Running head:PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES Project Management Fundamentals and Practices: Implementation of Information system in Woolworths Limited Name of the student: Name of the university:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES Table of Contents 1. Background of the case project.....................................................................................................2 2. Project charter for the chosen case project....................................................................................2 3. Systematic literature review..........................................................................................................4 4. Work Breakdown Structure...........................................................................................................6 5. Development of the schedule plan................................................................................................7 6. Network diagram for the chosen case project.............................................................................11 References.......................................................................................................................................12
2PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES 1. Background of the case project In this current era of technology automated system has become one of the most vital solutions for the business organizations to gain competitive advantages and structured commercial revenue as well. It is necessary for any business organization to design an automated Information System for their company to resolve previous security and manual data entry level errors. For this specific report the chosen case project is “Implementation of Information system in Woolworths Limited”. The targeted company is required to convert their traditional data management system into an automated data system. For the chosen case project a project charter considering a systematic literature review will be illustrated. In addition to this, a WBS and a schedule plan is also developed for the case project that has to be designed. Not only this but also a network diagram for the project is also represented in this report. 2. Project charter for the chosen case project Name of the project: Implementation of Information system in Woolworths Limited Project goal To design an automated system over manualdata management system existing that is already existing in Woolworths Limited Project objectives To develop a secured automated Information System (IS) for the company To gain huge numbers of consumers from Australia and New Zealand through both the
3PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES online and offline business operations To reduce the overall rate of business level risks Projectbudget:Thetotalbudget estimated for the project is $ 54,000 Projectduration:Theprojectisexpectedtobe completed within 6 months Project scope After analyzing the existing operational and functional issues of Woolworths Limited an Information System (IS) is required to be designed. With the help of IS the company will be able to serve a secured system to their consumers in terms of reduced rate of risks and time efficiency. Inordertoretrieveanyinformationandfinancialconsumerdetailstheissuesoftime consumptions will be diminished. Through the help of the final project document the goal and objectives of any specific project will become more prominent to the project manager and other members associated to the team. Project assumptions It has been assumed that the project will be completed within 6 months and according to the detail design of the Information System (IS), the project needs $54,000 budget for its successful completion. The consumers will be able to book for their desired food products online and also can also pay online with secured payment options. Project Milestone The project is expected to be completed through following five different phases such as project initiation, project planning, execution, control and monitoring and closure. The details of the project team members are as follows: Milestone 1: project initiation phase completed 0 daysThu 7/19/18 Thu 7/19/186Project manager$0.00 Milestone 2:0 daysTueTue12operation$0.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES project planning phase completed8/28/188/28/18manager Milestone 3: Completion of project execution phase 0 daysFri 11/23/18 Fri 11/23/1818Project manager$0.00 Milestone 4: project control and monitoring phase completed 0 daysTue 12/25/18 Tue 12/25/1822,23Project manager$0.00 Milestone 5: project closure phase completed 0 daysFri 1/11/19 Fri 1/11/1928Project manager$0.00 3. Systematic literature review Several systematic featuring benefits are associated to Information System. According to Binder, (2016) from the context of emerging technology and emerging innovation the strategic enablers will be able to gain competitive advantages and commercial revenue at the same time. Permana, (2015) stated that, emerging technology has many strategic business level benefits that diminishes the operational and functional project risks. The organizational decision makers can also take quick strategic decisions for their companies to demonstrate the profits of executive skills and commitments as well. The benefit matrix can also be used for demonstrating the profit of IS strategic planning. This specific matrix indicates the necessity of formalized planning process. After the implementation of the IS system four to five months are required to gain formalized benefits from it. Real world business benefits help the employees to understand the effective functional approaches available through the information system and the way through which it increases the business efficiency and effectiveness (Schwalbe, 2015). The Information System has the ability to
5PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES make business integration to support the coordination of work that are associated to different parts of the business organization to measure the way through which the system integration helps the business organization. In order to examine the business issues different models are applied by the business owners. It has been found that there are many business level benefits associated to the implementation of the Information system (Tomanek & Juricek, 2015). The benefits can be generated from the information System (IS) are as follows: Give maximum amount of commercial benefits: In order to gain maximum commercial profit from the company they need to manage their consumers from different geographical boundaries first with an on-time, quality delivery of food products. As much quality food they will be able to deliver to their consumers that much numbers of new consumers they will be able to grab (Machado, Pinheiro & Tamanini, 2015). The capacities of the company will be exploited drastically with the implementation of a strategic and advanced Information System (IS) in the organization. The effectiveness of the overall business will increase a lot with the change of a manual data management system with an automated Information system. Secure online transaction:The Information System (IS) delivers security also and the consumers can easily transit money for their products with cash on delivery or online debit card and credit card payment also. Improved communication approach: The approach of communication will increase a lot with the implementation of the information system in the business organizations. Gathering and distribution of information is a very important part of any organization to make all the employees familiar about the system process details (Hornstein, 2015). The combination if information system and information technologies will effectively help to track the information distribution and
6PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES information projections as well. IS can deliver quick information to the employees and to the consumers whenever, required. Globalization is possible by mitigating the cultural gap within the organization. Availability:The consumers can avail their desired food products at their doorstep regardless of their location and time. They can even book for their products anytime.The business and service delivery approach becomes more convenient. Cost effectiveness and higher productivity: The rate of business effectiveness increases a lot along with a higher level productivity (Joslin & Müller, 2015). It means the consumers can easily ask for their food products and the total price of the product they can also give through online transaction.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES 4. Work Breakdown Structure Information System implemenation in Woolworths Limited Project planning Budget planning Project time scheduling Risk management planning Communication management planning Milestone 2: Completion of project planning phase Project execution Prototype design of the Information system Features incorporation to the Information System coding Modeling Connection to database management system for storing data Incorporating Graphical User Interface Milestone 3: Completion of project execution phase Project control and monitoring phase Unit testing of the Information System Integrated testing of the Information System Acceptance testing of the Information System Milestone 4: Completion of project control and monitoring phase Project closure Project stakeholder’s signoff Final project document submission Post project maintenance planning Milestone 5: Completion of project closure phase Figure 2: WBS of implementation of Information System in Woolworths Limited (Source: Created by author) 5. Development of the schedule plan For developing any project it is crucial for any business organizations to consider a specific project development life cycle methodology. Based on the project details the most suitable project development life cycle should be adopted by the project managers. Among the most widely used project development lifecycles agile, spiral, waterfall are mostly used. The iterative waterfall model cannot proceed further if the previous stage is successfully completed rather all testing and modification should be done at the same design phase. The chances of defect multiplication can be completely reduced with this model. As compared to other
8PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES models this is much effective from the business perspectives. Thus, among these models the company should adopt the iterative waterfall model. The project head and the other stakeholders associated to the project are needed to follow the project schedule to complete the IS implementation project within estimated cost and time. Besides this the resources are also allowed to perform their allotted job roles within budget and time phase also. The details of the time and budget are shown in the below table: WBSTask NameDurationStartFinishPredecessorsResource NamesCost 0 Information System implementation in Woolworths Limited 180 daysMon 5/7/18 Fri 1/11/19$51,840.00 1Project initiation54 daysMon 5/7/18 Thu 7/19/18$15,792.00 1.1Developing project objectives12 daysMon 5/7/18 Tue 5/22/18 Project manager$3,264.00 1.2 Project scope statement preparation 10 daysWed 5/23/18 Tue 6/5/182operation manager$2,800.00 1.3Requirements gathering12 daysWed 6/6/18 Thu 6/21/18$4,608.00 1.3.1 Project functional requirements gathering 12 daysWed 6/6/18 Thu 6/21/183 development team members $1,728.00 1.3.2 Non functional requirements gathering 12 daysWed 6/6/18 Thu 6/21/183system developer$2,880.00 1.4 Consumers business need analysis 20 daysFri 6/22/18 Thu 7/19/185,6system analyst$5,120.00 1.5 Milestone 1: Completion of project initiation phase 0 daysThu 7/19/18 Thu 7/19/187Project manager$0.00
9PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES 2Project planning30 daysFri 7/20/18 Thu 8/30/18$10,256.00 2.1Budget planning10 daysFri 7/20/18 Thu 8/2/188Finance manager$2,000.00 2.2Project time scheduling10 daysFri 8/3/18Thu 8/16/1810Project manager$2,720.00 2.3 Risk management planning 12 daysFri 8/3/18Mon 8/20/1810operation manager$3,360.00 2.4Communication management planning 8 daysTue 8/21/18 Thu 8/30/1812,11Project manager$2,176.00 2.5 Milestone 2: Completion of project planning phase 0 daysThu 8/30/18 Thu 8/30/1813operation manager$0.00 3Project execution61 daysFri 8/31/18 Fri 11/23/18$15,520.00 3.1 Prototype design of the Information system 46 daysFri 8/31/18 Fri 11/2/18$9,760.00 3.1.1 Features incorporation to the Information System 26 daysFri 8/31/18 Fri 10/5/18$6,880.00 3.1.1.1coding10 daysFri 8/31/18 Thu 9/13/1814system developer$2,400.00 3.1.1.2Modeling16 daysFri 9/14/18 Fri 10/5/1818operation manager$4,480.00 3.1.2 Connection to database management system for storing data 20 daysMon 10/8/18 Fri 11/2/1819 development team members $2,880.00 3.2 Incorporating Graphical User Interface 15 daysMon 11/5/18 Fri 11/23/1817,20 development team members ,sys tem developer $5,760.00 3.3Milestone 3: Completion of project execution 0 daysFri 11/23/18 Fri 11/23/18 21Project manager $0.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES phase 4 Project control and monitoring phase 22 daysMon 11/26/18 Tue 12/25/18$7,328.00 4.1 Unit testing of the Information System 10 daysMon 11/26/18 Fri 12/7/1822system tester$2,240.00 4.2 Integrated testing of the Information System 10 daysMon 12/10/18 Fri 12/21/1824system developer$2,400.00 4.3 Acceptance testing of the Information System 12 daysMon 12/10/18 Tue 12/25/1824system tester$2,688.00 4.4 Milestone 4: Completion of project control and monitoring phase 0 daysTue 12/25/18 Tue 12/25/1825,26Project manager$0.00 5Project closure13 daysWed 12/26/18 Fri 1/11/19$2,944.00 5.1 Project stakeholder’s signoff 2 daysWed 12/26/18 Thu 12/27/1827Project manager$544.00 5.2 Final project document submission 6 daysFri 12/28/18Fri 1/4/1929operation manager$1,680.00 5.3 Post project maintenance planning 5 daysMon 1/7/19 Fri 1/11/1930 development team members $720.00 5.4 Milestone 5: Completion of project closure phase 0 daysFri 1/11/19 Fri 1/11/1931Project manager$0.00
11PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES Figure 2: Gantt chart of implementation of Information System in Woolworths Limited (Source: Created by author)
PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES11 6. Network diagram for the chosen case project Modeling Start: Mon 7/2/18ID:11 Finish: Mon 7/23/18Dur: 16 days Res:operation manager Budget planning Start: Mon 5/7/18ID:2 Finish: Fri 5/18/18Dur: 10 days Res:Finance manager Project time scheduling Start: Mon 5/21/18ID:3 Finish: Fri 6/1/18Dur: 10 days Res:Project manager Milestone2:Completion of project planning phase Milestone Date: Fri 6/15/18 ID: 6 Acceptance testing of the Information System Start: Tue 9/25/18ID:18 Finish: Wed 10/10/18Dur: 12 days Res:system tester Risk management planning Start: Mon 5/21/18ID:4 Finish: Tue 6/5/18Dur: 12 days Res:operation manager Incorporating Graphical User Interface Start: Tue 8/21/18ID:13 Finish: Mon 9/10/18Dur: 15 days Res:development team members , system developer Milestone3:Completion of project execution phase Milestone Date: Mon 9/10/18 ID: 14 Unit testing of the Information System Start: Tue 9/11/18ID:16 Finish: Mon 9/24/18Dur: 10 days Res:system tester Milestone4:Completion of project control and monitoring phase Milestone Date: Wed 10/10/18 ID: 19 Connection to database management system for storing data Start: Tue 7/24/18ID:12 Finish: Mon 8/20/18Dur: 20 days Res:development team members Final project document submission Start: Mon 10/15/18ID:22 Finish: Mon 10/22/18Dur: 6 days Res:operation manager Post project maintenance planning Start: Tue 10/23/18ID:23 Finish: Mon 10/29/18Dur: 5 days Res:development team members Integrated testing of the Information System Start: Tue 9/25/18ID:17 Finish: Mon 10/8/18Dur: 10 days Res:system developer Milestone5:Completion of project closurephase Milestone Date: Mon 10/29/18 ID: 24 Project stakeholder’s signoff Start: Thu 10/11/18ID:21 Finish: Fri 10/12/18Dur: 2 days Res:Project manager coding Start: Mon 6/18/18ID:10 Finish: Fri 6/29/18Dur: 10 days Res:system developer Communication management planning Start: Wed 6/6/18ID:5 Finish: Fri 6/15/18Dur: 8 days Res:Project manager Figure 3: Network Diagram of implementation of Information System in Woolworths Limited (Source: Created by author)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES12 References Binder, J. (2016).Global project management: communication, collaboration and management across borders. Routledge. Boud, D., Cohen, R., & Sampson, J. (Eds.). (2014).Peer learning in higher education: Learning from and with each other. Routledge. Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management. Project Management Institute. Gold, B., & Vassell, C. (2015, November). Using risk management to balance agile methods: A study of the Scrum process. InKnowledge-Based Engineering and Innovation (KBEI), 2015 2nd International Conference on(pp. 49-54). IEEE. Harrison,F.,&Lock,D.(2017).Advancedprojectmanagement:astructured approach. Routledge. Heagney, J. (2016).Fundamentals of project management. AMACOM Div American Mgmt Assn. Hornstein, H. A. (2015). The integration of project management and organizational change managementis now a necessity.InternationalJournal of Project Management,33(2), 291-298. Joslin,R.,&Müller,R.(2015).Relationshipsbetweenaprojectmanagement methodologyandprojectsuccessindifferentprojectgovernance contexts.International Journal of Project Management,33(6), 1377-1392.
PROJECT MANAGEMENT FUNDAMENTALS AND PRACTICES13 Kerzner, H., & Kerzner, H. R. (2017).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Kerzner, H., & Kerzner, H. R. (2017).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Machado, T. C. S., Pinheiro, P. R., & Tamanini, I. (2015). Project management aided by verbal decision analysis approaches: a case study for the selection of the bestSCRUMpractices.InternationalTransactionsinOperational Research,22(2), 287-312. Permana, P. A. G. (2015). Scrum method implementation in a software development project management.International Journal of Advanced Computer Science and Applications,6(9), 198-204. Schwalbe, K. (2015).Information technology project management. Cengage Learning. Spundak, M. (2014). Mixed agile/traditional project management methodology–reality or illusion?.Procedia-Social and Behavioral Sciences,119, 939-948. Tomanek,M.,&Juricek,J.(2015).Projectriskmanagementmodelbasedon PRINCE2 and SCRUM frameworks.arXiv preprint arXiv:1502.03595. Turner, R. (2016).Gower handbook of project management. Routledge. Verzuh, E. (2015).The fast forward MBA in project management. John Wiley