2 UNDERSTANDING SUPPLY CHAIN MANAGEMENT ON CONSTRUCTION PROJECT IN UK Project Summary SCM is a concept that is predominantly intended to improve performance and reduce wastes both of which are very significant factors for any organization to successfully compete and survive in the current global economic environment. This research will be carried out with the main aim of understanding SCM on building and construction developments in United Kingdom (UK). The concept of SCM plays a very crucial role in the construction industry. SCM has assisted construction companies by improving competitiveness, have more control and regulation over various variables and factors within the project, which has directly contributed to the increase in profit margins. The findings of this research will be able to highlight the restrictions and problems which exists in the construction industry of United Kingdom’s supply chain as well as causes of the problems. The research will give possible recommendations to address the problems identified. Introduction Information flows and proper management of materials are the main strategic priorities for majority of construction companies(Pryke, 2016).Therefore,SCM can be a very significant technique for the building corporations. This proposal tries to ascertain the application of SCM in building industry.
3 Aims and objectives The main aims and objectives of this research is to enable one to understand the role of SCM on building and construction works in the UK. The objectives have been formulated as follows; 1.Carrying out literature review onSCM in building and construction 2.To understand the Common model of the supply chain in the works of building and construction 3.To find out the reasons of integrating the core principles of SCM in building. 4.To demonstrate the building supply chain in construction industry its benefits. Research questions This research will be guided by the following questions; What is SCM? How is SCM integrated in construction industry? What are the paybacks of applying SCM in building industry? What are the core reasons of integrating theof SCM in building industry? Literature review SCM in building works and construction SCM involves vigorous regulation of supply chain events in order to ensure maximum value on the side of the client and also realize a viable and manageable competitive advantage(O'Brien, Formoso, Ruben, & London, 2017). The chain shield everything, beginning from development of the product, sourcing, and producing products, carrying out logistics and also putting information
4 system in place to ensure the organization’s activities are still running no matter what. The supply chain management theory can be established based on two notions. They include; Basically, any artefact which the end user receives at the final stage represents the collective effort and strength of numerous organizations. All those organizations are referred to as supply chain. The second theory is even though supply chain has been there all along, most individuals and organizations prefer buying directly from the seller once they have run out of stock. Efficient administration and supervision in supply chain should be given priorities in order to compete globally(Walker, 2017). Proposed factors that are required in SCM The following are some of the key issues that should be distinguished when applying a SCM in building and construction; Mostly the building to be constructed belongs to a single individual(Townsend, 2014) The location, equipment and construction techniques changes in different projects Some construction materials may not be stored in the site of the project Supply Chain Management is meaningful and resourceful while building. In addition, building is a development, demonstrated by absence of combination of its supply chain activities, one thing which makes SCM an assuring tactic in achieving incorporation between the external and the internal traders and suppliers, contractors, designers and subcontractors(Lundesjo, 2011). Demonstration of the building supply chain and how all its partakers intermingle.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
5 Common model of SCM in building works and construction Each building task to be constructed is likely to have many supply chains. This is because each new project the customers may need and the building project features may not be the same. The supply chain therefore, in any building and construction areas symbolizes a structure of numerous suppliers(Benton & McHenry, 2017). This is the customer relationship which is required in order to finish the projects. In addition, whatever that is supplied ends at the construction site. One other area that can’t be ignored also is thetotal number of customers linked to the manufacturing supply chain and also the total number of customers in the building site that is restricted. Supply chain in construction is largely affected by a high number of problems which have been outlined by several authors. A good number of them are not created in the renovation process but in various stages which are within the supply chain cycle. Here are a few of those challenges; Low quality of materials and equipment Design issues i.e. numerous changes and unreliable information, Lack of enough management(Mead & Gruneberg, 2014) Poor quality training of the builder’s suppliers, workers and subcontractors Incomplete form of communication and transfer of information Poor methods in measuring and appraising various parties in the process of supply chain (Khairuddin, 2016). Reasons of integrating the main values of SCM The following are some of the reasons why the principles of SCM should be integrated; oGaining competitive and comparative advantage
6 oGenerating value for money oReducing costs oSatisfactory of both the internal and external customers Information flows and proper management of materials are the main strategic priorities for majority of construction companies(Pryke, 2016)SCM processcan be a very significant technique for the building and construction companies. This is particularly attractive considering the fact that it is where the actual integration, management and coordination of supply chain activities takes place. Expected Practical Element Output To understanding the situation of SCM in the UK’s construction Industry, a generic Methodology will be required to implement Supply Chain Management. This methodology will be mainly addressed to the construction firms. Nevertheless it can as well applied by additional parties in the supply chain. This methodology will be founded on the Deming cycle, which is also known as PDCA cycle (plan – do – check – act)(Thunberg, 2017).Thefoundation of this cycle and its presentation to all procedures or activities of the industry are fundamental to realize constant enhancement of its supply chain. The core procedures of enactment are presented in the following figure;
7 Fig:Key procedures of the SCM implementation This research approach is aimed at strengthening four aspects: coordination, strategic planning, effective collaboration and Information integration and focus on the client as illustrated in the figure below. For the project methodology to be implemented effectively, many methods and tools will be used as presented in the figure below
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
8 Fig: methods and tools for the planned methodology(Sullivan, Barthorpe, & Robbins, 2016) Required Resources Some of the resources that will be required will include print media such as journals, books, magazines and brochures. Also electronic sources will be required such as a laptop for recording data, printer for printing questionnaires and interment among others(Ekeskär, 2019). Financial resources to cater for different expenses which will be incurred during the study period such as; transport expenses, finances to purchase all the required tools and equipment. To gather sufficient data there will be need to be supplied with, supplier’s evaluations, flow diagrams and access to the database of different construction company. This will be aimed at access the firsthand information and have an opportunity to analyses how different construction companies have been making application of SCM in their operations.
9 All the resources that will be required must be met to ensure that the research is carried out as expected and all the research questions have been addressed. Prerequisite Knowledge/skills required Before the actual research there will be need to have the following skills rather than traits, in order to complete the research successfully; i)Oral and written communication This will be of great importance during data collection, since it will be a great tool to communicate questions and concerns to enable gather the required data. ii)Coordination There will be need to have ability to coordinate equipment, the research crew and resources. iii)Mechanical and building knowledge Mechanical and construction knowledge will be of great help in guiding the questions to be askedduringtheinterviews.Thisknowledgewillberequiredwhenvisitingdifferent construction sites. iv)Other skills include; v)Critical reasoning skills vi)Willingness to learn vii)Organization viii)Working well with others ix)Comfortable and adept with technology Project Plan – Gantt chart
10 The research will be carried out in 5 months as shown in the Gantt chart below. Fig: Gantt chart Conclusion In conclusion, application of SCM in building projects is growing swiftly. SCM involves vigorous regulation of supply chain events in order to ensure maximum value on the side of the client and also realize a viable and manageable competitive advantage(Winch, 2017). This research will be carried out with the main aim of understandinghow SCM works on construction projects and works in United Kingdom (UK). SCM has a very vital part in the construction industry. SCM has assisted construction
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
11 companies by improving competitiveness, have more control and regulation over various variables and factors within the project, which has directly contributed to the increase in profit margins.
12 References Benton, C., & McHenry, L. (2017).CONSTRUCTION PURCHASING & SUPPLY CHAIN MANAGEMEN.Sydney: McGraw Hill Professional. Ekeskär, A. (2019).Exploring Third-Party Logistics and Partnering in Construction: A Supply Chain Management Perspective.Chicago: Linköping University Electronic Press. Khairuddin, N. B. (2016).Practices and Challenges of Supply Chain Management Among Construction Project in Malaysian Construction Industry.Chicago: Universiti Teknologi Malaysia,. Lundesjo, G. (2011).Supply Chain Management and Logistics in Construction.London: Kogan Page. Mead, J., & Gruneberg, S. (2014).Programme Procurement in Construction.London: John Wiley & Sons,. O'Brien, W., Formoso, C., Ruben, V., & London, K. (2017).Construction Supply Chain Management Handbook.Chicago: CRC Press. Pryke, S. (2016).Construction Supply Chain Management: Concepts and Case Studies.London: John Wiley & Sons,. Sullivan, G., Barthorpe, S., & Robbins, S. (2016).Managing Construction Logistics.London: John Wiley & Sons. Thunberg, M. (2017).Developing a Framework for Supply Chain Planning in Construction. Chicago: Linköping University Electronic Press.
13 Townsend, M. (2014).Managing in Construction Supply Chains and Markets: Reactive and Proactive Options for Improving Performance and Relationship Menagement.Texas: Thomas Telford. Walker, A. (2017).Project Management in Construction.London: John Wiley & Sons. Winch, G. (2017).Managing Construction Projects.Paris: John Wiley & Sons,.