logo

Project Initiation, Planning and Execuution TABLE OF CONTENTS INTRODUCTION 1

14 Pages2807 Words473 Views
   

Added on  2020-10-22

About This Document

Personal reflection 5 CONLCUSION 5 REFERENCES 7 Appendix 8 INTRODUCTION To plan and initiate the project for relocating at different place for a family requires effective planning and operational requirements that are supposed to be well organised and scheduled. Overview In creation of the plan for Kelly and Jeff on the basis of their relocation to Perth from Queensland, there have been preparation of tasks and scheduling them accordingly to complete this relocation tasks within time frame. Preparing a milestone plans and task list (WBS) There

Project Initiation, Planning and Execuution TABLE OF CONTENTS INTRODUCTION 1

   Added on 2020-10-22

ShareRelated Documents
PROJECT INNITIATION,PLANNING AND EXECUTION
Project Initiation, Planning and Execuution TABLE OF CONTENTS INTRODUCTION 1_1
TABLE OF CONTENTSINTRODUCTION...........................................................................................................................1MAIN BODY..................................................................................................................................11. Overview..................................................................................................................................12. Preparing a milestone plans and task list (WBS).....................................................................13. A milestone plan......................................................................................................................14. List of tasks..............................................................................................................................35. Gantt Chart...............................................................................................................................46. Adjustments made to schedule................................................................................................47. Personal reflection...................................................................................................................5CONLCUSION................................................................................................................................5REFERENCES................................................................................................................................7Appendix..........................................................................................................................................8
Project Initiation, Planning and Execuution TABLE OF CONTENTS INTRODUCTION 1_2
INTRODUCTIONTo plan and initiate the project for relocating at different place for a family requires effectiveplanning and operational requirements that are supposed to be well organised and scheduled. Inthe present report, there will be discussion based on planning the tasks, managing the operationsas per their requirement and costs implied in activities. Therefore, managing such operations willhelp Jeff and Kelly to have systematic and well managed list of work.MAIN BODY1. OverviewIn creation of the plan for Kelly and Jeff on the basis of their relocation to Perth fromQueensland, there have been preparation of tasks and scheduling them accordingly to completethis relocation tasks within time frame. Jeff and Kelly have two kids and a dog along withluggage they have planned to switch the cities for having a new job opportunity in securing aposition as a marketing director. Moreover, the have wished to vacant the current property andwill settle in new rental place at Perth.2. Preparing a milestone plans and task list (WBS)There have been preparation of various milestone and task lists on the basis of variousassumptions. However, Jeff and Kelly have set various targets and objectives which will beachieved by them as per analysing the required time and supportive activities to be done (CreateWBS codes, 2019). There is various millstone which have been targeted by them such as listed inAppendix:3. A milestone planBy considering the tasks and operations which are required to be followed by Jeff and Kellyon which the total relocation is being set. There have been preparation of small tasks andbenchmarks that will be effective in managing the entire process to make adequate process ofshifting the home at new location. However, the creation of small targets of milestones will beeffective for controlling costs as well as managing operations as per deadline and required timeperiod.Planning for Switching Job:In this process Jeff makes plans for switching the job as per applying on new position at newlocation, receiving interview date, giving interview and receiving the offer letter for appointment1
Project Initiation, Planning and Execuution TABLE OF CONTENTS INTRODUCTION 1_3
has been ascertained to have better planning. However, it consists of entire tasks and processwhich are being divided in several sub tasks of the report.Planning for Relocation:This part of the project has stated surveying the location, resources as per various taskswhich are to be considered to have better analysis over Jeff and Kelly’s responsibilities.Therefore, during this process there are various tasks associated with this entire program.Transportation of dog, goods and family to the new location are the prime concerns. Along withthis, analysing such offers from various industries in transporting to the new location have beenconsidered to have adequate ascertainment of the operational practices.Preparing the shifting process:In this process there have been preparation of seve4ral plans which have enable Jeff andKelly in analysing tee costs as well as the material to be shifted in the new location. They havedecided to sell out their several extra materials which does not worth to carry in new location.Therefore, the transportation will cost them higher instead of the actual costs of such products.They have decided to sell out extra furniture, and household material which will bring themsome gains as well as reduces number of items to be shifted in the new location.Shifting to Perth:This the tasks which defines post process after shifting to Perth. Thus, in this process therehave been payment of various transportation costs which includes, dog, goods and family(Stettina and et.al., 2018). Along with this, receiving all of these sources and relocating in thenew house have been categorised in several tasks.Unpacking:This part of project has defined the furnishing of the new house as well as unpacking ofgoods (Kerzner, 2018). The arrangement of all the things at right place have ben tasked and willrespond to Kelly in managing the house according to daily requirements.Admission in school:Enrolment of kids in the new schools required several small tasks which are being respondsto Jeff and Kelly’s attention. Thus, they will be bringing to interview at the schools on the basisof prepared lists of best schools. Therefore, admitting them in new school, analysing their dailymode of transportation such as buses, taxies etc for school. These are the tasks which have beenmilestone as per admission of kids.2
Project Initiation, Planning and Execuution TABLE OF CONTENTS INTRODUCTION 1_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Initiation, Planning and Execution
|17
|3272
|405

Project Management: Relocation of Family
|17
|3067
|417

Relocation of family from Sunshine Coast to Perth
|16
|2356
|201

Project Management for Relocation of Family to Perth
|13
|2363
|260

Project Initiation, Planning and Execution - Desklib
|16
|2365
|467

Project Management
|13
|2073
|445