logo

ASSESSMENT 2 TEAMWORK AND REFLECTION

   

Added on  2019-11-08

7 Pages1395 Words150 Views
 | 
 | 
 | 
Running head: ASSESSMENT 2Assessment 2: Teamwork and Reflection Name of the StudentName of the UniversityAuthor’s Note
ASSESSMENT 2 TEAMWORK AND REFLECTION_1

1ASSESSMENT 2Table of Contents2. Part Two.......................................................................................................................................22.1 Learning Cycles.........................................................................................................................23. Part Three.....................................................................................................................................33.1 Communication Plan.................................................................................................................33. Part Four......................................................................................................................................63.1 Reflection...................................................................................................................................6Bibliography....................................................................................................................................8
ASSESSMENT 2 TEAMWORK AND REFLECTION_2

2ASSESSMENT 22. Part Two2.1 Learning CyclesThis part states to design learning cycle table with including each team member withaccounting teamwork within meeting schedule. The learning cycle is to be prepared before theroles are assigned to the team. The learning cycle table is prepared considering two separate rolessuch as organizer and scribe. Organizer and scribe roles are clearly mentioned for the teampersonnel and their individual roles. The table shown all in details underneath: Meeting agendasOrganizerScribeRisk identification Risk manager organizes the meeting with other teammembers to let them know about the existing andemerging risks in the project. He identifies the risksalong with consequences for declaring them in thismeeting. Project manager,ResourceManager, RALSAuthority Risk analysis Risk manager is responsible for holding this meetingwith pointing out the risk analysis activity. Riskmanager will identify some risk analyzer tools andtechniques for analyzing the risks. Later, the riskconsequences will be shared within the teammembers. ResourceManager, andProject ManagerRiskresponseplanning Risk manager is responsible for planning riskresponses. The risk response planning is conductedfor collecting responses regarding risk analysis andmitigation. The risk responses clearly identifies thestrategy to mitigate risks. Business Analyst,Project Manager,ResourceManager Risk register Risk manager takes charge of the meeting forpublishing risk register datasheet with detailed risktreatment plans. The risk treatment plan includes riskidentification, severity scoring, consequencesanalysis, and mitigation aspects. Project Manager,RALS Authority,Business Analyst Risk mitigation planRisk manager is responsible for mitigating risks andfurthermore, reducing risk consequences alongsidepreventing the risk outcomes. Risk mitigation plancan be subject to change management as mitigationplan can change due to risk impacts andconsequences. For instance, some risks could getremoved from the system under certain situation;Project Manager,Business Analyst,ResourceManager, RALSAuthority
ASSESSMENT 2 TEAMWORK AND REFLECTION_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents