EPM5600Principles of Project ManagementDue Diligence ReportName of UniversityStudent’s NameDated:
EPM5600 Principles of Project Management_1

EPM5600 Principles of Project Management Due Diligence ReportTable of ContentsIntroduction.................................................................................................................................................3Executive Summary.................................................................................................................................3Scope and Background of the Project......................................................................................................3Aims and objectives of the project..........................................................................................................3Critical appraisal of Due Diligence Report...................................................................................................4Marketing strategies for the event..........................................................................................................4Optimum venue, format, duration, number of speakers and broad mud-map of the sessions...............4Venue of the Master Class...................................................................................................................4Format of the Master Class..................................................................................................................5Duration, Speakers & broad mud-map of the Master Class................................................................5Timing associated with the planning, delivery and post implementation review of the event...............7Risks to be considered and the provision of a detailed risk matrix..........................................................8Conference Risk...................................................................................................................................8Venue Risk...........................................................................................................................................9Project Management Risks..................................................................................................................9Potential sponsorship arrangements and cost structuring for the event in terms of advertising packages, ticket pricing and offers for international delegates...............................................................9Sponsorship arrangements..................................................................................................................9Cost Structuring.................................................................................................................................10Costs associated with running the event and the provision of a cash-flow which links to the project programme............................................................................................................................................10Expected Expenditures:.....................................................................................................................10Expected Generation of Revenue:.....................................................................................................11Summary of Project Management Methodology shall be adopted if awarded.....................................11Initiation............................................................................................................................................11Planning.............................................................................................................................................11Execution...........................................................................................................................................12Closing...............................................................................................................................................12Conclusion.................................................................................................................................................12References.................................................................................................................................................132 | P a g e
EPM5600 Principles of Project Management_2

EPM5600 Principles of Project Management Due Diligence ReportIntroductionExecutive SummaryThis report[ CITATION Wai99 \l 1033 ] is prepared to provide few key findings of the due diligencereport[ CITATION Pin17 \l 1033 ] developed by SCPM (Southern Cross Project Management) forAAPMP (Australian Association of Project Management Professionals) project to conduct a twodays session for the Master Class at Perth, Australia on 9th and 10th September. The session isplanned to add value to the attendees and also to make positive contribution towardsdevelopment of project management industry. The session is targeting attendance of total 200 to 400 people of different sectors and categories.Separate ticket pricing is designed to attract early registration. The project expenses shall betaken care by the revenues generated from bookings and sponsorships. All different criteria andfeatures of the project are provided in this report starting from the marketing plan, projectmanagement approach, sponsorship arrangement, cost structuring, risk identifications andmitigations to closing of the project.Scope and Background of the ProjectAAPMP[ CITATION Aus171 \l 1033 ] is an individual body which works towards the positivecontribution to the project management industry. SCPM is the project management organizationfor conducting the two days Master Class at Perth by AAPMP. Total attendees shall be between200 to 400 people. The overall scope of the project starts from the arrival of the outsideattendees, their transportation, accommodation, tea, lunch, dinner, entertainment facilities and offcourse conducting the Master Class.Aims and objectives of the projectThe main aim and objective[CITATION Tho14 \l 1033 ] of the project is to conduct the Master Classevent of AAPMP with full satisfaction of AAPMP by increasing the number of members andconducting the session as per plan by receiving more and more sponsors and generating enoughrevenue to maintain the proper quality of the presentation.3 | P a g e
EPM5600 Principles of Project Management_3

EPM5600 Principles of Project Management Due Diligence ReportCritical appraisal of Due Diligence ReportMarketing strategies for the eventFor explaining the strategy SCPM had conceptualized to successfully market and advertise theoccasion, we shall divide the whole strategy in to main four stages like objectives and differentstages of marketing[ CITATION Mar17 \l 1033 ]: Objective: the main objective was to attract more and more participants for attending theMaster Class event being organized by SCPM for AAPMP. Second objective is to earnmore revenue from the event with maintaining positive cash flow from the beginning ofthe event itself. For gathering the maximum required number of attendees, SCPM shalluse all latest technology and old proven techniques of marketing.Target Market: SCPM has targeted all possible attendees like AAPMP’s members, non-members, corporate members, students, PMP professionals, non-PMP professionals andsoftware field executives from different sectors of industries like construction, defense,mining, engineering, risk management and many moreModern techniques of marketing: SCPM shall use a mix blend of all latest and oldtechniques of marketing like a website shall be developed solely for the use of AAPMP’sMaster class only and all required information by the attendees must be provided in thesite. Even sending the e-mail notifications to registered members and other delegatesshall also be done to market the event.Traditional techniques of marketing: SCPM shall use publications in newspaper, tradepublications, posters, banners display in public transports and universities as themarketing strategies.Optimum venue, format, duration, number of speakers and broad mud-map ofthe sessionsVenue of the Master ClassVenue: Crown Event & Conference Centre, Perth.The Centre is the entertainment complex located at banks of river Swan and isvery near to the national and international airports.4 | P a g e
EPM5600 Principles of Project Management_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Australian Institute of Management National Conference Event Due Diligence Report
|21
|959
|34

BUS 1101 | Principles of Project Management
|13
|1937
|34

Due Diligence Report for AIPM Event
|14
|3030
|80

Sample Due diligence report
|13
|2450
|22

Understanding and Assessing the Brisbane Small Business Expo 2019
|18
|4252
|43

Organizing event by AIPM (pdf)
|15
|758
|21