Table of Contents INTRODUCTION...........................................................................................................................3 TASK 1............................................................................................................................................3 P1: Conduct a review and critique of the implementation of operations management principles within an organisational context..................................................................................................3 M1: Review and critique the implementation of operations management in relation to Six Sigma methodology and Lean principles.....................................................................................4 TASK 2............................................................................................................................................6 P2: Prepare a continuous improvement plan based on the review and critique of operations management principles within an organisational context............................................................6 M2: Analyse the effectiveness of a continuous improvement plan using appropriate theories, concepts or models.......................................................................................................................7 TASK 3............................................................................................................................................7 P3 & M3:Apply each stage of the PLC to a given project...........................................................7 TASK 4..........................................................................................................................................12 P4: Review and critique the effectiveness of the PLC in application to the chosen project using appropriate theories, concepts and models................................................................................12 M4: Critically analyse the use of appropriate theories for large and small scale projects.........13 CONCLUSION..............................................................................................................................13 REFERENCES..............................................................................................................................15
INTRODUCTION Operationmanagementencompasses theprocessof overseeing,manufacturingand controlling the business operation by making optimum use of resources with perspective to accommodate customers requirement. It leads to better management of internal activities and achieve quality standards(Anand and Gray, 2017). Project management endeavour the technique to apply desirable knowledge, capability as well as skill to carry out project activities and attain the requirement of overall project. To better understand the concept this report involves two section within first part Bentley motorshas been selected whose headquarter is in UK. It manufacture as well market luxury cars as well as SUV in the global market. This part covers topics like review as well as critique an effectiveness of operations management principles and discuss continuous improvement plan in context to company.The other partis based on HS2 project which plans the project of high speed railway in UK. It include topics like preparation of PLC and apply the techniques to ensure the quality and scope of project. TASK 1 P1: Conduct a review and critique of the implementation of operations management principles within an organisational context Overview of Bentley motors Bentley Motors is a British company which is a producer of luxury cars and SUVs and is a subsidiary of Volkswagen group since the year 1998. It has its headquarters in Crewe, England and offers a wide range of premium products which suit the requirements of its various customers. It not only has its business in England but it has spread operations all over the world. Operation vs Operation management Operation:It include series of actions which are effective planned out in order to process the functioning of business and gain desirable output(Andersen, 2016). The actions which are incorporated within Bentley motors for better operations include planning, manufacturing and distributing of luxury cars. Operation Management:It is the part of management which is concerned to perform systematic production as well as final delivery of offering. The manager of Bentley motors carry out the activities like analysing as well as monitoring task properly.
OperationOperation management Theemployeesofanorganisationare responsible to perform routine operations systematically. Manager conduct operations management that help to successfully direct and transform the input into outputbyusingdesirableequipmentor technology. It comprises the set of different activities which are performed through specialisation of worker and staff. Actions are overviewed, monitored and controlled to enhance the efficiency. Implementation of operation management principles within Bentley motors The operation management principles are performed by operation manager to carry out better production activities. Certain principles in context to Bentley motors are stated below: Organisation principle:All the elements associated with manufacturing needs to be predicted as well as consistently managed in advance to achieve the desirable amount of profitability(OperationsManagement:Definition,PrinciplesandStrategies,2019).This principle can assist Bentley motors to achieve suitable output and gain preferable amount of productivity. Reality:Based on this principle the role of operation manager is top emphasize on problemas Bentley motors function in changing environment where there is no universal solution or technique to deals with various problems. M1: Review and critique the implementation of operations management in relation to Six Sigma methodology and Lean principles Operation management refer to the effective administration of internal business practices by using favourable techniques in order to maximize the efficiency level. This is the useful function on the basis of which manager attempts to carry out smooth business activities in effective manner(Banihashemi and et.al., 2017). The manager of Bentley motors maximises their profitability by bring modification in their luxury car for the convenience of buyer. Better operation management techniques is used to effectively plan out management of resources as well as labours in order to attain future objective. Systematic presentation of operational activities by top executivesleads to better allocation of responsibilities to generate high
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
profitability ratio. Explanation of certain principles for better flow of activities are determined below: Lean principles:It involves the cycle that help an organisation to continuous improve its operations and bring transformation in the process of carrying out activities. Application of Lean principles within Bentley motors comprises of different principles which helps to improve the overall efficiency within workplace. Identify value:Here the manager determine the customer value which means the amount customer find worthy to pay for particular product. The manager of Bentley motors discover the needs of customer through survey, web analytics and gaining demographic information to better deliver the luxury cars. Mapping value stream:Once the needs of customer is examined by Bentley motors then they map out activities to cover customer's requirement. Along with that activities that does not offer desirable result are valued and removed out while carrying out business activities. Create flow:Once unproductive activities or wastage are removed out from the operations then remaining actions are performed to create smooth flow without any delay and interruptions. This principle is useful for Bentley motors in order to eliminate the chances of higher wastage and leads better output. Establish pull:The objective of this principle is to reduce the wastage of inventory and carry out smooth work in process by gaining prerequisite information from market like demand of customer which act as a pull factor(Fahimnia and et.al., 2019). This helps Bentley motors to reduce the chances of wastage. Pursue perfection for future improvement:There is always a scope of imnporvememnt so the manager of Bentley motors constantly gain feedback from customer and use innovation to bring out further improvements. Six Sigma:This is again an essential principle that promote organisations to bring further improvement in their offerings for systematic business processes. Within Bentley motors the manager bring desirable modification within existing strategies to gain future growth and developments. This enhances the efficiently to produce desirable output.
TASK 2 P2: Prepare a continuous improvement plan based on the review and critique of operations management principles within an organisational context Continuous improvement planis concerned with identifying new techniques as well as ways to deal with particular problem. This is Japanese concept that is based to constantly improve the working pattern by providing training to employees in order to update their existing knowledge. Such improvement helps in preparing competitive team that effectively coordinate their effortsto attain the benchmark or predetermined standard. In context to themanagers of Bentley motors concerned to retain the favourable image by establishing favourable image of company in market(Hazen and et.al., 2018). This also helps to wide out competitive pressure andleadstoperformsustainableperformance.Thus,itinvolvePDCAplanwhichis implemented by Bentley motors to overcome negative aspects and formulate desirable plan top attain future objective. PlanDoActionCheck Enhance Quality Beforelaunchingnew designwithadditional attributes the manager of Bentley motors needs to analyse the quality of its productsothatfuture perspectiveintermsof growth and development can be attained. To serve supreme quality of product in market the managerofBentley motorscanusecertain techniqueand principles of operation management likeTotalquality managementtoactually determine where product meets quality standard. The manager can simply compare existing standard withactualstandard based on which analyses is made whether quality is attained effectively(Hitt, Xu and Carnes, 2016). Increase market awareness Withinthisstagethe companydetermine differentpromotional options which can be opt toexpandmarket awarenessesabout Different promotion tools areusedtocoverwide market like website, use ofsocialmedia, magazines, SEO. Herethemanagerof Bentley motors determine whetherdifferent promotional technique are suitable enough to cover wideoperations.Thisis
innovationdetermined on the basis of customer's response. Recommendations ď‚·To maximise the profitability Bentley motors needs to mitigate unnecessary cost or expenditure for which lean principle should be applied(Lindhard and Larsen, 2016). This help to enhance the productivity and promote favourable changes by meeting the expectation of customer and offer favourable value. ď‚·Along with that to maintain renowned position in terms of luxury cars and SUV Bentley motors should continuously develop their product. For this PDCA plan is applied to examine or check the quality of brand and conduct operations to meet predetermined standard effectively. M2: Analyse the effectiveness of a continuous improvement plan using appropriate theories, concepts or models. It is effective for the successful organization to continuously enhance the functional area of business by promoting sustainable changes in order to gain long term competitive advantage (Mesa, Molenaar and AlarcĂłn, 2016). The internal manager of Bentley motors works to gain sustainability performance by promoting modifications in the existing processes of company. Therefore, involvement of PDCA plan systematically encourage the firm to effectively execute business activities and maintain the quality of offering. TASK 3 P3 & M3:Apply each stage of the PLC to a given project Overview of case study:HS2 project is mainly designed to carry out transportation of high speed railway within UK. This project is based on innovation as it depends upon the advance technology which helps to reduce the carbon footprint on economy. The purpose is to strengthen network and carry out sustainable performance in order to preserve the external environment and interest of society. Due to wide structure it has capacity and spacious interior it has capacity to carry wide people and avoid the chances of congestion. Project plan Project life cycle:To carry out specificproject it is the responsibility of managers to use project life cycle in order to successfully perform activities. Within this project the Junior project
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
manager is appointed by Camden Council in order to prepare plan for HS2 project. Explanation of different project life cycle are discussed below: Initiation:Within this stage the employees as well as manager commences new idea within the firm through group discussion or brainstorming method. The new programme is completely based on advance techniques that is derived by conducting deep market research and gaining desirable information from market. In context to HS2 project the manager evaluate market situation determine untapped opportunity as well as challenges in order to promote sustainable performance. Planning:Within planning stage project manager is responsible to predetermine the activities or actions to be performed by internal staff. This gives direction and guidance to overall staff to exhibit the suitable method in order to attain the objective(Pinto and Winch, 2016). Effective plans needs to be designed for HS2 railway track on the basis of market information and wide discussion. After that the plan is presented to the top project manager which finally gives approval or ask to make certain amendments. Thus, all the activities are determined in favour of an organisation. Execution:It involve the process of implementation where all the predetermined plan as well as decision are implemented in favour of company. Usually the project manager supervise the activities and make sure the project is practically carried out without any error. In relation with HS2 project the manager constantly monitor as well as control the activities with the purpose to attain feasible result. Along with that communication takes an essential role in terms of delegation of responsibility. Certain principles like Six sigma is applied to improve quality of overall work. Gantt chart
Work breakdown structure:The Work Breakdown Structure is essential for the
managers to generate plan through deliverable the detail project scope(Prevot and et.al., 2016). The work breakdown project is a key to organise the team work into managerial sections for the division of work. Element of it's are product, data, service, etc. It also provides the necessary details for cost estimating and control for schedule development . Closure:Closure is considered as final stage of PLC that examine the result of whole strategy applied by company in favour of HS2 project. The manager based on this determine that whether they were able to attain the standard performance. If the result is in favour of company then the performance is maintained otherwise correction measures are taken to upgrade the performance of company. Application of autocratic leadership style can help company to attain predetermined result efficiently. Business plan:The business plan is referred as a written document describing the organisation behaviour and management with the projected profit and loss statement. The 7 steps for perfectly written Business Plan are as follows – research, determine the purpose of plan, create company profile, document all aspects of business, strategic marketing plan in place, make adaptable audience, explain the reason of care. Overview of the companyHS2 represent High speed 2 which is the innovation and has high speed network that cover the geographical region of United Kingdom. This project highly understand the issue of climate change due to which its functioning is completely based on innovation in terms to reduce carbon emission. Long withthatiteradicateovercrowdingissuetopromote convenience for local residence. VisionThe vision of HS2 is to spread awareness about its high speed transportation technology and carry out its operation smoothly
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
bygainingdesirableamountofprofitability(Saucedo- MartĂnez and et.al., 2018). MissionThe mission of company is to maintain goodwillby adopting appropriateCSRstrategyandestablisheffectiveimage amongst society. Strategic objectiveHS2 project is based on strategic objective to maximise the overall probability margin for innovation by 15% within one year. StrategyTo carry out better functioning HS2 project set out significant strategies like TQM and lean production method to enhance the firm's profitably by constantly improving the operation and reduce the chance of human error. BudgetFor systematic programming budgets are prepared in advance based on which firm accordingly carry out expenditure on diverseactivities.ThishelpHS2 companyto effectively process organisational activities. ParticularAmount Cost of designing program12000 Remunerationtoemployeesand worker 8000 Purchase of raw material2500 Miscellaneous expenditure1750 Total budget24250 Based on budget it is determined that Bentley company need to make the expenditure of 24250 in order to effectively accomplish whole project. Follow UpBudget and strategies needs to be effectively inculcated and
followed up by internal staff as it help to minimise the chances of variation in terms to perform internal activities. TASK 4 P4: Review and critique the effectiveness of the PLC in application to the chosen project using appropriate theories, concepts and models Waterfall modelis used to perform the activities which is used by HS2 for effective completion of this project(Shenoy, 2018). In this task are responsible for constant flow of design of project in a proper manner. Different phasesActivities performed Requirement analysis In the present stage the manager of HS2 company has to determine the necessary requirement of the company in terms of knowledge and skills, resources effectively in the well define manner. Apart from this company can able to increase the profitability and productivity of firm. Company must follow all the method to minimize the carbon emission present in the organisation. DesignIt is essential to have proper design which is developed in the organisation which are concerned duration for that HS2. There must be efficient techniquesand method should be used as to reduce the waste for the company. ImplementationOnce the requirement is analysed and the design is prepared the company thus plan should be implemented in well define manner. The manager of HS2 must focus on efficient method to improvise plan which help in achieving desire outcomes. Verificationand Maintenance After the implementation there is a next step which help achieving desire aims and objectives effectively. The organisation must hire experts and well skilled employees for maintenance. It is prime duty ofthe manager of the company to look and track the activities as make changes in project for verification process.
Hence, waterfall model is the best method which help in providing effective resources and take initiative to achieve desire aims and objectives in a timely manner.This promote the overall quality in demonstrating the activities of whole project. Further, application of other concepts like measurement of effectiveness acts as a desirable procedure which modify terh activities of different organisation such as small business entity to produce desirable amount of output. M4: Critically analyse the use of appropriate theories for large and small scale projects METHODOLOGIESSMALL-SCALE PROJECTS LARGE-SCALE PROJECTS Six SigmaThis is the small-scale project which mainly focus on the six sigmaastoimprovethe efficiency and productivity of the company. Along with this it help to bring down the cost toexpandthebusinessat larger scale. In the case of large scale it aid tohandlelargeoperationin order to boost the sales and profitabilityofthecompany (Tupa,SimotaandSteiner, 2017). Lean PrinciplesThis method is liable for the companyforsmallscaleto reduceunnecessaryexpense for business. For the large company there aredifferentkindoffactor which are used such as funds to carry forward the activities. Soleanmanagementaidto maintaincosteffectivelyfor longer time duration. CONCLUSION Based on the report it has been determined that operation and project management are desirable aspect that is carried out by an organisation to enhance the overall productivity as well asprofitability.Applicationofspecificoperationmanagementprincipleslikecontinuous improvement and lean production method shape the internal operation and help firm to gain
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
competitive advantage over other rivalries. Successfully organisation continuously bring out the innovation and structure the operation. Moreover, there are various project management stages which commences with initiation and goes till closure all the stages work to bring out favourable result. Therefore, project manager articulate the planning and monitoring activities with the objective to gain sustainable performance.
REFERENCES Books and Journal Anand, G. and Gray, J. V., 2017. Strategy and organization research in operations management. Journal of Operations Management.53.pp.1-8. Andersen, E. S., 2016. Do project managers have different perspectives on project management?. International Journal of Project Management.34(1). pp.58-65. Banihashemi, S. and et.al., 2017. Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries.International Journal of Project Management.35(6). pp.1103-1119. Fahimnia, B. and et.al., 2019. Behavioral operations and supply chain management–a review and literature mapping.Decision Sciences.50(6). pp.1127-1183. Hazen, B. T. and et.al., 2018. Back in business: Operations research in support of big data analytics for operations and supply chain management.Annals of Operations Research. 270(1-2). pp.201-211. Hitt, M. A., Xu, K. and Carnes, C. M., 2016. Resource based theory in operations management research.Journal of Operations Management.41.pp.77-94. Lindhard, S. and Larsen, J. K., 2016. Identifying the key process factors affecting project performance.Engineering, Construction and Architectural Management. Mesa, H. A., Molenaar, K. R. and AlarcĂłn, L. F., 2016. Exploring performance of the integrated project delivery process on complex building projects.International Journal of Project Management.34(7). pp.1089-1101. Pinto, J. K. and Winch, G., 2016. The unsettling of “settled science:” The past and future of the management of projects.International Journal of Project Management.34(2). pp.237- 245. Prevot, T. and et.al., 2016. UAS traffic management (UTM) concept of operations to safely enable low altitude flight operations. In16th AIAA Aviation Technology, Integration, and Operations Conference.(p. 3292). Saucedo-MartĂnez,J.A.,andet.al.,2018.Industry4.0frameworkformanagementand operations: a review.Journal of ambient intelligence and humanized computing.9(3). pp.789-801. Shenoy, R.,2018, November.What'stheDifferenceBetweenLeanConstructionandan OperationsScienceApproachtoProjectDelivery?.InAbuDhabiInternational Petroleum Exhibition & Conference. Society of Petroleum Engineers. Tupa, J., Simota, J. and Steiner, F., 2017. Aspects of risk management implementation for Industry 4.0.Procedia Manufacturing.11.pp.1223-1230. Online OperationsManagement:Definition,PrinciplesandStrategies.2019.[Online].Available through:<https://www.hashmicro.com/blog/operations-management/>