Career Episode 2:
Introduction
2.1 I worked with Mech Power Generator PTE LTD from 28th
September 2010 till date. Mech Power has a leading
manufacturer in design, assembly, testing, installation,
commissioning, sale and service of diesel power powered
generator sets in Singapore. It also supplies the power
generation industry in the Asia Pacific region. It has achieved
several key certifications.
In Mech Power Generator, I worked as a project engineer. My
job scope requires me to lead projects and coordinate it
accordingly until it is completed, and ready for the final
handover.
Background
2.2 I have done many projects in my company. One of the
projects I would like to highlight about is the Terminal 4
Changi Airport project. It was different from my previous
projects PE 1.2. It contains of eight indoor synchronizing
generators with power grid supply, five underground storage
tanks with the different capacities and fuel pump systems.
2.3 The project was accomplished in 2 years. My job scope was
to schedule a plan, control manpower, track the equipment
delivery, production team, installation of the site work, and
ensured that the work done is aligned to the contract. I also
had to evaluate and ensure that our work complies with the
Singapore standard SS535:2007 code of practice that
involves installation, operation, maintenance, performance
Project Engineer at Mech Power Generator PTE LTD_1

and construction requirements of mains failure standby
generator systems.
Organization Chart
Project Engineer at Mech Power Generator PTE LTD_2

Personal Work Place Activity:
2.4 Project requires a person with a strong analytical mind,
resourceful, capability in handing project, inter personal skill,
and effective communication, with highly innovation.
Normally starting stage of the project, I studied carefully
about the terms of work scope with the tender drawing and
contract documents. PE 1.1 I understood the electrical and
mechanical design from the technical specification. PE 1.4I
developed the design team to clearly knows the customer
requirement, layout drawing to match with the approved
documents. PE 3.3 Make it work promptly I arranged a kick off
meeting while we get the order confirmation from the
customer.PE 3.2
2.5 For terminal 4 Changi Airport project required
synchronization to a power grid. During this process, I learnt
about the new electrical circuit drawing. I also attended a
training, to learn how to operate the generator of the
synchronization controller. PE 1.2, PE 2.4 This project consists of
two transformer supply to the building with emergency
source supply from UPS and Generator back up.
2.6 Project was very critical and very sensitive. Our system
supports the runway lightings power backup. If there is no
power supply in Transformer 1, we will change over to
Transformer 2. But if both transformers are not functioning,
our generator automatically starts. This supports the
emergency power sources. Once the power resumes, our
system will synchronize with the power grid supply, and
transfer the load to the power grid.
2.7 Our electrical panel are fabricated on our factory. I
coordinate with consultant and customer by propose the
Project Engineer at Mech Power Generator PTE LTD_3