Scope of work The scope of work is provided below: Replacement of the entire Bridge “Darling Harbour Swing” To replace swing span, superstructure, federal system as well as operator house To finish both electrical as well as mechanical overhaul To finish the bridge construction project within 10 days in which the bridge remains closed for minimizing the impact of project construction on the public. It is identified that the construction of the project will be initiated on 11 th September 2018 and it will be successfully gets completed within 5