ITC505 ICT Project Management Assessment-3 Charter Student Name: Student ID:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents Part one: MOV.................................................................................................................................3 Part Two: Scope...............................................................................................................................6 Part Three: Work Breakdown Structure........................................................................................10 Part Four: Project Risk Analysis and Plan.....................................................................................12 Part Five: Quality Management Plan.............................................................................................17 Part Six: Closure and Evaluation step...........................................................................................19 References......................................................................................................................................22 List of Figures Figure 1- WBS...............................................................................................................................10 Figure 2: Gantt Chart.....................................................................................................................11 List of Tables Table 1- Area of Impact...................................................................................................................3 Table 2- Stakeholders Expectation..................................................................................................4 Table 3- Timeframe developed for MOV........................................................................................5 Table 4- Out scope items.................................................................................................................6 Table 5- In scope items....................................................................................................................6 Table 6- Description of participant work.........................................................................................8 Table 7-Project Risks.....................................................................................................................12 Table 8- Risk assigned to members...............................................................................................16 Table 9- Evaluation of project.......................................................................................................20 Table 10- Reviews of managers of Globex...................................................................................21
Part one: MOV Area of impact According to their ranking area of impact is been displayed. Table1- Area of Impact FinancialCustomerStrategySocialOperational Thissystem restricts people fromentering RALSifthey don’t have the ticketswith them. Thissystem allowsthe customersor userstoeasily andquickly booktickets fromanywhere in the world. AsRALSand Globex will not beshifting towardsanew marketmaking strategic field of least priority. Thissystemis veryattractive andgathers user’sattention which increases itssocial impression. Chancesof occurringerror are less as this systemis completely automatic.This systemalso helpsin managing crowd easily. Types of values: Faster:RALS is presently facing issues in dealing with crowds. They desire a system which can help easily in managing and dealing with the crowd. This system provides online ticket generation through which users can book tickets online by sitting anywhere and eliminating those big queues. This process is much faster and quicker and is less hectic. Better:Due to this system of booking tickets online, it makes the process automatic that helps in managing the whole crowd and can easily operate them. The system provides the opportunity to book tickets directly from sitting anywhere in the world. Cheaper:This system helps in reducing the cost of labors or employees involved as this is completed computer-based system. Appropriate metric: Targets To implement the online booking system for tickets few things are commonly targeted which are listed as:
Tickets are equipped with a barcode. Tickets are purchased through online systems. Categorization of tickets on a day basis. Details like outlet, offline/online purchase and gate number are described in tickets. Stakeholders Expectation Table2- Stakeholders Expectation List of StakeholdersStakeholders Expectation System analystIssues faced must be presented in detail manner. Project managerCoordination between Globex and RALS organisation must be positive. Web developerResources must be made available when needed. Computer technicianRALS committee corporates properly. System architectResources are available in given time. Business analystThey need to properly communicate with Globex organisation and RALS committee. Globex corporationThey can also access the generated revenue. VisitorsThey buy tickets from an online system of booking. RALS committeeDuring the peak time also crowd can be managed (Crump, 2015). Target that is quantitative They expect 83% of the increase in profit earned within 6 months. The expectation of customer retention increment by 90%. They can easily control 90% of the coming crowd. It can maximize the interest return up to 8.9% within 5 months.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Timeframe developed for MOV Table3- Timeframe developed for MOV S. No.Task NameTask Duration 1Conceptualization and Initialization of online booking system of tickets. 6 days 2RALS presentation2 days 3Controlandexecutesplansforgenerationsystemof online booking system. 5 days 4Online booking system of tickets is implemented.11 days 5Online booking system for tickets is installed.5 days 6TrainingofRALSstaffregardingtheonlineticket booking system. 1 day 7Project closure1 day 8Online ticket booking system evaluation1 day 9Total32 days MOV Summary The system of online booking of tickets used to help Globex organization and RALS committee. From this system, customers can purchase ticketsonline providing them with a platform for easily booking tickets. This system can be accessed through user handy devices like mobile, tablets and notebooks. Tickets can be printed by visitors that have a barcode on it. This system allows the RALS committee to track the whole crowd so as to manage them. This system reduces the threat of cheats as through this only that person can access inside which holds proper tickets. It even allows Globex track easily the revenue record created by the crowd (Fisher, 2018).
Part Two: Scope Scope RALS community is presently facing issues in controlling the crowd. Most of the crowd is getting away from the gate of the entrance as the revenue result is not properly generated and because of this RALS gates are dealing with delays. As a result of this, the process of sale has a slowdown in RALS due to long and waiting queue. To overcome such issues RALS decided to come up with a new and user-friendly platform for booking tickets. The system generated provides few functions as well as features that are listed below: This system generates tickets along with QR codes or barcodes printed on them and they are quickly and easily generated. Visitors can online register tickets making it user-friendly. Through the internet, visitors can easily purchase the tickets from anywhere in the world. This system is developed in a way that it can be easily accessed through any devices like mobiles or tablets. Out scope and In scope items Out scope items Table4- Out scope items S. No.Name of Item 1NFC enabled cards 2Database 3NFC reader In scope items Table5- In scope items Deliverables Things which RALS will deliverare listed below: Casesdevelopedforbusiness S. No.Name of Item 1QR code reader 2Barcode reader 3Mobiles 4Printers 5Computers 6Laptops
Plan developed for budget Plans for management of project Work breakdown structure Project schedules Project milestones Responsibilities and roles Plans created for development of system System user documentation Test plans (Parvez, 2013). Criteria for acceptance Some criteria need to be fulfilled by Globex and RALS organization to accept this system of generating or booking tickets online. Some acceptance criterion is described below: The system must able to be accessed by user-friendly devices like mobiles, notebooks, and tablets. The system should be easily operated online. This system must help the user to generate and book tickets online in an easy and simple way. Revenue must be accessed easily by both Globex as well as RALS committee. Resources List Resources which are required to make applications for booking online tickets are given below: Peoples or participants involved: To develop the system of booking tickets online some qualified persons are required which will help in developing the system at lower cost and taking less time or within provided time. To complete or finish the project successfully some persons like system analyst, business analyst, computer technicians and project managers are needed for the creation of the project. The list of such peoples are provided below: Table6- Description of participant work S. No.ParticipantsDescription of their work 1WebThey are programmers who build an application for this
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Developersystem and through them, visitors can directly access system very easily and they even create accessibility of system with portable devices like tablets, mobiles, and notebook. 2System Analyst Theyhelpinprovidingorutilisingthetechnology efficiently and effectively. By performing cost analysis system can be made incorporated into any organisation. 3Project Manager They play a very crucial role from planning to execution as they are simply responding to lead and guide the project. They perform various steps that comprise of planning, managing, and execution in a proper way. 4Business Analyst Their responsibility is to analyse business domain for the betterment of organisation. They even integrate different businessmodelhavingnewtechnologiesjustby accessing it. 5Computer Technician They maintain and control all computers and servers installedandprovidedbyVirtuconandtheyeven configurenewlyplacedhardwareandupdatesome software packages. 6System Architecture They develop or create a system for an organisation so that all requirements of an organisation can be easily fulfilled. The design system after dividing it into several small pieces (Sun, 2018). Technology: Various tools and technologies are used while developing the system. These techniques can help build a system of online booking tickets which simplifies the life of visitors of RALS. Tools used for creating the system efficiently and on time are computers, notepad++, printers, mobiles, tablets and Studio Cloud Software. Facilities: Many facilities need to be provided by online booking system of tickets and to make it run smoothly they must have better linking between all software and hardware. Some hardware parts are installed in RALS premises. Other: Resources like training is needed to be provided by Virtucon to staff members. Some computer technicians are hired to train RALS staff members regarding the working of the new system. This training helps the staff members to effectively operate the whole system and eliminates the cause of developing human errors.
Part Three: Work Breakdown Structure Figure1- WBS
Figure2: Gantt Chart
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Part Four: Project Risk Analysis and Plan Assumptions regarding the project During the construction of project different assumptions are made which are listed below: The information gathered from Globex need to be right or correct. RALS staff members must have the knowledge of basic computers which will help them operate the online booking system in an easier way. At testing time, minimum 2 stakeholders need to be present just to verify that the requirements of RALS organization are fulfilled or met properly. Project Risks Risks can be classified in five possible ways: Table7-Project Risks Ranksof Risk Name of RiskRisk Description 1Schedule RiskThis risk occurs when project task is not addressed properly,leadingtotheriskofscheduleslipping. ScheduleslippingaffectsGlobexorganisations economy and it might even lead to project failure. 2RequirementRelated Risk This risk occurs due to the continuous change taking place in the project. If requirements are not properly defined it may lead to many issues related to project or its failure. 3RiskofProject management This risk occurs commonly because of priority change in the present system. Sometimes same resources are requiredinthegivenprojectandsuchthingsare capable enough to stop project progress. 4Technology Related RiskThis risk occurs commonly due to functionality and performance of project but this risk only affects if project implementation goes hard. 5Customer Related RiskThe customer always comes up with demands of new and updated things with which they can make their life easy and this is the reason their decision cycle is slow enough. They even don’t accept the system until all their needs are being fulfilled.
Risk Analysis No: R44 Rank: 1 Risk: Scheduling is not proper Details: Task schedule is completely disturbed because of no knowledge regarding newly added functionality continuously in online ticket booking system. Classification: Schedule Root Cause: No access to proper information regarding the newly developed functions required in the system of online booking tickets. Effects: If the generated schedule is not updated when the project may result in slip from its predictable dates. Responses to Risk: To reduce the task overlapping business analyst have to schedule some task and they must be updated regularly. Owner of Risk: Project Manager Probability and Impact: High Status of Risk: Every week project manager needs to conduct meeting with its members. No: R45 Rank: 2 Risk: Requirement of Resources Details: Due to lack of resources present, online booking of tickets can lead to delay in time and will not be completed on time. Classification: Risk related to requirements Root Cause: The same type of resources is used by many organisations leading to decreases in its availability. Effects: According to the system architecture analysis shortage of resources directly affects the project processes.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Responses to Risk: System Analyst plans all project related requirement in a systematic way. It presented all resource requirements at the time of project completion. Owner of Risk: System Analyst Probability and Impact: High Status of Risk: Meeting needs to be conducted with the whole team and project manager. No: R46 Rank: 3 Risk: Priority gets change regularly Details: The priorities are getting changed regularly as the functionality of the online booking tickets system is continuously increasing. Classification: Risk relates to Project Management Root Cause: These sudden occurring changes in the priority can lead to disturbance of the project management. Effects: Business analyst encounters that the project management is not going in a better way and the priorities are getting changed very fast. Responses to Risk: To acknowledge the project related processes and all recent updates included in projects business analyst need to organize a various meeting of members so as to ensure project completion within the allotted time. It also manages the hurdles faced by the member at the time of completion. Owner of Risk:Project Manager Probability and Impact: Medium Status of Risk: The changes which occurred in the system are finalized by the project manager. No: R47 Rank: 4 Risk: Technology selection Details: Due to continuously increase in functionality of online booking of tickets system this hinders the system completely.
Classification: Risk of technology Root Cause: Fulfillment of demands of users cannot be done by these provided technologies as they are not enough to satisfy their needs related to the online booking system. Effects: System analyst and architect encounter the risk occurring in performing the task on given technology. Responses of Risk: Some modifications need to be done by system analyst and architect in the current technologies to complete the given project in required time. Owner of Risk:System Architect Probability and Impact: High Status of Risk: A meeting will be conducted bySystem Architect with project manager regarding the modification made in the technology used in online booking system of tickets. No: R48 Rank: 5 Risk: Visitors Details: The system can’t satisfy the users of online booking ticket system as it creates difficulties for them to understand system’s user interface. Classification: Risk related to Customer Root Cause: The requirements and needs of the user are not clearly achieved including the basic knowledge of this system. Effects: Proper information is not provided to the visitors regarding the booking system like the location where they can book tickets. Responses of Risk: Project manager knows the whole about the system and manages the members by coordinating with them, listening to their problems and resolving them. Owner of Risk: Project Manager Probability: Low Impact: High Status: Issues are discussed by project managers with system analyst to resolve the task easily (Watt, 2018).
Risk is assigned to different members Table8- Risk assigned to members S. No. Risk nameMember Name 1Schedule RiskMember 3 2Risk Related RequirementMember 1 3Risk related to Project management Member 4 4Technology related riskMember 2 5Customer-related RiskMember 3
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Part Five: Quality Management Plan Statement for Team’s objective The aim of my team is to establish a quality based system to meet all requirements of RALS organization in a systematic way. For achieving this all members of team coordinated very well with both Virtucon and Globex organization. To smoothen the work it is distributed between various members of the team so that the work gets completed in minimum time and lesser efforts. During the creation of this system for RALS organization various meeting are organized between Globex and RALS staff members. In such meeting, problems are discussed regarding the managing of the crowd by RALS committee. After these discussions related to problems, some MOV and action plans are generated. Later these things are presented and demonstrated among RALS committee and once it gets approval the work related to the project gets started. Cost of all resources are taken and also demanded for approval. The system is developed with Virtucon having proper coordination with them. When the creation is completed the system is tested so satisfy RALS or Globex Committee.Whenthe systemistested properlyitfinallygets implemented within the Globex premises by taking their permission. Finally, the online booking of tickets system is created and it fulfills all the needs of the organisation. Validations It majorly includes the methods of controlling the quality of the system. Validation includes the activities that are project associated. This helps to ensure whether the developed system is fulfilling the requirements or needs of the client or not. Online booking of ticket system is examined on the basis of workers reliability, compatibility and capacity of the user. Few steps involved in rules of validation: Unit testing: In this test, the online booking of ticket system is checked whether it is working properly or not and if they are meeting all the needs of RALS committee. Integration testing: In this test online booking of ticket system is checked whether the system is working, in the same way, it is required to work or within the guidelines, it needs to work.
System Acceptance: In this phase, a checklist is made consisting all approved and completed validations and it assures that the system is working with its best potential. If it clears the test, it gets accepted by both RALS and Globex organisation. User approval: In this test online booking of ticket system is checked whether the system is meeting the requirements or needs of users or not. It only gets confirmed when all needs of users are met or fulfilled (Softwaretestinghelp, 2017). Verifications Various activities are performed and some out of them need organisation verification. The whole verification process must confirm the acceptance of the organisation regarding the following project. By proper discussions and meetings all project related things are completed. When completion takes place the process finally goes for verification which includes three major steps: Technical review: In this phase, all technical parts of an online booking of ticket system are verified. It assures that all requirements of the organisation are met or fulfilled within the allotted time and met the organisation standards. Business reviews: After verification is performed depending on functionality and scope of the project, testing of the project takes place mainly for the purpose it is intended. This step ensures the project will meet some business reviews also. Managerialreviews:TheymetallrequirementsofmanagersofRALSandGlobex organisation. All manager related needs are met by this system (software testing class, 2013).
Part Six: Closure and Evaluation step Annotated Bibliography Bibliography 1 Law, R., & Leung, R. (2000). A study of airlines’ online reservation services on the Internet. Journal of Travel Research, 39(2), 202-211. In this journal, author discusses online reservation services and factors affecting the time for using online reservation services. The author explains the additional benefits it provides to the users and the efficiency of evaluating attributes. It explains the methodologies are chosen and findings. The author explains the extra benefits granted to users of internet and information of ordering online. It also explains the factors that affect the time and additional facilities provided on web sites. It provides the discussion and future research. Bibliography 2 Maymounkov, P., & Mazieres, D. (2002, March). Kademlia: A peer-to-peer information system based on the xor metric. In International Workshop on Peer-to-Peer Systems (pp. 53-65). Springer, Berlin, Heidelberg. In this journal, author discusses about the outsourcing and offshoring of risks and the investment of imitation and international experiences of risk management. It also explains the data, research methods and findings and even variables that are dependent and explanatory along with control variables. It later discusses implications, limitations and future research of risks. Bibliography 3 Slovic, P., Finucane, M. L., Peters, E., & Macgregor, D. G. Risk as analysis and risk as feelings: some thoughts about affect, reason, risk, and rationality. Risk Anal 2004; 24: 311–22. In thisjournal, author discusses the risk analysis and risk as feelings. They explain the important effects of system and compares experiential and analytic systems. The author explains the benefits and risks of judgments. It explains the probability and its insensitivity and judgments. It provides with experiential system failures and how risks can be managed. It explains how risk analysis can benefit experiential thinkings and the threats caused by risks.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Closure checklist The procedure of closure begins when it is ensured that all stakeholder requirements are met completely. To validate and verify the project process with proper meetings with stakeholders. All documentation and deliverables are acquired in a proper way. The RALS committee handles all system related technical documentation. After system implementation, it needs to be regularly maintained at a regular time interval of time. Evaluation of project Analysis of performances of each member of team Table9- Evaluation of project S. No.Member of Team Rating or Reviews 1Member 1Management- Good Contribution- Moderate Performance- Excellent Coordination- Good 2Member 2Management- Good Contribution- Moderate Performance- Excellent Coordination- Good 3Member 3Management- Good Contribution- Moderate Performance- Excellent Coordination- Good 4Member 4Management- Good Contribution- Moderate Performance- Excellent Coordination- Good
Reviews of managers of Globex Table10- Reviews of managers of Globex S. No.Factors Involved Ratings (out of 10) 1Schedule8 2Delivery7.5 3Objectives9 4Cost8 Evaluation of success of project- MOV Initially, MOV of the project is defined to generate results after 3, 9 and 16 months after the system is installed in Globex premises. After few months this system of online booking of tickets will gain the user’s attention and will attract a crowd. After 16 months of implementation, user receives returns. After project completion, Globex and RALS organisation managers test the system and judge that the needs are accomplished or not. These systems are accepted only when requirements are met.
References Crump,K.(2015).HowtoManageStakeholderExpectations.Retrievedfrom https://www.liquidplanner.com/blog/project-management-challenge-series-manage- stakeholder-expectations/ Fisher, T., (2018). What's an MOV File and How Do You Open One. Retrieved from https://www.lifewire.com/what-is-an-mov-file-2622779 Law, R., & Leung, R. (2000). A study of airlines’ online reservation services on the Internet. Journal of Travel Research, 39(2), 202-211. Maymounkov, P., & Mazieres, D. (2002, March). Kademlia: A peer-to-peer information system based on the xor metric. In International Workshop on Peer-to-Peer Systems (pp. 53- 65). Springer, Berlin, Heidelberg. Parvez.(2013).ScopeDefinitionofOnlineTicketingSystem.Retrievedfrom https://www.slideshare.net/ShahriarPrince/scope-definition-of-online-ticketing-system Sites, (2018). Chapter 2- Objective of the Project - Bus Ticket booking system - ONLINE BUSTICKETBOOKINGSYSTEMPROJECTSYNOPSISANDFINALREPORT. Retrievedfromhttps://sites.google.com/site/onlineticketbookingmcabca/objective-of-the- project Slovic, P., Finucane, M. L., Peters, E., & Macgregor, D. G. Risk as analysis and risk as feelings: some thoughts about affect, reason, risk, and rationality. Risk Anal 2004; 24: 311– 22. Software Testing Class. (2013) Difference between Verification and Validation. Retrieved from http://www.softwaretestingclass.com/difference-between-verification-and-validation/ Softwaretestinghelp.(2017).WhatisVerificationandValidation?Retrievedfrom http://www.softwaretestinghelp.com/what-is-verification-and-validation/ Sun,L.,(2018).TheRoleofStakeholdersinYourBusiness.Retrievedfrom http://www.businessdictionary.com/article/601/the-role-of-stakeholders-in-your-business/ Watt, A., (2018). Risk Management Planning Project Management. Opentextbc. Retrieved fromhttps://opentextbc.ca/projectmanagement/chapter/chapter-16-risk-management- planning-project-management