PPMP20008: Assessment- Work Breakdown Structure and Work Package

Added on -2020-02-24

| 6 pages| 904 words| 75 views

Trusted by 2+ million users,
1000+ happy students everyday

Showing pages 1 to 3 of 6 pages

Running head: OUR LANGUAGE IS IMPORTANTCase Study: Our language is importantName of the StudentName of the UniversityAuthor’s Note
OUR LANGUAGE IS IMPORTANT1Table of ContentsWork Package..................................................................................................................................2Work package 1: Theme selection...............................................................................................2Bibliography....................................................................................................................................7
OUR LANGUAGE IS IMPORTANT2 Work Package Work package 1: Theme selectionName of the projectInstalling signage in CQU universitycampus ID of the work package1.1.1Name of the work package Gathering designsDescription of the work package The designs are mainly gathered for theproject so that proper design must be selectedfor installing the signage board within thecampus of CQU. It is identified that theindigenous committee of SET wants topromote the various indigenous language thathave lost its existence. It is found thatinstallation of signage board by utilizingproper design would be helpful in creatingcultural awareness as well as reflecting theimportance of indigenous language amongstudents of CQU university.Authorized person It is identified that the project manager is theperson who is mainly authorized for this workpackage.The project manager will engage in collectingvarious design for the signage board so thatthey can analyze as well as identify properdesign for the signage board which will besuitable for promoting different indigenouslanguage within the CQU campus.It is identified that the project manager plays asignificant role in identifying the suitabledesign by analyzing various types of designfrom the gathered design. Procedures, processes and techniquesIt is found that different types of processesof decision making are utilized.Use case generally elaborates workprocedures for requirement gatheringPromotion related procedures such asadvertisement is also utilized for gettingreview on the design in order to selectproper collection off design for thesignage boardRequirement related traceability matrix is

Found this document preview useful?

You are reading a preview
Upload your documents to download
or
Become a Desklib member to get accesss

Premium

$45

Q&A Library Access

Chat support

12

Document Unlocks

4

Answer Unlocks

Students who viewed this