logo

System Implementation Plan for Coast to Country Parks (CCP)

This assignment is about creating a System Implementation Plan for a caravan park club called Coast to Country Parks (CCP Club) in Australia.

7 Pages1713 Words346 Views
   

Added on  2022-11-24

About This Document

This document outlines the system implementation plan for Coast to Country Parks (CCP), including the system description, pre-implementation requirements, site-specific requirements, management of system implementation, major tasks, startup & cutover, training & documentation, implementation schedule, implementation staff & support, performance monitoring, back-off plan, and post-implementation plan and verification.

System Implementation Plan for Coast to Country Parks (CCP)

This assignment is about creating a System Implementation Plan for a caravan park club called Coast to Country Parks (CCP Club) in Australia.

   Added on 2022-11-24

ShareRelated Documents
I must emphasize that this is an implementation plan not a project. Yes, it can be
viewed as a project and certainly there are significant similarities. For example,
you will need to be aware of the objectives and major deliverables of the
implementation. However, the purpose of this plan is to detail how you are going
to develop and deploy the major deliverables of the system.
The Implementation Plan describes how the information system will be deployed,
installed and transitioned into an operational system. The plan contains an
overview of the system, a brief description of the major tasks involved in the
implementation, the personnel and any site-specific implementation
requirements. The plan is used for guidance during the Implementation Phase.
System Implementation Plan for Coast to Country Parks (CCP)_1
Melbourne Polytechnic
BIT 352 Systems Implementation
SYSTEMS IMPLEMENTATION PLAN
<PROJECT NAME>
TEAM MEMBER NAMES:
<NAME 1>
<NAME 2>
ETC
<DATE>
Note: the following document has been prepared based on the template for a Systems Implementation Plan at
Maryland County, USA (www. Maryland.gov)
System Implementation Plan for Coast to Country Parks (CCP)_2
Table of Contents
1 INTRODUCTION............................................................................................................ 4
2 System Description.........................................................................................................4
2.1 Outline of system components and deliverables.....................................................4
2.2 Pre-implementation requirements...........................................................................4
2.3 Site-specific requirements.......................................................................................4
3 MANAGEMENT of system implementation.....................................................................5
3.1 Description of Implementation.................................................................................5
3.2 Major Tasks............................................................................................................ 5
3.3 Startup & Cutover...................................................................................................6
3.4 Training & Documentation......................................................................................6
3.5 Implementation Schedule.......................................................................................6
4 IMPLEMENTATION staff & SUPPORT..........................................................................6
5 Performance Monitoring.................................................................................................6
6 Back-Off Plan.................................................................................................................6
7 Post-Implementation Plan and Verification.....................................................................6
BIT 352 CCP Systems Implementation Plan Page 3
System Implementation Plan for Coast to Country Parks (CCP)_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Systems Implementation Plan for Coast to Country Parks
|5
|1166
|85

Melbourne Polytechnic BIT 352 Systems Implementation.
|9
|2814
|60

System Implementation Plan
|6
|854
|33

Systems implementation & service management assignment
|7
|1457
|70

Report on The Implementation Plan
|7
|1828
|40

The VOIP system Implementation | Assignment
|19
|3940
|52