COMPETENCYDEMONSTRATION REPORTCareer Episode 3
Competency Demonstration Report (Doc)_1
CE 3.1 Project InformationName of the project: Automatic Pneumatic Ramming MachineLocation of the project: [PLEASE FILL]Project Duration: [PLEASE FILL]Organization: [PLEASE FILL]Role and Designation during the time: Team LeaderCE 3.2 Project BackgroundCE 3.2.1 Characteristics of the projectI considered moulding industries as one of the target market for the third projectconsidering the development of an automatic pneumatic ramming machine that can be utilizedby these industries for the production. These industries use sand ramping for casting the desiredproducts however, human errors can lead to certain deformations and defective products can bedeveloped. I proposed an automated system that will be helpful in evenly distributing the sand onthe cast material and eliminate the defects in casting. I analysed that approximately 10% of thecastings are being rejected within the industries due to human errors and uneven distribution ofthe sands during casting. Thus, the developed system will be helpful in eliminating these 10%defective items and allowing the industries to produce product without any defects. I selected theidea of fabricating the “PNEUMATIC RAMMER” that can be operated pneumatically those willbe applicable in evenly distributing the sand packaging during moulding.
Competency Demonstration Report (Doc)_2
CE 3.2.2 Objectives developed for the projectAs a lead role, it was my duty to manage the project objectives and motivate every teammember towards the successful delivery of the project and gaining better production and output.I developed the following set of objectives for motivating and concentring the team towards the:To develop an innovative product that can gain the attention of the industriesTo develop an automated pneumatic ramming machine that can allow evendistribution of the sands for mouldingTo follow the specified timeline and accomplish all the operational activitieswithin the expected deadlineTo increase the efficiency of moulding industries and eliminating the defectsproduced because of the human errorsTo manage the budget of the proposed system minimum as much possibleCE 3.2.3 My area of workI managed the responsibilities and roles of every team member associated with me duringthe execution of this project. I developed a communication plan that allows every individual tocommunicate on the related topics and raise if there is any concern, and others had to proposecertain solutions and every individual had to agree on the proposed solution. I had to design thepneumatic cylinder and solenoid valve for developing the sophisticated model that can allowefficient and effective moulding. I proposed the entire work progress and depicted them in thefollowing block diagram and assigned different jobs to every individual associated with thisproject:
Competency Demonstration Report (Doc)_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Summary Statement of Professional Engineer
|9
|2171
|215

Development of Hydraulic Rod Bending
|7
|1670
|121

Modelling and Impacts of Tolerance over Manufacturing Procedure
|9
|1667
|29

Design, Cad Modeling & Fabrication of Automatic Hammering Machine - Career Episode 1
|11
|1685
|424

Competency Demonstration- Report
|8
|1596
|88

Competency Demonstration Report Solved
|8
|1668
|113