Gantt Chart and Work Breakdown Structure for NCL Company

   

Added on  2020-10-22

8 Pages1094 Words285 Views
 | 
 | 
 | 
GANT CHARTANDWORK BREAK DOWNSTRUCTURE
Gantt Chart and Work Breakdown Structure for NCL Company_1

Table of ContentsINTRODUCTION...........................................................................................................................1MAIN BODY...................................................................................................................................1P3 Produce a work break down structure and Gantt chart to provide time frames and stagesfor completion........................................................................................................................1P4 Small scale research by applying qualitative and quantitative research methodsappropriative for meeting project aims and objectives...........................................................3CONCLUSION................................................................................................................................5REFERENCES................................................................................................................................6
Gantt Chart and Work Breakdown Structure for NCL Company_2

INTRODUCTIONGantt chart is a project planning technique that is represented of the particular timing ofevery task which is required for complete project (Erol and et.al., 2012). Work break downstructure is a key which is helps to deliver project in manageable section. The report mainlyfocused on Gantt chart and work break down structure which is related to new project activitiesof NCL company.MAIN BODYP3 Produce a work break down structure and Gantt chart to provide time frames and stages forcompletionWork break down structure is a chart which represents critical work element that isknown as tasks. It is determinant to portray their relationships to each other and for wholeproject. It is presented in graphical way which can help to project manager for a result and it isdepended on different scenarios. This is providing help to ensure about the decent decision thatare made about whether or not to follow suggested process or changes. The following WBSshows relationship between individuals and team and also provides detailed information of NCLcompany (Zhang and Chiong, 2016). The aim of the project to increase marketing productivity.The aim is helpful to increase management skills of users and provide a clear image about thetarget is achieved. From the above work break down structure compete all activities according to newproject initiation. There is make proper project life cycle stages and the chart prepare on the basisof aim of the business, which is explained below - Main aim and objective research Shaping the appropriate plans 1
Gantt Chart and Work Breakdown Structure for NCL Company_3

End of preview

Want to access all the pages? Upload your documents or become a member.