This assignment provides a comprehensive analysis of critical path activities and their impact on project duration and cost. It involves calculating the additional direct cost and total cost for different activities with varying durations and crashing scenarios. The solution presents a detailed calculation table and concludes that the critical path is 1-3-4-5, resulting in an additional direct cost of $10,500 and a total cost increase from $30,000 to $45,500.