logo

PPMP20008 Work Breakdown Structure and Work Package

7 Pages844 Words99 Views
   

Planning and Initiating Projects (PPMP20008)

   

Added on  2020-02-18

PPMP20008 Work Breakdown Structure and Work Package

   

Planning and Initiating Projects (PPMP20008)

   Added on 2020-02-18

ShareRelated Documents
Running head: WORK PACKAGEProject Name: Our language is importantName of the Student:Name of the University:
PPMP20008 Work Breakdown Structure and Work Package_1
1 WORK PACKAGETable of Contents1. Work Package..............................................................................................................................21.1. Signature Block........................................................................................................................21.2. Descriptions..............................................................................................................................21.3. Joint Agreements......................................................................................................................31.4. Tolerances.................................................................................................................................41.5. Reporting Arrangements...........................................................................................................41.6. Problem Handling and Escalation............................................................................................41.7. Extracts or References..............................................................................................................41.8. Approval Methods....................................................................................................................5Bibliography....................................................................................................................................6
PPMP20008 Work Breakdown Structure and Work Package_2
2 WORK PACKAGE1. Work Package1.1. Signature Block Project ManagerName RoleOrganization Ethan DodsProject ManagerNAIDOC CommitteeSignature: Ethan DodsDate: 06/09/2017Work Package TeamLeaderName RoleOrganization Emma RubensohnTeam Leader University Signature: Emma RubensohnDate: 06/09/2017 1.2. Descriptions Project Name: Our Language is Important Work package ID: 2.2.1.Work package name: Revise the sign boards with indigenous languageWork packagedescription:The project for “our language is important is aimed at including theindigenous language in the university sign board. In this particular workpackage, the existing sign boards are revised with additional descriptionof the message written in indigenous language. Person authorized: The team members associated with the project are authorised for makingthe change in an efficient and accurate manner. Techniques, Processesand ProceduresFor this work package the workers collaborate with the fluent speakers ofthe indigenous language. Based on the dialect and information obtainedfrom the fluent speakers, the existing information of the sign boards arereplaced with the indigenous language. Development InterfacesSign Boards Operations andMaintenance InterfacesFor the maintenance and operations of the undertaken project theuniversity authorities have collaborated with the NAIDOC committee. ConfigurationManagementRequirementsRevision of the exiting sign boards and campus signs are revised with thedifferent indigenous languages for the undertaken project.
PPMP20008 Work Breakdown Structure and Work Package_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
WORK PACKAGE 1 WORK PACKAGE: Our Language is Important
|6
|680
|141

Case Study Project Management
|6
|970
|150

PPMP20008 Work Breakdown Structure docx.
|6
|998
|34

PPMP20008 Work Breakdown Structure and Work Package Assignment
|7
|967
|132

Project Documentation Work Package Assignment
|7
|1461
|154

Assignment | Project Management Concepts
|11
|2330
|160