logo

Project on Control at Damavand Combined Cycle Power Plant

8 Pages1626 Words62 Views
   

Added on  2020-05-11

Project on Control at Damavand Combined Cycle Power Plant

   Added on 2020-05-11

ShareRelated Documents
COMPETENCYDEMONSTRATION REPORTCareer Episode 2NAME
Project on Control at Damavand Combined Cycle Power Plant_1
CE 2.1 Project InformationName of the project: Planning and Project Control at Damavand Combined CyclePower PlantLocation of the project: Tehran, IranProject Duration: June 2009 to June 2010Organization: Damavand Combined Cycle Power PlantRole and Designation during the time: Planning and Project Control EngineerCE 2.2 Project BackgroundCE 2.2.1 Background of the organisationDamavand Combined Cycle Power Plant is one of the largest power plant in the countryof Iran. The power plant comprises of 12 gas station units. Each of the units had a powercapacity of 159 MW. In addition to this there are six streams units each with a working capacityof 160 MW. With the resources present the plant is able to produce a total of 2880 MW of poweroutput. The company also uses a V94.2 gas turbines and an E Type steam turbines. I wasselected to work for the IFC (Issued For Construction) package stage of the company. As therewere multiple activities in the scope of my work I had to review many of the project documentsbefore the starting of the project work. With my knowledge in big project, my supervisors hadasked me to look after the complete project.
Project on Control at Damavand Combined Cycle Power Plant_2
CE 2.2.2 Objectives developed for the projectFor the project completion and to meet the requirements of the project I had laid out thefollowing list of objectives:To schedule meetings with the department or the evaluation of the project plan andthe cost for the project.To report back the progress of the project.To properly manage the work flow and the documentation of the project in order tomeet the requirements and the effective use of resources for the project.To prepare notes to distribute among the supervisors regarding the progress of theproject.To prepare a project action plan to discuss about the work to be done.To upload the complete and updated project progress documentation on thecompany’s online portal. CE 2.2.3 My area of workI was responsible for the monitoring of the work flow and cost of the project. I had alsoworked on the management of the team of engineers working in the project. I had worked on thedevelopment of the IFC package for the project. The IFC package includes the project plan, costestimation and evaluation plan, schedule construction drawing, the procedures and theinstrumentation data sheets for the project. It also included the construction permits fromvarious sectors and the management of the corresponding memo of the project.
Project on Control at Damavand Combined Cycle Power Plant_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
(Solved ) Competency Demonstration Report
|8
|1627
|74

Continuing Professional Development | Docx
|3
|392
|59

Competency Demonstration Report- PDF
|8
|1635
|152

Document on Engineering Manager
|8
|1310
|58

Assignment on Career Profile
|7
|1334
|92

Competency Demonstration - Assignment Sample
|8
|1672
|35