Project Management

EXECUTIVE SUMMARYThe given report is based on project management including several aspects includinginitiating, planning, controlling and finishing particular project correctly. It involves to utilisevarious techniques and tools which are suitable for conducting specific tasks in proper manneralong with gaining desired outcomes. This assignment is based on Birmingham Campus in orderto complete project of fully refurbishment having an aim to provide excellent learningenvironment top students as well as staff. It will focus on project initiation document and riskregister which helps to manage them in accurate way. In addition to this, several approaches ofrisk management are also described below.

Table of ContentsEXECUTIVE SUMMARY.............................................................................................................2INTRODUCTION...........................................................................................................................1MAIN BODY...................................................................................................................................11. Project initiation document.....................................................................................................12. Risk register............................................................................................................................33. Project plan..............................................................................................................................44. Report to project sponsor........................................................................................................8CONCLUSION..............................................................................................................................10REFERENCES..............................................................................................................................12

INTRODUCTIONProject management refers to a discipline of initiating, planning, executing, controllingand closing particular task to gain desired goals and objectives. It can be considered as anapplication of procedures, methods, knowledge, skills and experience to achieve set targets ofproject in accurate manner. Moreover, it involves the criteria of managing resources, budget,risks and procedures to complete specific project properly (Braglia and Frosolini, 2014). Thepresent report is based in Birmingham Campus (London Campus) and planning of fullrefurbishment of its teaching rooms and computing labs by QA Higher Education (QAHE). Thisassignment will focus on project initiation document, work breakdown structure and risk registerfor managing them in correct way. It will also include risk management approach andeffectiveness of Prince 2 methodology.MAIN BODY1. Project initiation documentThe project initiation document can be described as an important artefacts which providesinformation about essential activities or procedures which should be carried out in accurate wayto gain required outcomes. It includes more effective as well as techniques or methods whichfacilitates to initiate efforts of staff member sin correct direction in order to attain better results.However, as per case of Birmingham campus, they are planning for improving wholeinfrastructure including software and hardware in terms of providing better learning environmentto both students as well as staff (Bucero and Englund, 2015). In addition to this, it is necessary toprepare project initiation document for Birmingham Campus in order to complete their project offully refurbishment in proper manner. There are several activities which are required to beinclude in project initiation document and these are given below – Objectives – This refers to main objective of project for which different activities andprocesses are carried out with effective techniques. In context of Birmingham Campus, they arehave an objective to fully refurbishment of teaching rooms and computing labs in order toprovide excellent learning environments to students and staff. Moreover, it involves innovativesoftware, hardware network infrastructure and classrooms furniture along with improving ITdesk.1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Assignment : Roehampton
|30
|3769
|35

Project Management - QA Higher Education
|27
|5932
|456

Report on Understanding Phases of Project Management
|16
|3764
|157

Project Management: PID and Stakeholder Analysis
|18
|3189
|77

(DOC) Quality Assurance in Higher Education
|16
|3126
|220

Project Management - Stakeholder
|15
|3618
|53