Table of Contents INTRODUCTION...........................................................................................................................1 MAIN BODY...................................................................................................................................1 Giveanoverviewofthecurrentoperationalsystemsinplacetofacilitateinternal communications and connect data..........................................................................................1 Give reasoned recommendations to improve and/or add to these operational systems. Support your recommendations with high-quality evidence where possible.......................................4 Project Plan to implement your operational recommendations, including, at minimum, a WBS (Work Breakdown Structure), Risk Management Plan and proposed Budget.......................5 CONCLUSION..............................................................................................................................12 REFERENCES..............................................................................................................................13
INTRODUCTION Operations management is regarded as an administration of business activities for creating largest level of effectiveness possible into entities. This is mostly concerned with transforming raw material as well as labour into products and services as efficaciously which is helpful to enhance organisational profitability (Alias and et. al., 2014). On the other side, project management is referred as the practices of initiating, planning, implementing, controlling as well as closing team work to attain particular objectives as well as accomplish particular criteria ta certain time duration. It is essential in entities as this assures what is being delivered is appropriate and will be generate real value in comparison to business opportunity.As per the given case study, the undertaken organisation for this report is Luton Town Residences (LTR). It is a part of The Anacreonte Group of properties which is operating from year 1967 and it located in United Kingdom. The purpose of this report is to provide an overview of current operational systems into a place to provide internal communication. Moreover, recommendation are given to improve those operational systems. Apart form this, a project management plan is developed to implement that recommendations are also discussed in this report. MAIN BODY Giveanoverviewofthecurrentoperationalsystemsinplacetofacilitateinternal communications and connect data. Operational system is the term that is mainly utilised into data warehousing which is refer to a system that applied for processing their regular transaction of entities. Moreover, these systems are basically developed in a way so that firm can processed their regular transactions which is performed in effective as well as the integrity of transactional data is preserved (Beringer, Jonas and Kock, 2013). As Luton Town Residences (LTR) is a part of The Anacreonte Group of properties and which is a family run business. Its main operations is facilitating self catering long stay rooms for at least one month which includes triple rooms, twin rooms, double rooms and single room. Within their whole rooms they provides an en-suite shower rooms,, fully equipped kitchenette and free wifi internet connection. In addition to this, their management generally a complementary coffee or tea and also not any breakfast are served as overall rooms were self catering. Also, for the convenience of customers 24*7 hour receptions are available and free taxi calling services.Moreover, the process of booking rooms through 1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Luton Town Residences (LTR), customers have to visit to its site and click on book now enter date from starting to till it stays. Also, all its booking information and data which includes customer's name, address, phone number and many other are kept into their computers or system software. Apart from all this their current front office or their sales or marketing operations consists check in time, check out time, billing, take information related to booking which is done through online and many others. Also, their human resource operations involved managing document of customers that is asked during check in such as copy of driving license, pan card and others. Moreover, in its accommodation operations cleanliness across areas are included. All thesecurrentoperationsofLutonTownResidences(LTR)assiststheminenhancing profitability, sales, customer experiences and many more. So, it is essential for them to manage their overall operations. For instance, respective organisation used some operations management theories as well as concepts that are discussed below: Total quality management:This is considered as a theory that is developed through William Deming who is a management consultant. It is referred as a continuous procedures of minimising as well as detecting errors into supply chain management, production, improving consumer experiences as well as assuring that staff are upgraded with training (Binder,2016). Moreover, quality is undertaken as an advantage as well as necessity of market competitiveness. So total quality management is defined as a system that guarantees a stipulated quality. In addition to this, it is a structured approach to whole management of firms. The concentration of proceduresistoimprovequalityofoutputsrelatedtogoodsorservicesbycontinual improvement of internal operations. Also, this is advantageous for both entities as well as staff as wholeemployeeshaveconcentrationuponqualitymanagementaswellascontinuous improvement,, firm may set up I and uphold the cultural values which develops long- term success for bot consumers and entities as well. In context of Luton Town Residences (LTR), they are providing services related to self catering long stay rooms such as single bedrooms, double bedrooms, twin rooms and triple rooms. So, as the respective organisation are facilitating a kind of accommodation services so the total quality management aids them to improved their business operations in effective and efficient manner. Moreover, it is also beneficial for them in satisfying consumers as high quality services accomplish the requirements of its clients that outcomes into higher satisfaction and this ultimately leads towards maximising their market share, revenue growth as well as also increased word of mouth marketing which maximised its profitability. 2
Also, for all these the whole members of respective organisation have to do the internal communication in effective way so that all these are to be performed in more efficacious manner for the beneficial of the company. Six sigma:This is considered as a quality control theory which is established in year 1986 through Motorola, Inc. It emphasizes cycle time improvement. In simple term, this is referred as a method to work in faster way with some mistakes (Heldman,2018). Moreover, this is referred as disciplined business methodology to enhance consumer satisfaction as well as profit through streamlining its operations, improving quality as well as obviating errors within each and every organisational process. In addition to this, the two main methodologies are DMAIC as well as DMADV. Both have their own set of recommended process that has to be executed for business transformation. DMAIC is considered as a data driven methods thatis utilised for improving existent services for better consumer satisfaction. It includes five phases such as define, measure, analyse, improve and control. It is basically used into producing products or delivering services. The another one is DMADV is defined as a part of design for six sigma procedures which is utilised for designing various procedures of service delivery or product manufacturing. It also consist five phase that are define, measure, analyse, design and validate. This is mostly utilised when the existent procedures do not accomplish the conditions of its consumers, even after optimisation or when this is needed to improve new procedures. In context of Luton Town Residences (LTR), they can applied the DMAIC methodology as this help them to improve their existent services as well as operations in order to satisfy their customers effectively and efficaciously. The six sigma is helpful into the operations related to front office and marketing such as this minimises time during peak check in and check out, obviating bills errors as well as improve accuracy. Moreover, into their operations of human resources it aids into payroll accuracy, managing document, minimising turn around recruitment time, relieving time, enhance staff satisfaction rate. In respect of accommodation operations, six sigma aids in decreasing turn around the time of turning down a room, standardisation of cleanliness in all over areas. Internal communication is very much important for the operational system as without this the operations of the organisation can not be performed in effective manner and attained their objectives is profitable way (Kerzner, 2017). Moreover, thisis defined as a transformation of information among the staff members of organisations. This takes place across overall levels as 3
well as organisational units of entities.Within Luton Town Residences (LTR), they are performing the operations related to front office, marketing, accommodations and others. So, for allthistheyhavetodointernalcommunicationineffectiveway.Aseffectualinternal communication allows whole employees of entities to work collaboratively towards a common objectives. Such as in Luton Town Residences (LTR), it is vital for marketing to communicate with another so that the operation related to accommodation, human resources and others are accomplished efficaciously. Moreover, it is also vital for them to connect their data effectively with the help of some software as well as hardware. So that they may manage their operations in more efficient manner. Give reasoned recommendations to improve and/or add to these operational systems. Support your recommendations with high-quality evidence where possible. As Luton Town Residences (LTR) basically providing self catering long stay rooms so they are performing various operations related to human resource, accommodations, marketing,, booking system and others. As they are not able to accomplish the requirements of customers so respective organisation have to improve their operational system. Some recommendation for improving as well as adding operational system of Luton Town Residences (LTR) are discussed below: ď‚·It is recommended to respective organisation that they may improve their booking system in more efficient way through E- mailing re-market with exclusive offers, doing on- site re- engagement notification for showing existent information, upgrading their booking software and many more. As an offers they provide discounts to their customers (Maylor, Turner and Murray-Webster, 2015). Due to upgrading their booking system they may minimise the risk of over booking of rooms. ď‚·Moreover, this is also recommended that they can open the gym facilities in the areas where they are facilitating rooms. So that the person who are very much concern about theirfitnesscanavailthisfacilitiesandalsoitattractsmorecustomerstowards themselves which will outcomes into enhanced profitability. ď‚·This is also recommended that Luton Town Residences (LTR) have to improve their internal communication through conductingweekly meetings, organising some kind of events and programmes for their staff members. So all of them become friendly can can easily communicate with one another as well as share information in more effective way. 4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
ď‚·In addition to all this, it is also recommendation to Luton Town Residences (LTR) they have to apply the total quality management approaches and six sigma approaches as this helps theminto the operations related to front office and marketing such as this minimises time during peak check in and check out, obviating bills errors as well as improve accuracy (MĂĽller and et. al., 2014). Moreover, into their operations of human resources it aids into payroll accuracy, managing document, minimising turn around recruitmenttime,relievingtime,enhancestaffsatisfactionrate.Inrespectof accommodation operations, six sigma aids in decreasing turn around the time of turning down a room, standardisation of cleanliness in all over areas. ď‚·Also, through using six sigma methodology such asDMAIC that aredefine, measure, analyse, improve and control. As through this they can able to identify their problem statement or issues thereafter measures the current system, analysing the root cause of that problems, improving that and at last controlling them in more effective way. All these are helpful in improving existent services for better consumer satisfaction, or experiences so they suggest another individuals about themselves. ď‚·With the help of total quality management Luton Town Residences (LTR), they may able to satisfy its consumers as high quality services accomplish the requirements of its clients that outcomes into higher satisfaction and this ultimately leads towards maximising their market share, revenue growth as well as also increased word of mouth marketing which maximised its profitability. Also,as communication, co-operation and coordination between various departments are three major components of TQM. Increasing customer preferenceshasledtoadrasticchangeintheprocessofTQMinhotels.The accommodation service providers have got an advantage of increasing their profits by offering products and services that are of high quality and affordable prices which has in turn led to attracting a large number of potential customers (Pemsel and Wiewiora, 2013). The companies have improved the quality of their overall services like minimising mistakes that is done by the company by making all the processes more efficient. Project Plan to implement your operational recommendations, including, at minimum, a WBS (Work Breakdown Structure), Risk Management Plan and proposed Budget. Project plan is considered as a formal document that is prepared for guiding the control as well as implement project. It is a key to successful project as well as is most effective document 5
which required to be developed when initiating any business project. Moreover, this describes a parameters as well as intent of individuals business project (Sears and et. al., 2015). This states that why the plan is being executed as well as an ultimate intent of plan will be provides. Also, it considered as tools to keep each and every one associated with project upon track as well as concentratinguponsimilarinformationanddetailsaswell.Inrespectoftheabove recommendation the project management plan is prepared throughLuton Town Residences (LTR) are discussed below: Project initiation:This is considered as stage of project as well as includes feasibility and project value. This consists tow techniques that aids project manger either to perform out project practices or not. These are: Feasibility study:In this, the manager find as well as measure project budget that is going to execute. With these, project objective and timeline is decided. In respect ofLuton Town Residences (LTR), project manager have to describe time duration as well as project intent to staff so that there should not be any confusion and plan is accomplished at certain time duration. So for this,ď‚·Scope: This is considered as a vital aspect of project plan as this involves exact scope of projectin respect of entities. So, as per the recommendation the scope for Luton Town Residences (LTR) is board as they are planning to upgrade their booking system due to which they may able to minimise the chances of overbooking of rooms. As due to this, respective organisation customers so not have to face much problems which results into enhancing customer experiences.ď‚·Time: This is also regarded as a essential aspects of project plan as it is needed for accomplishing the overall project at certain time period. So, this has been examine that for implementing all things in effective manners the project manager needs approx 2 months. Also, this assists project manager and organisation to obtain gainful outcomes at specified time period. ď‚·Quality: This is considered as an crucial aspects as it is important for organisation to maintain the quality of services that they are facilitating to customers in order to obtain optimistic results. Project planning:This phases is undertaken when the formal document are approved through senior authorities of firm (Stevensonand Sum, 2014). It includes practices associated to 6
project that will be perform at which time and budget. This facilitates direction regarding how to face risks, procure outputs of quality and others. Moreover, this aids Luton Town Residences (LTR) manager to overcome with those challenges during respective project implementation. Project execution:In this, whole practices and operations are planned to execute through subordinates at this phases. The implementation takes place of whole deliverable for satisfying consumers as well as obtain success into project. In context ofLuton Town Residences (LTR), the team of management execute overall recommendations through delegating the resources as well as responsibilities to staff effectively. Projectmonitoring&control:Herein,thehigherauthoritiescheckseitherthe operations of respective project is appropriately implemented or not. Moreover, it measure the employees performance according to its set standards (Swink and et. al., 2017). It will aids Luton Town Residences (LTR) team management to work as per recommendation effectively and in specified way. Project closure:in this phases, the entities deliver project to consumers as well as team members that is formed for accomplishment of project and thereafter get disbursed. In context to Luton Town Residences (LTR), the management team of project have to measure whole documents as well as get project accomplished successfully. In addition to this, entities also facilitates advantages so that staff may perform with full efforts in upcoming times also. Work break down structure Workbreakdownstructureisreferredasadeliverableorientedhierarchical decomposition of task that is to be implemented through project team for accomplishing the specific project objectives and develop a needed deliverables. Moreover this is produced to set up a common understanding of project scope. This is a hierarchical explanation of work which have to be performed to accomplish project deliverables.In respect to present project, the project manager has to formulate appropriate work breakdown structure for supporting factor to project manager which will develops things in simpler for them as well as facilitates equal support to accomplish its project objectives in faster manner. Risk management plan Risk management planis considered as a document which a project manager develops to anticipate the risks, estimate affects as well as explain responses towards risk. This also includes a matrix related to risk assessment (Too and Weaver, 2014). Moreover,A risk management plan 7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
can be defined as a document that is prepared by a project manager in order to identify risks and uncertainties, analyse their potential impacts and then define the responses or actions that can be taken to address them. A risk management plan should be reviewed at constant intervals by the project team within an organisation to avoid any kind of risk getting unnoticed. The plan usually consists of five stages like identifying the uncertainty or risk, analysing and evaluating it, treating the same and finally monitoring and reviewing the risk. This reduces the chances of the risk being getting avoided by the company as the main purpose of the plan is to identify problems before they occur and impact the operations of the business.This is prepared into Luton Town Residences (LTR) so thatthey can able to identify, examine as well as responding towards threats related to project. Descriptionof risk Likeliho od ImpactOwnerMitigationContingencyPre acti on weig htin g scor e Post acti on wei ghti ng scor e Inappropriate communication amongstaff members highhighProject manage r Themanagers have to comply functional structure where whole staff may able to interact withanother oneineasier mannerasit aidsthemto minimiserisk of communication Not communicating effectively,the projectof entitiesremain incompleteor too much time consuming. 7 out of 10 8 out of 10 8
. Riskthatis associatedwith timeconsuming practices LowerModerateProject manage r Theyhaveto developa scheduleas wellas arrangementof all the practices as well as give more preferences that mayaidsin operating business practicesat particulartime. This minimises risk. In case project isverymuch time consuming thenthismay becostlyfor entities. 6 out of 10 7 out of 10 Usagesofnew technologyas wellas operational system HigherHigherTechnic aland operati onal director Formitigating theparticular risk,the managerhave toutilisea effective systemor approachthat may aids to do taskand accomplish project efficiently. It may develop risk for LTR as theyhaveto spendmore capitalupon updated technologyfor accomplishing project. 7 out of 10 9 out of 10 9
Lower managementand inappropriate arrangementof employees ModerateLowOperati onal manage r For minimising risk,LTR requiredto assigntask among staff as pertheir capabilityand abilityto manage system as well as face challenges. For accomplishing anyproject thereis requirementof proficientstaff as well as HR managerthat mayableto takedecision. So,within respective organisation because of lack ofnot proficient employees project may be accomplished effectively. 7 out of 10 9 out of 10 Proposed budget Budget is regarded as a categorical list of anticipated costs of project which shows the principal investigators best estimation of funds which is required to support the task explained into a proposal. Moreover, a budget includes overall direct cost, administrative and facilities costs as well as cost sharing commitments proposed (Turner, 2016). The proposed budget is simply means a five year budget which states capital expenditures as well as another operating spendings. So, Luton Town Residences (LTR) prepared as proposed budget for improving plan of its operational systems which are discussed below: 10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
EXPENSESAMOUNT One Time Set-Up Costs: Rent Deposit1600 Furniture & Fixtures3500 Equipment3750 Build-out/ Renovations3200 Decorating, Painting and Remodelling1200 Installation of Fixtures & Equipment900 Starting Inventory1750 Deposits with Public Utilities1150 Legal and Other Professional Fees750 License and Permits550 Advertising and Promotion390 Consulting410 Software350 Cash2600 Total Costs:22100 Monthly Expenses: Bank Charges125 Debt Service (Principal & Interest)1900 Insurance1300 Membership & Dues1100 11
Maintenance & Repairs950 Marketing & Promotion: Advertising850 Marketing & Promotion: Other650 Miscellaneous320 Payroll: Wages (Owner/ Manager)2800 Payroll: Wages (Employees)2900 Payroll Tax1300 Professional Fees: Accounting1500 Professional Fees: Legal1700 Professional Fees: Other840 Rent3500 Subscriptions980 Supplies: Office1100 Supplies: Operating1210 Telephone1100 Utilities150 Total Monthly Expenses:26275 TOTAL FUNDS REQUIRED:48375 CONCLUSION As per the above report, it has been concluded that the both operations and project management are essential within an organisation. As they are helpful for them in assuring that what is delivering is effective or not and also it give real value against business opportunity. Moreover, this aids into efficacious utilisation of resources such as raw material, labour, money and another resources as well as this also improve organisational productivity. Also, various operational system which is helpful in facilitate internal communication as well as connecting 12
data. For managing the operations of organisation, they may utilise operation and project management techniques such as total quality management and six sigma. As this assists them to improve quality of outputs related to goods or services by continual improvement of internal operations, to enhance consumer satisfaction as well as profit through streamlining its operations, improving quality as well as obviating errors. Also the recommendation which is aids to improve operational system. In addition to this, project management plan, risk management plan, budget and work breakdown structure are prepared for implementing the verbal plan into practically in more efficient manners so that they can able to attain objectives effectively. 13
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
REFERENCES Books and journal Alias, Z. and et. al., 2014. Determining critical success factors of project management practice: A conceptual framework.Procedia-Social and Behavioral Sciences.153.pp.61-69. Beringer, C., Jonas, D. and Kock, A., 2013. Behavior of internal stakeholders in project portfolio managementanditsimpactonsuccess.InternationalJournalofProject Management.31(6). pp.830-846. Binder, J., 2016.Global project management: communication, collaboration and management across borders. Routledge. Heldman, K., 2018.PMP: project management professional exam study guide. John Wiley & Sons. Kerzner, H., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Maylor, H., Turner, N. and Murray-Webster, R., 2015. “It worked for manufacturing…!”: Operationsstrategyinproject-basedoperations.InternationalJournalofProject Management.33(1). pp.103-115. Müller,R.andet.al.,2014.Understandingprojectsuccessthroughanalysisofproject management approach.International journal of managing projects in business. Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in project- based organisations.International journal of project management.31(1). pp.31-42. Sears, S. K. and et. al., 2015.Construction project management. John Wiley & Sons. Stevenson, W. J. and Sum, C. C., 2014.Operations management. McGraw-Hill Education. Swink, M. and et. al., 2017.Managing operations across the supply chain. New York, NY: McGraw-Hill Education. Too, E.G . and Weaver, P., 2014. The management of project management: A conceptual framework for project governance.International Journal of Project Management.32(8). pp.1382-1394. Turner, R., 2016.Gower handbook of project management. Routledge. Uhl, A. and Gollenia, L.A. eds., 2016.A handbook of business transformation management methodology. Routledge. Verzuh, E., 2015.The fast forward MBA in project management. John Wiley & Sons. 14