logo

Team Management At Dss Consulting

9 Pages891 Words20 Views
   

Added on  2022-08-12

About This Document

I need a presentation on powerpoint. I need the presentation on the case study. I attached the case study and also the questions for the presentation. I attached the instruction paper for the presentation. You can find the questions for the presentation on the instruction paper. In total is 6 question so I need 6 slides. Can you also write it down what i have to say for each slides. Please read carefully the instruction paper and the questions.

Team Management At Dss Consulting

   Added on 2022-08-12

ShareRelated Documents
TEAM
MANAGEMENT
AT
DSS
CONSULTING
Team Management At Dss Consulting_1
How did Chris Peterson develop & lead the Southwest Region team?
Team Members Development (7)
2 members from Contract Negotiations
2 members from Information Technology
2 members from Procurement and Systems
1 member from Facilities
Team Lead
Relocate to a new space
Complete existing consulting projects
Arrange meetings for flexible communication and sharing of experiences
Define the DSS system specifications and its usage
Plan and Budget for the system
Share work and receive feedback
Build the system into four components suitable for small districts
Inform the boss about the difficulties
Continue the project without any assurance of help
Generate project closure and get ready for beta-testing
Team Management At Dss Consulting_2
What factors influenced Chris Peterson’s decisions?
Recruit experienced and skillful people
in DSS consulting process and can
maintain a cohesive attitude in the
work atmosphere
Co-locating the members to a new
space will prevent distractions and
allow to focus strictly on the
development of the product
Arranging meetings for sharing of
experiences will make the members to
enhance free communication
Conduct a team outing for
refreshment of the team members
(Rybakova, Vinogradova and Sizikova
2020, January)
Maintain an optimistic environment
and constantly encourage the members
to be productive (Tabassi
et al. 2017)
Team Management At Dss Consulting_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Habitat for Humanity Project
|6
|1582
|28

Case Study: Chris Peterson at DSS Consulting
|6
|910
|95

Mortgage Broking: Short Answer Question 5 and Credit Application Processing
|5
|1136
|152

Industry Consulting Project | Cobb Lane
|10
|2397
|14

Managing a Virtual Team: Implementing a Reward and Recognition System
|2
|547
|231

Assignment on Interpersonal Skills
|2
|762
|373