logo

ICTNWK412 Create Network Documentation Assessment 2022

Details of Assessment for a report writing assignment in the subject of Server Management and Documentation for the ICT40115 Certificate IV in Information Technology course.

34 Pages5702 Words27 Views
   

Added on  2022-10-15

ICTNWK412 Create Network Documentation Assessment 2022

Details of Assessment for a report writing assignment in the subject of Server Management and Documentation for the ICT40115 Certificate IV in Information Technology course.

   Added on 2022-10-15

ShareRelated Documents
T-1.8.1_v3
Details of Assessment
Term and Year Time allowed N/A
Assessment No 1 of 2 Assessment Weighting 40%
Assessment Type Report Writing
Due Date Week 4 Room George St
Details of Subject
Qualification ICT40115 Certificate IV in Information Technology
Subject Name Server Management and Documentation
Details of Unit(s) of competency
Unit Code (s) and
Names
ICTNWK401 Install and manage a server
ICTNWK412 Create network documentation
Details of Student
Student Name
College Student ID
Student Declaration: I declare that the work submitted is my
own and has not been copied or plagiarised from any person or
source. I acknowledge that I understand the requirements to
complete the assessment tasks. I am also aware of my right to
appeal. The feedback session schedule and reassessment
procedure were explained to me.
Student’s
Signature: ____________________
Date: _____/_____/_________
Details of Assessor
Assessor’s Name
Assessment Outcome
Assessment
Result Competent Not Yet Competent Marks /40
Feedback to Student
Progressive feedback to students, identifying gaps in competency and comments on positive improvements:
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________
Assessor Declaration: I declare that I have conducted a
fair, valid, reliable and flexible assessment with this student.
Student attended the feedback session.
Student did not attend the feedback session.
Assessor’s
Signature: ___________________
Date: _____/_____/________
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 1
ICTNWK412 Create Network Documentation Assessment 2022_1
T-1.8.1_v3
Purpose of the assessment
The purpose of this assessment is to assess the student in the following
outcomes:
Competent
(C)
Not yet
Competent
(NYC)
ICANWK401 Install and Manage a Server
1. Determine network documentation requirements
1.1 Prepare for work, according to site specific safety requirements and
enterprise workplace health and safety (WHS) processes and procedures
1.2 Obtain server applications and features from appropriate person
1.3 Choose most suitable operating system features and network
services with reference to required server solution and technical
requirements
1.4 Review required installation options
1.5 Analyse data migration requirements
1.7 Arrange access to site and advise client of deployment and potential
down time
ICTNWK412 Create network documentation
1. Determine network documentation requirements
1.1 Consult with appropriate personnel
1.2 Identify network documentation standards
1.3 Define network configuration
1.4 Develop naming standards and labelling schemes
1.5 Develop network addressing scheme and verify, using calculations
2. Design network diagrams and checklists
2.1 Identify network software mapping tools
2.2 Use network software mapping tools to design network diagrams
2.3 Develop plans and checklists
2.4 Develop manuals
3. Produce network documentation
3.1 Validate documentation structure with appropriate personnel
3.2 Produce network diagrams
3.3 Produce network plans and checklists
3.4 Produce procedure and policy manuals
3.5 Prepare documentation for publication
4. Complete network documentation
4.1 Check network documentation with appropriate personnel
4.2 Select appropriate media
4.3 Publish network documentation
4.4 Record and store essential network documentation
4.5 Notify appropriate personnel of the completed network documentation
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 2
ICTNWK412 Create Network Documentation Assessment 2022_2
T-1.8.1_v3
Assessment/evidence gathering conditions
Each assessment component is recorded as either Competent (C) or Not Yet Competent (NYC). A student
can only achieve competence when all assessment components listed under “Purpose of the assessment”
section are recorded as competent. Your trainer will give you feedback after the completion of each
assessment. A student who is assessed as NYC (Not Yet Competent) is eligible for re-assessment.
Resources required for this assessment
Computer with relevant software applications and access to internet
Weekly eLearning notes relevant to the tasks/questions
Instructions for Students
Please read the following instructions carefully
This assessment has to be completed In class At home
The assessment is to be completed according to the instructions given by your assessor.
Feedback on each task will be provided to enable you to determine how your work could be improved.
You will be provided with feedback on your work within two weeks of the assessment due date. All other
feedback will be provided by the end of the term.
Should you not answer the questions correctly, you will be given feedback on the results and your gaps in
knowledge. You will be given another opportunity to demonstrate your knowledge and skills to be deemed
competent for this unit of competency.
If you are not sure about any aspect of this assessment, please ask for clarification from your assessor.
Please refer to the College re-assessment for more information (Student handbook).
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 3
ICTNWK412 Create Network Documentation Assessment 2022_3
T-1.8.1_v3
Assessment Task 1- Project/Report Writing (40%)
In this assessment task, you are required to research and document on a suitable operating systems
for a server and create a network documentation for an office environment. The concept behind this
assessment is that you are able to review, research, recommend and confirm on key tasks
chronologically listed below, which are applicable and associated with the skills you need to gain to
successfully install and manage server and present to client a comprehensive network
documentation. The document produced will be a report, more specifically a proposal report
documented as per Table of contents outlined after the case study.
Key tasks are:
For Server/Network Environment
1. Arrange access to site to cover (as per case study)
a. Preparation for site specific safety requirements
b. Preparation for workplace health and safety (WHS) processes and procedures
c. Advising client of deployment and potential down time
2. Review server applications and features provided in the case study
3. Choose most suitable operating system features and network services
4. Review required installation options
5. Analyse data migration requirements
For Creating Network Documentation
1. Determine network documentation requirements
2. Design network diagrams and checklists
3. Produce network documentation
4. Complete network documentation
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 4
ICTNWK412 Create Network Documentation Assessment 2022_4
T-1.8.1_v3
Case Study:
ABC Real Estate office is based in Sydney CBD. They have been operating in a small office for over 5
years. Business has grown and they have now planned to relocate to a new bigger office.Their
business team has grown to 15 staff. ABC Real Estate has approached your business XYZ ICT
Consulting Pty Ltd to assess their current network and ICT services and hardware infrastructure and
have you propose a suitable solution where the new site office will have a new network set-up with
new server, router, switches and wireless devices, some new desktops etc so that their business does
not suffer any downtime due to office relocating.
Additionally, ABC Real Estate new and current office site is currently undergoing renovationandhas
new workplace safety policy where external site visits require a prior appointment made and a safe
work method statement document produced back by yourself for any hazards identified. Please refer
to Appendix 1 for a template that can be used.
ABC Real Estate has 2 Executive directors, 5 Sales and Marketing Staff, 1 Operations Manager, 1
Human Resource Manager, 5 Administration Staff, 1 Accountant.You are also provided with the
following information of their current Network diagram and server capacity, including list of IT issues
that they are currently facing on their server, network and desktop environment.
Current Network Infrastructure/Diagram:
Figure 1: Current IT Infrastructure
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 5
ICTNWK412 Create Network Documentation Assessment 2022_5
T-1.8.1_v3
Background to IT Issues
Their Business critical application isConsole SQL DB whichuses a SQL server which is hosted in-
house and has the following hardware and software configuration. You are not required to manage
the installation and deployment of this SQLserver software but you are toprovide a server
environment that is capable of running the SQL server.The business also accesses a cloud based
software as a service (SaaS) called eSales that has potentials of Active Directory Sync if ABC Real
Estate are able to migrate to Windows 2012 R2 server environment. Here again, you do not need to
scope the Active Directory Snyc project work for this SaaS.
Due to virtualisation requirement for future applications and client web portal, ABC Real Estate needs
to procure a server environment running on Linux which could be provided on the same single server
hardware, virtualised, with the two Network Operating Systems Linux and Windows 2008 or 2012
installed.
For Linux Network operating systems, web portal vendor preference are on Fedora Version 19 till 22.
For test environment purposed client requires only 1 workstation PC installed with Linux workstation
operating system.
Current Server Specification
Configuration Value
Processor Intel i7 4 core Processor @ 2.8Ghz/core
Memory 8GB
Disks 1x 1TB Disk
Network 1 Gbps
Volumes C:\ (OSDISK) – 78GB Free/150GB Total
D:\ (DATA) – 201GB Free/781GB Total
OS Windows 2008 R2 SP1
SQL SQL 2008 Express Edition
SQL Database Size ~9GB
NOTE: Users do not have Remote Access and the administrator only uses
VNCVirtual Network Computing to remotely connect to his/her workstation.
Current issue:
1. Business critical server is an Intel ‘whitebox’ (PC) and not a
reliable/commercial product.
2. 8GB of RAM is not sufficient for SQL server hosting a 9GB database with
multiple concurrent access.
3. There is no disk redundancy either through RAID or otherwise on the
business critical server.
4. Network equipment is home/SOHO grade and not suitable for a small
business.
5. There is no consistent method for remote access.
6. Backup methodology is proprietary application dependant and error-prone
due to reliance on physical intervention.
7. Rack/IT equipment does not have any physical security.
8. There is no backup power supply or UPS.
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 6
ICTNWK412 Create Network Documentation Assessment 2022_6
T-1.8.1_v3
9. 5 x work station PC for Administration staff are
running on windows XP which needs to be upgraded to windows 7 or 8
with new hardware.
Your company have previously performed a software based network audit via use of wireshark.
Please refer to Assessment 1 – Appendix 1 Network Function Matrixspreadsheet andheading
Complete Appendix 1 – Network Function Matrix’ in this report document.
In addition to solving above current issues, ABC Real Estate would mainly require the new server
environment provided with secure and reliable access to their shared folder where documentation are
stored securely by multiple staff as per their business document filing requirement. A description of
which is provided below.
Root Drive
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 7
Executive Drive
Full Access: 2 Executive
Directors
Admin: 2 Executive Directors
General Usage Drive
Full Access: 2 Executive Directors, 1
Operations Manager
Admin: 2 Executive Directors, 1 Operations
Client Documents
Full Access: All
staff
Accounts
Full Access:
Accounts Staff
Sales and Marketing
Full Access: Sales and
Human Resource
Full Access: Human Resource
Manager
Company Documents
Full Access: All Staff
ICTNWK412 Create Network Documentation Assessment 2022_7
T-1.8.1_v3
Additional Details:
This project will require a structured research as per tablet of content requirement of information.
There are many resources on the Internet that may assist you in compiling this report as well as PC
magazines and books in the library. However, all work that you submit as a part of this assignment is
to be your own work.
Your assessor will be looking for:
Requirements and deliverables
1. What to submit
a. You are to provide this information in a report format as Outlined in the Table of Contents in
this document.
2. When to submit
a. You will need to submit this by Week 3. Please review your work with your assessor by week
2. This report will be used for your second assessment delivery of practical task for the same
case study.
3. Table of Contents
o Cover Page
o Table of Contents
o Executive Summary(2 Mark)
o Introduction (1 Mark)
o Project Objective(4 Marks)
o Current Infrastructure(2 Marks)
o Proposed Infrastructure(15 Marks)
Server Requirements/Configuration (2 marks)
Suitable Network Operating Systems/Services (2 marks)
Network Requirement/Configuration (2 marks)
Technical/Network Documentation (5 marks)
Network Diagram Using Network Software Mapping Tools
Network Plans/IP Addressing Scheme
Policy/Procedure Manuals
Data Migration Requirements
Complete –Network Function Matrix (2 marks)
Backup and Recovery Requirement (2 marks)
o Bill of Material (Including Licencing)(3 Mark)
Server (1 mark)
Network Hardware (2 mark)
o XYZ ICT Consulting Services(8 Marks)
Breakdown of Project Task (4 marks)
Downtime and Contingency Plan (2 marks)
Project Task Cost (2 marks)
o Project Approval/ Client Sign-off document to Validate Documentation Structure (2
Mark)
o Appendix1: Office/Site Workplace Inspection Checklist (1 Mark)
o Appendix2: Safe Work Method Statement (1 Mark)
o Appendix3: Network Installation Checklist (1 Mark)
TOTAL MARKS: /40%
Report Formatting
Number all pages at the bottom centre of the page
Each page. Use 1.5 line spacing
Use the Arial font at either 11pt or 12pt size
Server Management and Documentation, Assessment Task-1 v3, Last updated on 10/06/2019 Page 8
ICTNWK412 Create Network Documentation Assessment 2022_8

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Server Management and Documentation Assessment Task-2
|37
|5130
|91

BSB51915 Diploma of Leadership and Management (Doc)
|20
|4857
|40

ICTNWK405 Build a Small Wireless Local Area Network
|12
|2788
|120

Wireless Network Installation and Configuration
|26
|4632
|85

ICTICT40115 Certificate IV in Information Technology Subject Name Wireless Network
|20
|4787
|213

T-1.8.1. Details of Assessment Term and Year. 1, 2019.
|23
|5113
|87