training totechnicians inorderto makethem ableto operate technological instruments efficiently. thatat contingency time, risk can be mitigatingmore easily. 2.3.3.Explain the processes and toolsyou used to create the risk management plan. Include details about how you involved stakeholders, how agreement was reached and what approvals you needed to sign off on the risk management plan. Answer: The processes and tools which are used to develop risk management plan are brainstorming, root cause analysis, SWOTanalysis, risk assessment plan, risk register to prioritise risk, probability and impact matrix and risk quality data assessment. Apart from this, the risk management plan includes risk breakdown structure, confidence estimates, definitions and assumptions. The approval on managing the contingency funds, on project documentations and approval on the risk mitigation strategy and plan needs to be taken by the project manager. In introducing the IVR technology, the stakeholders are involved by make them aware about thesignificanceofintroducingthistechnologywithintheorganisation.Withthehelpof communicating the benefits of introducing technology, the agreements were reached. 2.3.4.Explain the governance considerationsthat impacted and influenced the development of risk management plan. Answer: The governance of compliance and risk is important in making decisions which set objectives of organisation and develop as well as monitor programs to accomplish them. It involves rules conventions, mechanism and processes through which decisions regarding risk are taken and executed. Apart from this, it is very necessary for the manager to ensure to follow governance while executing the project. The evidence must include: A risk analysis A completed risk register entry Additional evidence may include: Emails Meeting minutes A completed change request document 26
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Changes you made to project documentation such as the risk management plan. Summary of what to submit for Task 3 Project risk management 1.Risk management plan for your project 2.Written responses to Tasks 2.3.3 – 2.3.7 3.Workplace documents and evidence to address Tasks 2.3.5 – 2.3.7 including a risk analysis and a risk register entry 27
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Task 4 Stakeholder Meeting Purpose of assessment For this assessment you will be assessed on your interaction and communication skills as well as your contributions to each of the meeting agenda items. Your assessor will be looking to see that you demonstrate: clear communication active listening and questioning to clarify understanding collaboration and co-operation with others to achieve a shared goal This means that you will need to discuss each agenda item with your team, not just provide your opinion. (Note: In order for your assessor to observe your meeting you will need to video record it. If you are unable to do this in your workplace please contact your assessor for other options.) 2.4.1.Create and deliver a 15-minute presentationto your project stakeholders. Your presentation must cover the following: Essential information about the projectincluding project governance Explanation of theproject roles and responsibilities Scope of the project and key considerationsyou feel are important for your stakeholders to be aware of. Share your scope management plan and WBS Discuss relevant project risks and how they will be managed Answer: The relevant project risks involve financial risk, which can be mitigate through ensuring that a provision is made to make sure availability of adequate amount of funds. Apart from this, technological risk is the another risk which will be managed through providing training to employees regarding the ways to handle the technology effectively. 2.4.2.Following the presentation,facilitate a discussion to elicit feedback (on what you have presented). 2.4.3.Submit the presentation that you prepared and the video recording of the meeting. Submit the following for Task 4 Stakeholder meeting 1.Presentation addressing 2.4.1. 2.A video recording of the presentation and meeting.The video must demonstrate your participation and contribution. Ideally you will upload your video to YouTube (as a private video) and provide the link 28
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 in your submission. 29
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Task 5 Lesson Learned and Continuous Improvement For this task focus on project governance, scope management and risk management. 2.5.1.What lessons learned from previous projects did you take into consideration for this project? Answer: From the previous projects, I learn so many things which i did taken into consideration in this project. From the last project, I learnt that I have to manage time for each and every activity and try to perform them on specified time. This learning helped me a lot in this project as by the help of this, I was able to complete this project on specified time frame. Apart from this, due to ineffective communication, I faced difficulties in interacting with team members in an appropriate manner. This learning assist me in this project as I made use of effective communication tools so as to ensure that all the information can be communicated effectively among the team members and the project objectives can be accomplished. 2.5.2.Consider the outcomes from the stakeholder meeting, project outcomes, progress reporting, and your own observations; what lessons have you learned from this project in relation to governance, scope and risk management? What would be your recommendations for future projects? In your response to this question, consider the following: What worked? Were the processes in place sufficient for identifying, monitoring and controlling project scope and risk? Discuss and identify areas for improvement. Of the changes that were made (in relation to scope, risk management and governance) did they result in improved outcomes? What were they? Answer: While performing the project, there are so many things which went well and some are the things which did not went well. Due to proper management of time, I was able to perform each activity on specified time and complete the project successfully within the provided time frame. Apart from this, I also prioritize tasks as per their significance which highly supports me in carry out activities of project effectively. However, while working in the team I faced some difficulties initially as the nature and view point of all the team members are different, but after sometime all the team members work collectively and co-ordinately with each other. For the future projects, it is recommended that use of experience, skills and knowledge learnt this project must be applied so that effective outcomes can be gain. Summary of what to submit for Task 5 Lessons learned and continuous improvement 1.Written responses to Tasks 2.5.1 – 2.5.2 30
Project Management Practitioner BSBPMG511, 517, 520: Assessment Kit 1 of 4 Please submit all your responses to this assessment kit tomyAIM. -End of document- 31