Project Management for Soliloquy Publishing Ltd.
VerifiedAdded on 2023/06/13
|12
|1676
|240
AI Summary
This project management report outlines the implementation of Streaming Media Player System (SMPS) for Soliloquy Publishing Ltd. It includes project scope, assumptions, constraints, success criteria, budget, schedule, methodology, governance, roles and responsibilities, and sign-off section.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: PROJECT MANAGEMENT
Topic- Soliloquy Publishing Ltd.
Name of the Student
Name of the University
Author’s Note
Topic- Soliloquy Publishing Ltd.
Name of the Student
Name of the University
Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1
PROJECT MANAGEMENT
Table of Contents
1. Project title, project authorization date, start date and finish date.........................................2
2. Project manager’s name and contact details..........................................................................2
3. Description of vision, mission and goals/objectives for the organization.............................2
4. Project scope/objectives, assumptions and constraints.........................................................3
5. Success criteria for the project..............................................................................................4
7. Summary schedule................................................................................................................6
8. Summary of the project management methodology..............................................................7
9. Governance...........................................................................................................................7
10. Roles and responsibilities.....................................................................................................7
11. Sign-off section for all stakeholder......................................................................................8
Bibliography.............................................................................................................................10
PROJECT MANAGEMENT
Table of Contents
1. Project title, project authorization date, start date and finish date.........................................2
2. Project manager’s name and contact details..........................................................................2
3. Description of vision, mission and goals/objectives for the organization.............................2
4. Project scope/objectives, assumptions and constraints.........................................................3
5. Success criteria for the project..............................................................................................4
7. Summary schedule................................................................................................................6
8. Summary of the project management methodology..............................................................7
9. Governance...........................................................................................................................7
10. Roles and responsibilities.....................................................................................................7
11. Sign-off section for all stakeholder......................................................................................8
Bibliography.............................................................................................................................10
2
PROJECT MANAGEMENT
1. Project title, project authorization date, start date and finish date
Project title
The title of the project is “Implementation of Streaming Media Player System
(SMPS)”.
Project authorization date
The authorization date for the project “implementation of Streaming Media Player
System (SMPS)” is 23-04-2018.
Start date
The start date of the project “implementation of Streaming Media Player System
(SMPS)” is 23-04-2018.
Finish date
The finish date of the project “implementation of Streaming Media Player System
(SMPS)” is 05-10-2018”
2. Project manager’s name and contact details
Name of the project manager Contact details
Alfred Watson Alred123@mail.com
3. Description of vision, mission and goals/objectives for the organization
Mission
The mission statement of the project is prose, dialogue and facts which are the maters
on which Soliloquy act.
PROJECT MANAGEMENT
1. Project title, project authorization date, start date and finish date
Project title
The title of the project is “Implementation of Streaming Media Player System
(SMPS)”.
Project authorization date
The authorization date for the project “implementation of Streaming Media Player
System (SMPS)” is 23-04-2018.
Start date
The start date of the project “implementation of Streaming Media Player System
(SMPS)” is 23-04-2018.
Finish date
The finish date of the project “implementation of Streaming Media Player System
(SMPS)” is 05-10-2018”
2. Project manager’s name and contact details
Name of the project manager Contact details
Alfred Watson Alred123@mail.com
3. Description of vision, mission and goals/objectives for the organization
Mission
The mission statement of the project is prose, dialogue and facts which are the maters
on which Soliloquy act.
3
PROJECT MANAGEMENT
Vision
The main vision of the organization is to help the organization in directing as well as
managing future growth.
Objectives of the organization
The objectives of the organization include:
To grow profit as well as revenue by 5% on each year for the next five years
To improve the visibility by enhancing the visit by 50percent after 2 years.
To enhance the organization financial returns.
4. Project scope/objectives, assumptions and constraints
Project scope
The scope of the project include:
To implementation of Streaming Media Player System (SMPS)
To provide proper functions including product purchase, movie excerpts, listening to
excepts, read-on line functionality as well as loyalty club
To finish the project within the expected due date that is 05-10-2018
Project assumptions
The assumptions which are made within the project “implementation of Streaming
Media Player System (SMPS)” is provided below:
Budget: It is assumed that the project “implementation of Streaming Media Player
System (SMPS)” would be finished within the budget $700,000.00
PROJECT MANAGEMENT
Vision
The main vision of the organization is to help the organization in directing as well as
managing future growth.
Objectives of the organization
The objectives of the organization include:
To grow profit as well as revenue by 5% on each year for the next five years
To improve the visibility by enhancing the visit by 50percent after 2 years.
To enhance the organization financial returns.
4. Project scope/objectives, assumptions and constraints
Project scope
The scope of the project include:
To implementation of Streaming Media Player System (SMPS)
To provide proper functions including product purchase, movie excerpts, listening to
excepts, read-on line functionality as well as loyalty club
To finish the project within the expected due date that is 05-10-2018
Project assumptions
The assumptions which are made within the project “implementation of Streaming
Media Player System (SMPS)” is provided below:
Budget: It is assumed that the project “implementation of Streaming Media Player
System (SMPS)” would be finished within the budget $700,000.00
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4
PROJECT MANAGEMENT
Time: The project manager expected that the time that is needed for executing the
project is around 6 months.
Scope: It is expected that the project of Streaming Media Player System (SMPS)
implementation would follow the project scope for finishing the project within the expected
time and budget.
Project constraints
The constraints of the project is provided below:
Time: It is quite essential to finish the project within the expected time that is 6
month otherwise the cost that is related with the project will also increase which will creates
financial pressure on the organization.
Budget: It is expected that is very much necessary to finish the project
“implementation of Streaming Media Player System (SMPS)” within the expected budget
that is $700,000 otherwise the project managers of the project will face financial challenges
as well as issues.
Scope: It is necessary to follow the project scope in order to finish the project within
the expected budget and time. If the project scope is not properly followed then it will be
quite challenging to finish the project within the expected due date.
5. Success criteria for the project
The success criteria of the project include:
Achieves objectives: If the project meets the objectives and helps in providing
facility including product purchase, movie excerpts, listening to excepts, read-on line
functionality as well as loyalty club, then it is considered to be successful.
PROJECT MANAGEMENT
Time: The project manager expected that the time that is needed for executing the
project is around 6 months.
Scope: It is expected that the project of Streaming Media Player System (SMPS)
implementation would follow the project scope for finishing the project within the expected
time and budget.
Project constraints
The constraints of the project is provided below:
Time: It is quite essential to finish the project within the expected time that is 6
month otherwise the cost that is related with the project will also increase which will creates
financial pressure on the organization.
Budget: It is expected that is very much necessary to finish the project
“implementation of Streaming Media Player System (SMPS)” within the expected budget
that is $700,000 otherwise the project managers of the project will face financial challenges
as well as issues.
Scope: It is necessary to follow the project scope in order to finish the project within
the expected budget and time. If the project scope is not properly followed then it will be
quite challenging to finish the project within the expected due date.
5. Success criteria for the project
The success criteria of the project include:
Achieves objectives: If the project meets the objectives and helps in providing
facility including product purchase, movie excerpts, listening to excepts, read-on line
functionality as well as loyalty club, then it is considered to be successful.
5
PROJECT MANAGEMENT
Budget: If the entire implementation gets completed within the budget of $700,000
then the project is considered to be successful.
Follows scope: If the entire project is executed after following the project scope then
it considered to be successful.
Time: If the entire project is finished within the expected due date then the project is
considered to be successful.
6. Summary budget
It is assumed that the project “implementation of Streaming Media Player System
(SMPS)” will be successfully finished within the budget of around $700, 00. The cost for
each of the project activities is provided below:
PROJECT MANAGEMENT
Budget: If the entire implementation gets completed within the budget of $700,000
then the project is considered to be successful.
Follows scope: If the entire project is executed after following the project scope then
it considered to be successful.
Time: If the entire project is finished within the expected due date then the project is
considered to be successful.
6. Summary budget
It is assumed that the project “implementation of Streaming Media Player System
(SMPS)” will be successfully finished within the budget of around $700, 00. The cost for
each of the project activities is provided below:
6
PROJECT MANAGEMENT
Figure 1: Summary budget
(Source: Created by author)
7. Summary schedule
As per the schedule that is provided below, it is assumed that the project will be
successfully finished within 6 month. The table below reflects on the time that is required for
finishing each of the project activities.
PROJECT MANAGEMENT
Figure 1: Summary budget
(Source: Created by author)
7. Summary schedule
As per the schedule that is provided below, it is assumed that the project will be
successfully finished within 6 month. The table below reflects on the time that is required for
finishing each of the project activities.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7
PROJECT MANAGEMENT
Figure 2: Schedule
(Source: Created by author)
8. Summary of the project management methodology
The project management methodology that is utilized in this project is “Agile
SCRUM”. This methodology is mainly utilized in this project for providing appropriate
customer satisfaction and for lowering the production cost of the system. It is identified that
PROJECT MANAGEMENT
Figure 2: Schedule
(Source: Created by author)
8. Summary of the project management methodology
The project management methodology that is utilized in this project is “Agile
SCRUM”. This methodology is mainly utilized in this project for providing appropriate
customer satisfaction and for lowering the production cost of the system. It is identified that
8
PROJECT MANAGEMENT
with the help of this methodology, the organization can be able to enhance both
communication as well as collaboration (Vedsmand, Kielgast & Cooper, 2016). This
methodology generally assist in giving proper visibility on tasks for each of the project team
member for tracking progress of the project and for providing proper allocation of resources.
It is found that proper focus on the collaboration generally leads to happier as well as more
productive team of the project.
9. Governance
The project governance mainly includes the following:
Adoption of appropriate project life cycle governance including approval gates at
which project viability is approved
Fostering appropriate culture of improvement
Providing opportunity of making providing views during meetings to the project
team members
Recording as well as communicating the project decisions as per the project
approval gates.
10. Roles and responsibilities
Role of project stakeholders Responsibilities of stakeholders
Project manager The project manager have the responsibility
of managing the various phases of the
project starting from initiation till closure
phase.
PROJECT MANAGEMENT
with the help of this methodology, the organization can be able to enhance both
communication as well as collaboration (Vedsmand, Kielgast & Cooper, 2016). This
methodology generally assist in giving proper visibility on tasks for each of the project team
member for tracking progress of the project and for providing proper allocation of resources.
It is found that proper focus on the collaboration generally leads to happier as well as more
productive team of the project.
9. Governance
The project governance mainly includes the following:
Adoption of appropriate project life cycle governance including approval gates at
which project viability is approved
Fostering appropriate culture of improvement
Providing opportunity of making providing views during meetings to the project
team members
Recording as well as communicating the project decisions as per the project
approval gates.
10. Roles and responsibilities
Role of project stakeholders Responsibilities of stakeholders
Project manager The project manager have the responsibility
of managing the various phases of the
project starting from initiation till closure
phase.
9
PROJECT MANAGEMENT
Project steering committee The project steering committee is the
person who mainly works as a supporter as
well as promoter within the project.
Tester The tester mainly helps is responsible of
testing the various project design scenarios.
Technical engineer The technical engineer mainly helps in
implementing the system successfully.
Human resource manager The human resource manager engages in
managing the project resources as well as
helps in recruiting the project team
members.
Risk analyst Risk analyst is the person who mainly
identifies the risks as well as challenges that
are associated with the project.
11. Sign-off section for all stakeholder
The entire project ““implementation of Streaming Media Player System (SMPS)” is
approved by the stakeholders of the project and any further changes within the project needs
to be approved by the higher authority of the organization.
Signature: Date: <please fill>
Print Name: Alfred
Title: Project manager
PROJECT MANAGEMENT
Project steering committee The project steering committee is the
person who mainly works as a supporter as
well as promoter within the project.
Tester The tester mainly helps is responsible of
testing the various project design scenarios.
Technical engineer The technical engineer mainly helps in
implementing the system successfully.
Human resource manager The human resource manager engages in
managing the project resources as well as
helps in recruiting the project team
members.
Risk analyst Risk analyst is the person who mainly
identifies the risks as well as challenges that
are associated with the project.
11. Sign-off section for all stakeholder
The entire project ““implementation of Streaming Media Player System (SMPS)” is
approved by the stakeholders of the project and any further changes within the project needs
to be approved by the higher authority of the organization.
Signature: Date: <please fill>
Print Name: Alfred
Title: Project manager
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10
PROJECT MANAGEMENT
Signature: Date: <please fill>
Print Name: Michael
Title: Technical engineer
Signature: Date: <please fill>
Print Name: Joffrey
Title: Developer
Signature: Date: <please fill>
Print Name: Robb
Title: Project steering committee
Signature: Date: <please fill>
Print Name: Carla
Title: Financial manager
PROJECT MANAGEMENT
Signature: Date: <please fill>
Print Name: Michael
Title: Technical engineer
Signature: Date: <please fill>
Print Name: Joffrey
Title: Developer
Signature: Date: <please fill>
Print Name: Robb
Title: Project steering committee
Signature: Date: <please fill>
Print Name: Carla
Title: Financial manager
11
PROJECT MANAGEMENT
Bibliography
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology
and project success in different project governance contexts. International Journal of
Project Management, 33(6), 1377-1392.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to
measuring and monitoring project performance. John Wiley & Sons.
Riol, H., & Thuillier, D. (2015). Project management for academic research projects:
balancing structure and flexibility. International Journal of Project Organisation and
Management, 7(3), 251-269.
Snyder, C. S. (2014). A guide to the project management body of knowledge: PMBOK (®)
guide. Project Management Institute: Newtown Square, PA, USA.
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), 278-290.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D.
(2015). Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Vedsmand, T., Kielgast, S., & Cooper, R. G. (2016). How new Agile-Scrum methods lead to
faster and better innovation.
PROJECT MANAGEMENT
Bibliography
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology
and project success in different project governance contexts. International Journal of
Project Management, 33(6), 1377-1392.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to
measuring and monitoring project performance. John Wiley & Sons.
Riol, H., & Thuillier, D. (2015). Project management for academic research projects:
balancing structure and flexibility. International Journal of Project Organisation and
Management, 7(3), 251-269.
Snyder, C. S. (2014). A guide to the project management body of knowledge: PMBOK (®)
guide. Project Management Institute: Newtown Square, PA, USA.
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), 278-290.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D.
(2015). Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Vedsmand, T., Kielgast, S., & Cooper, R. G. (2016). How new Agile-Scrum methods lead to
faster and better innovation.
1 out of 12
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.