Running head: PROJECT INFORMATION REPORT
Project Information Report

Traffic Light Installation and Road Widening Project

Name of the student:

Student ID:

Name of the University:

Author’s note:

1PROJECT INFORMATION REPORT
Table of Contents

Introduction ..................................................................................................................................... 2

Project Overview ............................................................................................................................ 2

Options, Issues, and Recommendations for Road Widening Project ............................................. 3

Risk Identification ....................................................................................................................... 5

Conclusion ...................................................................................................................................... 9

Bibliography ................................................................................................................................. 11

2PROJECT INFORMATION REPORT
Introduction

The following assignment has been made for the construction project considering the
development of the construction project environment and alignment of the successful integration
and management of the activities (Kerzner 2018). The listing of the activities and managing the
utilization would be improved for the functional development and forming. The information
management for the construction projects had been implied with the improvement development.
The effective information and listing of the successful management information development has
been done for compiling the information. The alignment had been implied for making sure that
the implied for listing the utilization development. The probable risk management had been
implied for integrating the listing of the implied management.

In this assignment, the identification of the probable risk factors would be helpful for
listing the probable management development. The project of Traffic Light Installation and Road
Widening Project is being considered with the successful management and development. The
successful completion of the report would provide the possible risks and their mitigation
strategies. The report would provide the options, issues, and recommendations for road widening
project. The utilization of the improved functional management risk management using the
quantification of the time schedule and cost has been done using the Black Spot estimation.

Project Overview

The construction project of Traffic Light Installation and Road Widening Project has
been implied for aligning the development of the successful alignment management. The
utilization would result in implying the successful formation and listing of the information
management. The widening of the roads is a major construction project developed for informing

3PROJECT INFORMATION REPORT
the alignment of successful execution of the projects. The integration of the construction works
has been constructed for modifying the development site on the corner of a busy state road and a
local road with lesser amount of traffic. Both the roads meet at a T junction.

Options, Issues, and Recommendations for Road Widening Project

The construction works of Traffic Light Installation and Road Widening Project would be
done following the construction of the roads and widening for the installation of the traffic lights.
The construction works had been helpful for ensuring the development of proper and effective
work outputs. The following section would highlight the options, probable issues, and provide
some recommendations for Traffic Light Installation and Road Widening Project,

Options: The construction projects have the following options for development of the
effective plan of operations including the implication of the project management operations. The
options of project are highlighted below,

Information Utilization for construction works- The allowance of the construction
management has been successfully implied with the utilization of the probable factors and
development of the information management. The options for the project include the
construction works and resource utilization. The integration of the construction works has been
implied for modifying the development site on the corner of a busy state road and a local road
with lesser amount of traffic.

Appropriate Budget Development- The project manager has been provided with a budget
of $400,000 for the completion of the project. The analysis of the construction projects had been
defined with the utilization of the management process. The widening of the roads is a major

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Great Northern Highway Upgrades (Upper Swan, Western Australia) - Project Report
|11
|2034
|426

Project Report on Wonboyn River Bridge Project
|18
|3855
|266

Project Report for Bakewell Underpass (Adelaide)
|11
|1943
|161

Project Report for Amelup Curves Construction Project
|11
|1856
|186

Business Modelling Tools (7BSP1174)
|9
|986
|57

BSS060-6: Project Management - McDonald’s McDelivery Project
|23
|5821
|72