This report discusses the development of an information system for the ABC organization, a car inventory business. It includes a problem description, system capabilities, expected business benefits, project approval factors, development cost, annual operating cost, cost benefit analysis, risk and feasibility analysis, and project environment. The report concludes that the project is feasible and beneficial for the organization.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: SYSTEM ANALYSIS AND DESIGN
System Analysis and Design
Name of the Student:
Name of the Student:
Author Note

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
SYSTEM ANALYSIS AND DESIGN
Table of Contents
Identify the problem...................................................................................................................2
Problem Description...............................................................................................................2
System Capabilities................................................................................................................2
Expected Business benefits....................................................................................................2
Quantify project approval factors...............................................................................................3
Project Schedule.....................................................................................................................3
Development cost of the project............................................................................................4
Annual Operating cost of the project.....................................................................................6
Cost benefit Analysis.............................................................................................................7
Estimated Annual Benefits.....................................................................................................7
Perform a Risk and Feasibility Analysis....................................................................................8
Organizational Risks and Feasibility.....................................................................................8
Technological risks and feasibility.........................................................................................8
Resource Risks and Feasibility..............................................................................................9
Schedule Risks and Feasibility...............................................................................................9
Establish the Project Environment.............................................................................................9
Planning and Monitoring activities........................................................................................9
Work Environment...............................................................................................................13
Process and the Procedures to be used.................................................................................14
Work Breakdown Structure..................................................................................................14
Gantt Chart...........................................................................................................................15
Document Page
2
SYSTEM ANALYSIS AND DESIGN
Bibliography.............................................................................................................................16
Document Page
3
SYSTEM ANALYSIS AND DESIGN
Identify the problem
The report is concerned with the project of development of an information system for
the ABC organization. The report includes the details of the development of the project and
the different type of feasibility study that would justify the project.
Problem Description
The ABC company which is being considered is a car inventory business who sells
tools and parts of the cars for rectifying them. All the process of storing the details of the
finances and client details are done in the organization manually in the current situation.
Hence the process of serving the clients and maintain efficiency in the business procedures
are hampered to a great extent.
System Capabilities
The system which is to be designed would be able to perform the tasks of automating
the process of the business of the organization. The system should be able to perform the
tasks of storing the details of the inventory system into a database so that the staffs of the
organization can easily update their customers about the product and also make an efficient
financial structure with much of a fuss.
Expected Business benefits
After the implementation of the system the organization would be able to speed up
their procedures and reduce the overall response time for their customers. The system would
also benefit the organization financially and help them to achieve a higher level of customer
satisfaction.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4
SYSTEM ANALYSIS AND DESIGN
Quantify project approval factors
Project Schedule
The Schedule of the project is provided below:
Task Name Duration Start Finish
Inventory Storage System 47 days Mon 03-09-18 Tue 06-11-18
Project Initiation 5 days Mon 03-09-18 Fri 07-09-18
Meeting with the clients 1 day Mon 03-09-18 Mon 03-09-18
Present process Analysis 2 days Tue 04-09-18 Wed 05-09-18
Identification of the areas for
improvement
1 day Thu 06-09-18 Thu 06-09-18
Requirement Analysis 1 day Fri 07-09-18 Fri 07-09-18
Project Planning 2 days Mon 10-09-18 Tue 11-09-18
project schedule 1 day Mon 10-09-18 Mon 10-09-18
Budget Allocation 1 day Tue 11-09-18 Tue 11-09-18
Project Design 7 days Wed 12-09-18 Thu 20-09-18
Hardware and Software Procurement 2 days Wed 12-09-18 Thu 13-09-18
Hardware and Software Set Up 3 days Fri 14-09-18 Tue 18-09-18
Wireframe designs 2 days Wed 19-09-18 Thu 20-09-18
Project Implementation 21 days Fri 21-09-18 Fri 19-10-18
Database Setup 5 days Fri 21-09-18 Thu 27-09-18
Document Page
5
SYSTEM ANALYSIS AND DESIGN
Front end designing 7 days Fri 28-09-18 Mon 08-10-18
Back end Design 5 days Tue 09-10-18 Mon 15-10-18
Project Integration 4 days Tue 16-10-18 Fri 19-10-18
Project Testing 6 days Mon 22-10-18 Mon 29-10-18
System Testing 2 days Mon 22-10-18 Tue 23-10-18
Upgrade the system 4 days Wed 24-10-18 Mon 29-10-18
Project Delivery 4 days Tue 30-10-18 Fri 02-11-18
Preparation of Project Manual 2 days Tue 30-10-18 Wed 31-10-18
Delivery of the Project Documentation 1 day Thu 01-11-18 Thu 01-11-18
Uploading the project on the domain of
the Organization
1 day Fri 02-11-18 Fri 02-11-18
Maintenance 2 days Mon 05-11-18 Tue 06-11-18
Assignment of the personnel to the
project
1 day Mon 05-11-18 Mon 05-11-18
Scheduling project maintenance 1 day Tue 06-11-18 Tue 06-11-18
Development cost of the project
The development cost of the project is provided below:
Task Name Cost
Document Page
6
SYSTEM ANALYSIS AND DESIGN
Inventory Storage System $37,160.00
Project Initiation $1,920.00
Meeting with the clients $320.00
Present process Analysis $640.00
Identification of the areas for improvement $480.00
Requirement Analysis $480.00
Project Planning $640.00
project schedule $320.00
Budget Allocation $320.00
Project Design $26,600.00
Hardware and Software Procurement $13,360.00
Hardware and Software Set Up $12,600.00
Wireframe designs $640.00
Project Implementation $4,120.00
Database Setup $1,000.00
Front end designing $840.00
Back end Design $1,000.00
Project Integration $1,280.00

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
SYSTEM ANALYSIS AND DESIGN
Project Testing $1,760.00
System Testing $320.00
Upgrade the system $1,440.00
Project Delivery $1,480.00
Preparation of Project Manual $640.00
Delivery of the Project Documentation $320.00
Uploading the project on the domain of the
Organization
$520.00
Maintenance $640.00
Assignment of the personnel to the project $320.00
Scheduling project maintenance $320.00
Annual Operating cost of the project
The Annual Operating Cost of the project is around $2000 dollars. The detail of the
resource Sheet is provided below:
Resource Name Type Material Label Initials Group Max. Units Std. Rate
Project Manager Work P 100% $40.00/hr
System analyst Work S 100% $20.00/hr
Database Designer Work D 100% $15.00/hr
Document Page
8
SYSTEM ANALYSIS AND DESIGN
Server machine Material S $7,000.00
System Developer Work S 100% $25.00/hr
Software Platform Material S $5,000.00
System Designer Work S 100% $15.00/hr
Cost benefit Analysis
The Cost benefit analysis of the project is provided below:
Cost benefit analysis for Infromation System
Year 0 Year 1 Year 2 Year 3 Year 4 Year 5
Annual benefits $0 $10,000 $10,000 $10,000 $10,000 $10,000
Development cost ($37,160) $0 $0 $0 $0 $0
Annual Operating Cost $0 ($2,000) ($2,000) ($2,000) ($2,000) ($2,000)
Net benefit/costs $20,000 $0 $0 $0 $0 $0
Net cash flow ($17,160) $8,000 $8,000 $8,000 $8,000 $8,000
Discount factors
Discount rate 5%
Year Index 0 1 2 3 4 5
Discount factor 1 0.95 0.91 0.86 0.82 0.78
Discounted flows
Cost ($37,160) ($1,905) ($1,814) ($1,728) ($1,645) ($1,567)
Benefit $20,000 $9,524 $9,070 $8,638 $8,227 $7,835
Net ($17,160) $7,619 $7,256 $6,911 $6,582 $6,268
Cumulative ($17,160) ($9,541) ($2,285) $4,626 $11,208 $17,476
Net present value $17,476
ROI 19%
Payback Analysis
Years Months
1 16
Payback Period in Years 2.31
Document Page
9
SYSTEM ANALYSIS AND DESIGN
Estimated Annual Benefits
The annual benefits from the project is estimated at $10,000. These benefits are
obtained from the staff’s salaries and the increased sales rate for the organization. A detailed
report is provided below:
Estimated Annual Benefits
Annual Income
Benefits of the increased sales $ 6,t000.00
Employees Salary Benefits $ 4,000.00
Total $ 10,000.00
Perform a Risk and Feasibility Analysis
Organizational Risks and Feasibility
The organization deals with a car parts business, and hence the organization requires
an efficient storage system that would be helpful for them in storing the major details of the
product catalogues and the information about the incomes and expenses of the business. The
current procedures in the organization requires the work to be done manually. And this takes
up a lot of time. Hence, the introduction of the information system for the organization is
very beneficial for the business of the ABC Organization. However, there is risk involved
with the introduction of the system to the organization and that is their employees would be
losing out on their position if the procedures in the organization arte automated. However, on
the other side this would be reducing the costs of the organization and the organization would
an overall benefit from the system hence the project is feasible for the organization.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10
SYSTEM ANALYSIS AND DESIGN
Technological risks and feasibility
The introduction of the inventory system would be technically feasible for the
o0regnication as this would help the organization to speed up their processes and reduce the
response time for their clients to a great extent. The procedures within the organization would
be automated with the help of the IT services. However, there is chance of employees facing
difficulty in performing their tasks in the system, although this can be mitigated easily by
providing proper training to the employees and also submitting the documentation and the
manual of the project to the office so that the employees can understand the details of project
and work efficiently on the system.
Resource Risks and Feasibility
The main risk with the resources is that the project does not follow the iterative model
and hence the risk of the resources falling short can take place. This affect the progress of the
project and stall the further progress of the project. There might be situations where are the
project has to be stopped due to lack of resources. Additionally, there can be situation where
the resource allocated are more than abundant for the project then there is chance of
unnecessary expenses for the organization. However, this can be mitigated with proper
planning and budget analysis and according to the cost benefit analysis and project schedule
the project is economically feasible and hence, the risks regarding the resources can also be
addressed easily.
Schedule Risks and Feasibility
The project schedule is created according to the plan for the implementation. One of
the risk involved with the schedule of the project is that the project has been estimated to be
completed in around 47 days and if the project takes longer than 47 days then the cost
estimation done with respect to the schedule of the project, and hence any alteration in the
Document Page
11
SYSTEM ANALYSIS AND DESIGN
schedule would also change the estimation in budget of the project. However efficient
planning would result in the feasibility of the schedule of the project.
Establish the Project Environment
Planning and Monitoring activities
The details of the hardware and the software required for the development of the
system has been described in the tables provide below. The table below provides the details
of the hardware for the system:
Hardware Requirement for the system
Location
Computer Name or
Hardware
Description
Manuf
acture
r
Model
CPU
speed
R
A
M
Ha
rd
Dri
ve
Siz
e
Serial
Numbe
r
Repla
cemen
t Cost
Manage
ment
Project
Manag
er
Needs the
system for
assigning the
tasks HP
Comp
aq
6200
2120(
3.30G
Hz)
4
G
B
30
0G
B
MXL2
0728
6B
$650.
00
Admini
strator
Monitoring the
systems
1
G
25
0G
STY23
1DS
$200.
00
Document Page
12
SYSTEM ANALYSIS AND DESIGN
B B
Staff
Employ
ees HP
Comp
aq
dx740
0
2.33
GHz
5
G
B
50
0G
B
M8DS
A24D
$1,00
0.00
System
Develo
per HP
Comp
aq
dx740
0
2.33
GHz
5
G
B
50
0G
B
M8DS
A24D
$1,00
0.00
Databa
se
Design
er HP
Comp
aq
dx740
0
2.33
GHz
5
G
B
50
0G
B
M8DS
A24D
$1,00
0.00
System
Analyst HP
Comp
aq
dx740
0
2.33
GHz
5
G
B
50
0G
B
M8DS
A24D
$1,00
0.00
Server
s
Server
Room
Sever
administrator
HP Comp
aq
4
G
30
0G
MLSE
232W
$2,70

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13
SYSTEM ANALYSIS AND DESIGN
Prolia
nt
ML350 B B S 0.00
Server
Room
Database
Administrator HP
Comp
aq
Prolia
nt
ML350
4
G
B
30
0G
B
3CQ2
32SE
86Q
$2,25
0.00
Printer
s
Docum
entatio
n
Breakroom
LaserJet HP
LaserJ
et
2055d
n
$200.
00
Hardwar
e Total
$10,0
00.00
The details of the software requirements for the development of the system is
provided below:
Document Page
14
SYSTEM ANALYSIS AND DESIGN
Software Requirement of the development of the system
Document Page
15
SYSTEM ANALYSIS AND DESIGN
Location Vendor Name
Operating
System
Version
Numb
er of
Licens
es
Replaceme
nt Cost
All
Servers
Micro
soft
Small
Business Windows
2003 -
Premium 1
$
24,300.
00
All
Workstati
ons
Micro
soft
Small
Business Windows 2007 7
$
2,000.0
0
All
Workstations
Micros
oft
Office
Standard Windows 2010 7
$
168.00
Software
Total
$
26,468.00
Work Environment
The working environment of the project should be very efficient and all the team
members should be co-operative with the project manager and also make an effort in

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
16
SYSTEM ANALYSIS AND DESIGN
maintenance of all the responsibilities of the team members. In addition to this, the
information system installation in the office would help the staffs of the organization to
perform their task better with an increased level of efficiency. In addition to this, the safety
measures of the employees and the data of the organization are to be kept safe from any type
harmful activities. The machines installation is to be protected with a suitable barricade and
also it is to be seen that no other employee except the administrator has access to systems. In
addition to this, the access control for the access to the information system is to be
maintained and the administrator should see to it that no other staffs or employees are granted
permission without proper reasoning to access the main severs of the system. This would help
in maintaining the workplace safety and free the employees from any type of hazards. In
addition to this, the safety in the data access control for the systems would also help the
organization in maintaining the confidentiality of their data which would safeguard them
from any type of external intrusion of the system and prevent any type of data
mismanagement and data deletion.
Process and the Procedures to be used
For the development of the system the Visual Studios are to be used and the front end
development is to be done on the GUI of the Visual Studio Interface and in Addition to this,
the Microsoft Sql Server is to be used for the development of the database for the system.
Work Breakdown Structure
The Work breakdown structure is an important aspect for any type of development
and any type of project. The WBS (work breakdown structure) breaks a complex, unclear,
confusing cluster of interdependent work-to-do into smaller, clear and clearly arranged form.
Based on this structure, we can assign, manage, control the resources we need to complete for
each of the work-packages - not only the human resources, material and underlying time and
costs needed, but we can use this structure for assigning the project-discussion and attached
Document Page
17
SYSTEM ANALYSIS AND DESIGN
project-files as well. The Work Breakdown Structure for the project with which the report is
concerned in here is provided below:
The main processes of the design of the information system for the organization are
project initiation, project planning, project design, project implementation, project testing,
project delivery and maintenance. The main summary task of the project is the Inventory
Storage system.
Gantt Chart
The Gantt Chart is an important tool which is to be considered for the development of
any type project and useful in measuring the critical path of the project for any type of system
development. A Gantt Chart is a pretty handy thing for planning a project, especially when it
is used along with very rigorous application of the Critical Path Method (CPM). Without
CPM, it is still a Gantt Chart, but also is just a collection of unconnected bars and its
usefulness is greatly diminished. The Gantt Chart of the project that is being concerned with
this report is provided below:
Document Page
18
SYSTEM ANALYSIS AND DESIGN
The above defined project consists of 25 activities which is to be completed in 47
days. In addition to this, the Gantt chart also displays the CPM for the project easily and it
can be seen easily that the project consists of a single critical path and hence, it can be
concluded that the project development is done in a waterfall model.
Bibliography
Buede, D. M., & Miller, W. D. (2016). The engineering design of systems: models and
methods. John Wiley & Sons.
Chopra, A. K. (2017). Dynamics of Structures. Theory and Applications to. Earthquake
Engineering.
Dennis, A., Wixom, B. H., & Tegarden, D. (2015). Systems analysis and design: An object-
oriented approach with UML. John wiley & sons.
1 out of 19
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]