COMPETENCYDEMONSTRATION REPORTCareer Episode 1NAME
Competency Demonstration Report- PDF_1
CE 1.1 Project InformationName of the project: Increase in the productivity of Tehran Cement Plant projectLocation of the project: IranProject Duration: November 2011 – December 2012Organization: Tosee Siloha CompanyRole and Designation during the time: Team MemberCE 1.2 Project BackgroundCE 1.2.1 Background of the organisationThe Tosee Siloha Company was set up in the year 2007. The company was set up as anEPC company. The company had working in the industrial production line in the field of wheatsilos, cement factory, power plant, cooling towers, distillation columns and various otherfactories. The company is a member of United Nations Industrial Development Organization(UNIDO). The factories are slow in the flow of adoption new technologies. This is due to theproblem off overhauling optimization processes and thus a cut is the profit is being ensured. TheTehran cement plant has been in operation for 25 years. Due to the high operational period thereis a rising concern about the safety and the environmental factors of the organisation. CE 1.2.2 Objectives developed for the projectFor the project I had set out the following objectives to provide the client with the bestquality of work:
Competency Demonstration Report- PDF_2
To review the documentation of the project, process flow diagrams and flow charts.To analyse the operation of the organisation closely. The remove any kind of bottleneck in the operational procedures. The review the existing environmental standards for the operation. To design the allocation time and budget for the project. To constantly monitor the progress of the project and to suggest any kind ofsuggestion for the same.To develop a custom workflow for the project for the use of the equipment’s andresources for the proper optimization of the cost and procedures. CE 1.2.3 My area of workFor the completion of the project I was completely involved in finding of better and newways for increasing the workflow and productivity. I was also responsible for finding a solutionto reduce the cost of production in this project because the cost of production needed to bereduced as the long term usage had increased the cost at a constant rate. I was also responsiblefor the scheduling of the project and the proper management of the workflow and the resources.In order to maintain the assigned schedule with workers, I have taken timely follow-up withthem. As I had a good writing skills, I helped in the documentation of the project report.
Competency Demonstration Report- PDF_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
(Solved ) Competency Demonstration Report
|8
|1627
|74

Project on Control at Damavand Combined Cycle Power Plant
|8
|1626
|62

Evaluation of Sorptivity and Water Absorption of Concrete
|9
|1413
|277

Continuing Professional Development | Docx
|3
|392
|59

Assignment on Career Profile
|7
|1334
|92

Document on Engineering Manager
|8
|1310
|58