INTRODUCTION Project management may be defined as a process which contains initiation, planning, monitoring, control and closure of work (Meredith, Mantel Jr and Shafer, 2017). The main motive of project management (PM) is to achieve specific goals within the predetermined criteria. However, in the context of project management manager faces challenge in relation to meeting criteria under given constraints. PM facilitates successful completion of project by placing emphasis on all the success criteria’s. It presents path which need to be followed by project manager for the accomplishment of project. This report will present the success of the project of QA Higher Educations (QAHE). This is higher education institution that has just completed refurbishment of their teaching rooms and computing labs as well as installing the latest technologies to ensure students and staff have excellent learning environment in London, Manchester and Birmingham. Institute is going to launch an event in the week of Freshers. So, this report will plan the event for institution. MAIN BODY 1. Sample Project Initiation document (PID) The mostimportant artifacts in PM is project initiation documentas it is also called as the foundation of theproject. PID isthe base of the project. It makes clear what is the important of project, what and when the project is to be delivered.Some important elements that project management are information of budget, duration, time, stakeholders, objectives etc. Budgetary Information: Budget implies for the financial framework which in turn includes forecasted income and expenses pertaining to the specific time frame. For successful competition of project, it is very important that project manager should have to prepare budget so that proper resources are available for project completion (Larson and Gray, 2017). In this present event, project manager have decided and forecast the budget is £50,000. Professor of the project has assigned the cost of each and every activities of the event like which task required what amount. Budget provides road map for the entire project. The event of QA Higher Education will be successful with effective formulation of budget. Time Scale:
This is another most essential part of the project. Time scale are the schedule for carrying the activities in estimated or set time period so that project does not face the issues regarding delays or any other complications. In addition to this it is span of time within which certain schedules to occur considered in relation to any wider period. This event of QA Higher Education institute will take time approximately one year (Harrison and Lock, 2017). Objectives: Objectives are the aim or purpose of the particular event or anything on which entire activities will be carried. There are some objectives which project management have expected for the successful event of QA Higher Education Institute. Following are the some objectives written below- ï‚·To attract people across UK and make them aware about this institute of learning. ï‚·To acquire maximum results with minimum efforts. ï‚·To increase the number of admissions. ï‚·To raises the standard of teaching and make people know about the quality of teaching university is providing to students. ï‚·To attract more and more investors for QA Higher Education Institute. ï‚·To encourage the employee engagement. ï‚·To make people know about the refurbishment of university. ï‚·To encourage the involvement of other stakeholders like professors, lecturer, teachers, sponsors and others. Approaches: Approaches are very important to achieve the objectives of the specific event or anything. Project managers has undertaken some approaches in order to achieve the objectives. Following are some approaches undertaken by project manager which are as following- Key Performance Indicators:Key performance indicators is another an important approach that is considered by project manager to measure the performance. KPI is an instrument that helps in evaluating the performance on regular basis so that project manager can take immediate actions on time (Turner, 2016).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Benchmarking: This is also one of the best approach to achieve the objectives as helps in comparing the performance of the event in right way. Project manager have set the target level to achieve the objective and by benchmarking the performance is measured in a time. Key Staff: Proper staffing is very important for successful implementation of the project because alone project manager cannot do all the activities of events. Here are the key staff members of the project are as follows- Event Planner:They are the first person who are appointed by project manager for completing the event (Kivilä, Martinsuo and Vuorinen, 2017). Event Planner will discuss each and everything with client such as location, food, budget, sitting areas, number of participants and others. Food and Beverage Vendor:These are the staff members who will manage the food and catering part of the event. They are accountable for food facilities, serving of water, drinks etc. Sound System Vendor:They are staff members who will manage the sound system like speakers, mike, stage, DJ sound and all other systems related to sound. Stakeholder Analysis: Stakeholders implies for the individuals having interest in concerned project either directlyorindirectly.Stakeholderanalysisisveryimportantformeetingtheneedsand expectations of stakeholder. It is a tool that helps to define the stakeholders. Following are the stakeholders of this present project: Name of Stakehold er Contact Person ImpactInfluence d What is important to the stakehold er? How could the stakehold er contribut e to the project? How could the stakehold er block the project Strategies for managing Stakehold er. Event Planner HighHighTimely payment Event planneris Event Cancellati Person who
said to be thestarter ofthe eventas allthe activities are planned and scheduled byevent planner. on.organise each and everything of the event by undertakin g the meeting with client. Through this event, event planner will generate huge amount of profit and gain recognised brand image StudentsHighMediumProper Informatio nand maximisin gthe engageme nt. Theycan bring more admission tothe university that ultimately Goingon Strike, lackof interest. They are the key stakeholde rs of the cited institute as they are
bring food resultfor the event. the main reason for refurbishm ent of university. Through this event their career developme nt will be among the greatest level as they will now get quality of education (Serra and Kunc, 2015). Employee s HighHighAllthe informatio n regarding theevent organisati onshould be communic Employee scan mangeall the activities indesired way. Goingon strike. Employee s include teachers, professors, lecturer and all other who are currently
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
ated.working in the university. This present event will raise the opportunit ies for further growth and developme nt in academic sector. OwnerHighLowSuccessful implement ationof event Communi catewith other stakeholde rsto express their support for reforms Cancellati onof event. The owner of the cited university will be highly benefited from this event as they will get more and more admission s (Harris,
2017).
2. Work-break Down Structure WBSis another significant aspect of PM that standout one of the crucial part of the project. WBS helps in segregating the complex project into simpler as well as manageable task (Li and Lu, 2016). In this present event, project manager have prepared WBS for the following reasons: ï‚·Readable and Accurate flow of project. ï‚·To assign the roles and responsibilities in strategic manner. ï‚·To forecast the risk, cost and time. ï‚·To make better understand of project to stakeholders. ï‚·To minimise the mistakes, duplication and errors during the activities. Task ModeTask NameDurationStartFinishPredecessors 1Project planning (Event requirement)237 daysWed 7/3/19Thu 5/28/20 2Establishment Needs5 daysWed 7/3/19Tue 7/9/19 3Integrating objectives of event4 daysWed 7/10/19Mon 7/15/192 4Location8 daysTue 7/16/19Thu 7/25/193 5Amenities render for9 daysFri 7/26/19Wed 8/7/194 6 Checking of sound system, stage, proper sitting arrangement and internet 5 daysThu 8/8/19Wed 8/14/193,4,5 7Services of Food & Beverage6 daysThu 8/8/19Thu 8/15/195 8Caretaker services4 daysThu 8/15/19Tue 8/20/196 9Visitors services8 daysFri 8/16/19Tue 8/27/197 10Visitor and attendance count4 daysWed 8/28/19Mon 9/2/198,9 11Date3 daysWed 8/28/19Fri 8/30/199 12Budget10 daysTue 9/3/19Mon 9/16/1910 13Selection of Venue12 daysTue 9/3/19Wed 9/18/1910,11 14Visiting Site5 daysThu 9/19/19Wed 9/25/1912,13 15Finalising site4 daysThu 9/26/19Tue 10/1/1914
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Gantt Chart is a chart in which series of horizontal lines shows the amount of work done or production completed in certain periods of time in respect to the amount planned for those periods. This present Gantt Chart is showing those activities which will be carried out in the event of QA High Education University.
13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
3. Risk Register Risk Registers is another element of project management that helps in analysing the risk involved in task (Mace and et.al., 2015). It helps in listing all the hazards associated with the project, its probability and actions to be taken to overcome the risk. Severity prior to mitigation Severity after mitigation RISKLikelih ood Impa ct Ratin g MitigationsLik elih ood Imp actRating Contingen cy Plans StatusOwner 1Poor Time Management 324 Scheduling of all the activities and task in time scale.339 By taking help from other department regarding fund. Analyse and observation of the information an figures Project manager 2Break Down of Server 428 Should have back- up plans and alternative management for controlling. 339 By checking the system effeciency. secure all such information for future use. Project manager and Electricians or Technicians Likelih ood Impa ct Ratin g MitigationsLik elih ood Imp actRating Contingen cy Plans StatusOwner 3Health Risk or Food Safety Concern 326 Food Quality should be ensure by project management before cooking.428 The ingredient of Food items are checked by project handler. Actions in progress Project Team members and Food Checker. 4Damage of Facilities (Fire) 224 Should have installation of fire extinguisher.326 Checking of fire extinguish er . In processProject management team lLikelih ood Impa ct Ratin g MitigationsLik elih ood Imp actRating Contingen cy Plans StatusOwner 5Loss of Equipments 236 Project manager should assigned roles to each staff member and make them accountable.339 Proper Checking and Monitorin g. In processproject manager 16
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
6Security Issues 236 Project manager should have security representative so that they are aware of schedule, logistic ad personnel involved. 248 System were Checked and insured by technicians . Actions to be preprepared in advanceme nt Project Manager 7Severe Weather Conditions Event manager should carried in hall or auditoriums so that the risk of rain fall and strong winds cannot affect the event. Space in auditorium ,. In processProject Manger and Weather control department. 8System FailureEvent manager should have generator or inverters for battery back ups. Furthermore, their should be technicians and electricians. System were Checked and insured by technicians . Actions to be preprepared in advanceme nt Project manager 9Mismanageme nt of Resources There should be proper allocation of resources and there must be resource handler. Proper check of resources. Actions in process Project manager 4.a. Importance of Strong Leadership Leadership plays an important role in driving the project to the success. Strong leadership is essential for project of organization because they provide direction for workers to do work with efficiently and effectively. Following quality are essential for strong leadership :- Communication:- This quality is very important for strong leadership because they have to give different types of answers to their staff and also listen to them (Blasch and Phoha, 2017). Leaders use effective and strong communication for moving the event forward and achieving next levels of success. Cooperation:- leadership is also important to establish coordination among members that they include in the event of QA higher education university. Through this cooperation, members do work together effectively and efficiently. 17
Motivation:- large number of workers and members that includes in event of university, so they need strong leadership because leaders motivate them to complete task and achieve goal and meet objective related to project. If leadership is missing from organization so many types of risk create after starting the event of QA higher education university because if worker can not get proper guidance and leading support, so they do work with their own wish and many risk may be raise like poor time management. Break down of server is also created because workers do not manage and set proper server of electric. They also do not set and install proper safety equipments and these all risk may create due to lack of leadership. 4.b. Methodologies METHODOLOGIESDESCRIPTIONSTRENGTHWEAKNESS Prince 2This approach use by managementof organization for proper scheduleoftaskand activitiesof operations. Itsmainstrengthis thatitisusefulin qualitymanagement for control to quality ofproject(Tomanek and Juricek, 2015). Thisapproachhas weaknessthatit consumemoretime anditcreatesvery complexities. WaterfallThisapproachrefers thataftercompletion ofonetasksthan management can start to next task of project. Waterfall approach has strength that it help to easily understand and also prevent and detect confusionbecause everythingclearin mindofmembersof project about task. This approach does not allowformuch reflection and revision (Mahadevan, Kettingerand Meservy, 2015).Due tothisapproachrisk anduncertainty increaseinproject management. AgileThismethodThis methodology hasAgilehasweakness 18
anticipates change and allows for much more flexibility (Edwards Jr, 2017). This method is widely used in project management. strengththatitfocus oncustomer satisfactionand adoptionofchanges bymanagementon regular basis. that itdonot establish propercoordination betweenworkflow becauseitdoesnot planeasilyand coordinate to team. Recommendation:- Agile is the best methodologies in project management because through this approach management majorly focus on customer satisfaction and allows for much more flexibility. It also allows changing frequently. It is also the best methodologies because it helps in implement changes. Project manager for QA Higher education university event use this methodology and focus on quality of event. So it focuses majorly on quality compare than other methods. CONCLUSION From the above report it has been concluded that proper management is very important for successful implementation of the project or event. Project initiation document is very essential for project completion as it helps to manage the budget, stakeholders, resources, time taken and all other elements of the project. Further, report also discussed the importance of work-break down structure as it aids in simplifying the complex task in simple one. Project has also concluded the risk register that identify the risk involved in the event and further actions was also taken for mitigating the risk.Leadership plays an important role in driving the project to the success of the event. 19
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
REFERENCES Books and Journals Blasch,E.andPhoha,S.,2017.DynamicData-DrivenApplicationsSystems(DDDAS) Concepts in Signal Processing.Journal of Signal Processing Systems. 88(2). pp.203-204. EdwardsJr,T.V.,2017.APPLICATIONOFAGILEMETHODOLOGYTO ELECTROMECHANICALDESIGN:ACASESTUDY.InProceedingsofthe InternationalAnnualConferenceoftheAmericanSocietyforEngineering Management.(pp. 1-5). American Society for Engineering Management (ASEM). Harris, E., 2017.Strategic project risk appraisal and management. Routledge. Harrison,F.andLock,D.,2017.Advancedprojectmanagement:astructuredapproach. Routledge. Kivilä, J., Martinsuo, M. and Vuorinen, L., 2017. Sustainable project management through projectcontrolininfrastructureprojects.InternationalJournalofProject Management,35(6), pp.1167-1183. Larson, E.W. and Gray, C.F., 2017.Project management: The managerial process. McGraw-Hill Education. Li, D. and Lu, M., 2016. Automated generation of work breakdown structure and project network modelforearthworksprojectplanning:aflownetwork-basedoptimization approach.Journal of Construction Engineering and Management,143(1), p.04016086. Mace, G.M and et.al., 2015. Towards a risk register for natural capital.Journal of Applied Ecology,52(3), pp.641-653. Mahadevan, L., Kettinger, W.J. and Meservy, T.O., 2015. Running on Hybrid: Control Changes when Introducing an Agile Methodology in a Traditional" Waterfall" System Development Environment.CAIS. 36. p.5. Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2017.Project management: a managerial approach. John Wiley & Sons. 20
Serra, C.E.M. and Kunc, M., 2015. Benefits realisation management and its influence on project success and on the execution of business strategies.International Journal of Project Management,33(1), pp.53-66. Tomanek, M. and Juricek, J., 2015. Project risk management model based on PRINCE2 and SCRUM frameworks.arXiv preprint arXiv:1502.03595. Turner, R., 2016.Gower handbook of project management. Routledge. 21