This project aims to develop an education package for new graduate nurses in general practice to provide primary healthcare to rural and indigenous communities. The project will include the development of a primary healthcare framework, training programs for nurses, and the deployment of trained nurses to rural areas. The goal is to improve healthcare access and outcomes for the rural and indigenous population.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Plan
Template & Guide
What is a Project Plan?
A Project Plan is the management document for the project. It is owned, maintained and utilised by the
Steering Committee to ensure the delivery of project outputs/deliverables and for the realisation of project
outcomes.
Why would you develop a Project Plan?
A Project Plan is developed to provide:
an overview of all the project components; how you intend to produce the outputs/deliverables
and a brief description of the roles and responsibilities of each of the stakeholders;
the project’s sponsor/steering committee/senior management with a documented framework
for the delivery of defined project objectives and the effective monitoring of the project from
start to finish; and
a formalised agreement between the Project Sponsor/Steering Committee/Senior Management
and the Project Manager of what needs to be delivered and when.
When would you develop a Project Plan?
Approval to develop a Project Plan for a small project may come from senior management or be
obtained from the acceptance or approval of a preceding stage such as a Project Proposal, or Project
Business Case.
What you need before you start:
Agreement to proceed with the development of the Project Plan from the Project Sponsor.
(Assume this has already been received.)
Knowledge and understanding of project planning, scope definition, stakeholder identification,
risk identification and the development of work breakdown structures.
Awareness of the organisation’s corporate strategies &/or goals.
What you will have when you are finished:
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 1 of 25
Template & Guide
What is a Project Plan?
A Project Plan is the management document for the project. It is owned, maintained and utilised by the
Steering Committee to ensure the delivery of project outputs/deliverables and for the realisation of project
outcomes.
Why would you develop a Project Plan?
A Project Plan is developed to provide:
an overview of all the project components; how you intend to produce the outputs/deliverables
and a brief description of the roles and responsibilities of each of the stakeholders;
the project’s sponsor/steering committee/senior management with a documented framework
for the delivery of defined project objectives and the effective monitoring of the project from
start to finish; and
a formalised agreement between the Project Sponsor/Steering Committee/Senior Management
and the Project Manager of what needs to be delivered and when.
When would you develop a Project Plan?
Approval to develop a Project Plan for a small project may come from senior management or be
obtained from the acceptance or approval of a preceding stage such as a Project Proposal, or Project
Business Case.
What you need before you start:
Agreement to proceed with the development of the Project Plan from the Project Sponsor.
(Assume this has already been received.)
Knowledge and understanding of project planning, scope definition, stakeholder identification,
risk identification and the development of work breakdown structures.
Awareness of the organisation’s corporate strategies &/or goals.
What you will have when you are finished:
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 1 of 25
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
A complete Project Plan for a project that is ready for acceptance by the Project Sponsor or Project
Steering Committee.
How to use this template?
The template contains sections which may be developed at many levels of detail depending upon the
individual project.
What is the meaning of the different text styles
Several different text styles have been used within the template, as follows:
Text in italics and in green is intended to provide a guide as to the kind of information that can be
included in a section and to what types of projects it may be applicable. Please ensure all italics and
examples are removed before submitting your completed Project plan for Assessment 2. Text in normal
font is intended as examples.
Text in Blue italics is the Assessment task content required. Remove all Blue italics prior to submitting
your assessment.
Table of Contents
NB: The Table of Contents (TOC) uses the MS Word headings Styles “Heading 1” & “Heading 2” to
identify the headings to be used within the TOC.
Each section is separated with a section break. This allows the use of smart headers and changing from
Portrait to Landscape page layouts. Use the show/hide switch “¶” (or Ctrl+* (Microsoft users)) to toggle
the formatting information on/off. It is strongly recommended to maintain the template’s headings as
they are.
Word Count:
Provide a word count for each section where a word count is stipulated. This should be with [Square
brackets] located at the end of each section i.e. [Word count = NNN].
This will not be included in the word count.
Word counts won’t include Headings and subheadings, Tables, and Appendices.
Education Package for New Graduate Nurses in
a General Practice
Project Plan
Your Project title should be short & succinct
Your Organisation
(including Department if applicable)
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 2 of 25
Steering Committee.
How to use this template?
The template contains sections which may be developed at many levels of detail depending upon the
individual project.
What is the meaning of the different text styles
Several different text styles have been used within the template, as follows:
Text in italics and in green is intended to provide a guide as to the kind of information that can be
included in a section and to what types of projects it may be applicable. Please ensure all italics and
examples are removed before submitting your completed Project plan for Assessment 2. Text in normal
font is intended as examples.
Text in Blue italics is the Assessment task content required. Remove all Blue italics prior to submitting
your assessment.
Table of Contents
NB: The Table of Contents (TOC) uses the MS Word headings Styles “Heading 1” & “Heading 2” to
identify the headings to be used within the TOC.
Each section is separated with a section break. This allows the use of smart headers and changing from
Portrait to Landscape page layouts. Use the show/hide switch “¶” (or Ctrl+* (Microsoft users)) to toggle
the formatting information on/off. It is strongly recommended to maintain the template’s headings as
they are.
Word Count:
Provide a word count for each section where a word count is stipulated. This should be with [Square
brackets] located at the end of each section i.e. [Word count = NNN].
This will not be included in the word count.
Word counts won’t include Headings and subheadings, Tables, and Appendices.
Education Package for New Graduate Nurses in
a General Practice
Project Plan
Your Project title should be short & succinct
Your Organisation
(including Department if applicable)
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 2 of 25
Version as at 31 August 2024
Version Date By whom
v 1.0
Complete the table above
Acknowledgements
The contribution of the following individuals in preparing this document is gratefully
acknowledged:
List all contributors/reviewers/developers who may have assisted you in the development of this
project plan. NB: Don’t acknowledge yourself.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 3 of 25
Version Date By whom
v 1.0
Complete the table above
Acknowledgements
The contribution of the following individuals in preparing this document is gratefully
acknowledged:
List all contributors/reviewers/developers who may have assisted you in the development of this
project plan. NB: Don’t acknowledge yourself.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 3 of 25
DOCUMENT ACCEPTANCE and RELEASE NOTICE
This is release is version v 1.0 of the Education Package for New Graduate Nurses in a General
Practice Project Management Plan.
The Project Plan is a managed document. For identification of amendments, each page contains
a version number and a page number. Changes will only be issued as a complete replacement
document. Recipients should remove superseded versions from circulation. This document is
authorised for release once all signatures have been obtained.
Complete the version control below
PREPARED: DATE:___/___/___
(for acceptance) (Your Name, Education Package for New Graduate Nurses in a General
Practice Project Manager)
ACCEPTED: DATE:___/___/___
(for release) (Project Sponsor, name, title)
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 4 of 25
This is release is version v 1.0 of the Education Package for New Graduate Nurses in a General
Practice Project Management Plan.
The Project Plan is a managed document. For identification of amendments, each page contains
a version number and a page number. Changes will only be issued as a complete replacement
document. Recipients should remove superseded versions from circulation. This document is
authorised for release once all signatures have been obtained.
Complete the version control below
PREPARED: DATE:___/___/___
(for acceptance) (Your Name, Education Package for New Graduate Nurses in a General
Practice Project Manager)
ACCEPTED: DATE:___/___/___
(for release) (Project Sponsor, name, title)
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 4 of 25
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Table of Contents
1. Executive Summary...........................................................................................................6
2. Overview...........................................................................................................................7
2.1. Project Title...............................................................................................................7
2.2. Project Background...................................................................................................7
2.3. Project Problem Statement & Project Goal...............................................................7
2.4. Objective(s)...............................................................................................................7
2.5. Output(s) (Deliverables)............................................................................................8
2.6. Outcome(s)...............................................................................................................8
2.7. Exclusions..................................................................................................................8
2.8. Assumptions and Constraints....................................................................................9
3. Scope & Time Management Plans.....................................................................................9
3.1. Methodology of Work Breakdown Structure (WBS) and Activities...........................9
4. Communications & Stakeholder Management Plans.......................................................13
4.1. Summary & Introduction.........................................................................................13
4.2. Communications Management Plan.......................................................................17
4.3. Reporting Requirements.........................................................................................17
5. Project Management Office Structure & Human Resources Plan.....................................18
5.1. Project Organisational Structure.............................................................................18
5.2. Human Resources Management Plan.....................................................................19
6. Budget/Cost Management Plan.......................................................................................20
6.1. Introduction............................................................................................................20
6.2. Project Budget and Cost Plan..................................................................................21
7. Risk Management Plan....................................................................................................25
7.1. Introduction............................................................................................................25
7.2. Risk Categories........................................................................................................25
7.3. A Basic Risk Register................................................................................................27
8. Quality Plan.....................................................................................................................28
8.1. Quality Management Plan.......................................................................................28
9. Project Closure & Outcome Realisation...........................................................................29
10. Appendix 1......................................................................................................................30
11. Appendix 2......................................................................................................................30
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 5 of 25
1. Executive Summary...........................................................................................................6
2. Overview...........................................................................................................................7
2.1. Project Title...............................................................................................................7
2.2. Project Background...................................................................................................7
2.3. Project Problem Statement & Project Goal...............................................................7
2.4. Objective(s)...............................................................................................................7
2.5. Output(s) (Deliverables)............................................................................................8
2.6. Outcome(s)...............................................................................................................8
2.7. Exclusions..................................................................................................................8
2.8. Assumptions and Constraints....................................................................................9
3. Scope & Time Management Plans.....................................................................................9
3.1. Methodology of Work Breakdown Structure (WBS) and Activities...........................9
4. Communications & Stakeholder Management Plans.......................................................13
4.1. Summary & Introduction.........................................................................................13
4.2. Communications Management Plan.......................................................................17
4.3. Reporting Requirements.........................................................................................17
5. Project Management Office Structure & Human Resources Plan.....................................18
5.1. Project Organisational Structure.............................................................................18
5.2. Human Resources Management Plan.....................................................................19
6. Budget/Cost Management Plan.......................................................................................20
6.1. Introduction............................................................................................................20
6.2. Project Budget and Cost Plan..................................................................................21
7. Risk Management Plan....................................................................................................25
7.1. Introduction............................................................................................................25
7.2. Risk Categories........................................................................................................25
7.3. A Basic Risk Register................................................................................................27
8. Quality Plan.....................................................................................................................28
8.1. Quality Management Plan.......................................................................................28
9. Project Closure & Outcome Realisation...........................................................................29
10. Appendix 1......................................................................................................................30
11. Appendix 2......................................................................................................................30
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 5 of 25
Overview
1. Executive Summary
This project is primarily based on the development of a suitable primary healthcare model
for the rural and indigenous people of Australia where people lack health awareness as well
as healthcare services. According to a survey published online, at least 75% people from
rural and indigenous areas do not receive even primary healthcare treatment and die from
diseases at much younger ages than usual. It has also been found that the aboriginal people
are even more affected by the problem as they have various determinants against modern
processes like healthcare and others. Of the main diseases that are extensively noticed in
among these people, the most diseases come from food, water and hygiene. While primary
healthcare is not the ultimate solution to the problem, but it certainly be one strong step
towards the development of good healthcare system in the rural areas. Furthermore, the
development of a primary healthcare will also raise awareness among the rural and
indigenous people so that they accept healthcare services to prevent and cure diseases that
are causing untimely deaths or physical complications among them. The initial plan for the
project is to develop a primary healthcare framework with special training to nurses who will
then able to reach the rural areas and provide primary healthcare to the people in those
regions. In addition to the healthcare framework, a suitable educational infrastructure will
also be developed that will host internship and training programs for the graduate nurses.
The overall primary healthcare infrastructure will be developed with a community based
model with emphasis on the rural and indigenous people of the country.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 6 of 25
1. Executive Summary
This project is primarily based on the development of a suitable primary healthcare model
for the rural and indigenous people of Australia where people lack health awareness as well
as healthcare services. According to a survey published online, at least 75% people from
rural and indigenous areas do not receive even primary healthcare treatment and die from
diseases at much younger ages than usual. It has also been found that the aboriginal people
are even more affected by the problem as they have various determinants against modern
processes like healthcare and others. Of the main diseases that are extensively noticed in
among these people, the most diseases come from food, water and hygiene. While primary
healthcare is not the ultimate solution to the problem, but it certainly be one strong step
towards the development of good healthcare system in the rural areas. Furthermore, the
development of a primary healthcare will also raise awareness among the rural and
indigenous people so that they accept healthcare services to prevent and cure diseases that
are causing untimely deaths or physical complications among them. The initial plan for the
project is to develop a primary healthcare framework with special training to nurses who will
then able to reach the rural areas and provide primary healthcare to the people in those
regions. In addition to the healthcare framework, a suitable educational infrastructure will
also be developed that will host internship and training programs for the graduate nurses.
The overall primary healthcare infrastructure will be developed with a community based
model with emphasis on the rural and indigenous people of the country.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 6 of 25
Overview
2. Overview
2.1. Project Title
Education Package for New Graduate Nurses in General Practice (Rural posting to help the
rural and indigenous people overcome various primary healthcare problems)
2.2. Project Background
The main background of this project involves the shorter life spans of rural and indigenous
people of Australia that mainly happens due to the lack of awareness regarding diseases and
hygiene. According to a survey published online, at least 75% people from rural and
indigenous areas do not receive even primary healthcare treatment and die from diseases at
much younger ages than usual. It has also been found that the aboriginal people are even
more affected by the problem as they have various determinants against modern processes
like healthcare and others. Of the main diseases that are extensively noticed in among these
people, the most diseases come from food, water and hygiene. The project focuses on
solving these problems as well as abolishing the social stigma regarding the healthcare
services in the rural communities and provide appropriate primary healthcare to the rural
and indigenous people.
However, in order to achieve such a goal, it is first required to train graduate nurses in
general practice before they are posted in the rural areas for primary healthcare purposes.
2.3. Project Problem Statement & Project Goal
2.3.1. Project Problem Statement
The main problem that will be addressed through this project is the lack of sufficient training
of nursing graduates in general practice so that they can be posted in the rural areas for the
rural and indigenous primary healthcare initiative. Hence, the focus for this project is
providing the graduate nurses with sufficient training in general practice.
2.3.2. Project Goal
The main goal of the project is to develop a primary healthcare framework with special
training to nurses who will then able to reach the rural areas and provide primary healthcare
to the people in those regions. In addition to the healthcare framework, a suitable
educational infrastructure is also planned to be developed that will host internship and
training programs for the graduate nurses. The overall primary healthcare infrastructure will
be developed with a community based model with emphasis on the rural and indigenous
people of the country.
2.4. Objective(s)
Three SMART objectives of the project are listed as follows.
To develop an educational infrastructure for graduate nurses including an internship
program in which the nurses will be taught about providing primary healthcare
services to the rural areas within the next 1 year
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 7 of 25
2. Overview
2.1. Project Title
Education Package for New Graduate Nurses in General Practice (Rural posting to help the
rural and indigenous people overcome various primary healthcare problems)
2.2. Project Background
The main background of this project involves the shorter life spans of rural and indigenous
people of Australia that mainly happens due to the lack of awareness regarding diseases and
hygiene. According to a survey published online, at least 75% people from rural and
indigenous areas do not receive even primary healthcare treatment and die from diseases at
much younger ages than usual. It has also been found that the aboriginal people are even
more affected by the problem as they have various determinants against modern processes
like healthcare and others. Of the main diseases that are extensively noticed in among these
people, the most diseases come from food, water and hygiene. The project focuses on
solving these problems as well as abolishing the social stigma regarding the healthcare
services in the rural communities and provide appropriate primary healthcare to the rural
and indigenous people.
However, in order to achieve such a goal, it is first required to train graduate nurses in
general practice before they are posted in the rural areas for primary healthcare purposes.
2.3. Project Problem Statement & Project Goal
2.3.1. Project Problem Statement
The main problem that will be addressed through this project is the lack of sufficient training
of nursing graduates in general practice so that they can be posted in the rural areas for the
rural and indigenous primary healthcare initiative. Hence, the focus for this project is
providing the graduate nurses with sufficient training in general practice.
2.3.2. Project Goal
The main goal of the project is to develop a primary healthcare framework with special
training to nurses who will then able to reach the rural areas and provide primary healthcare
to the people in those regions. In addition to the healthcare framework, a suitable
educational infrastructure is also planned to be developed that will host internship and
training programs for the graduate nurses. The overall primary healthcare infrastructure will
be developed with a community based model with emphasis on the rural and indigenous
people of the country.
2.4. Objective(s)
Three SMART objectives of the project are listed as follows.
To develop an educational infrastructure for graduate nurses including an internship
program in which the nurses will be taught about providing primary healthcare
services to the rural areas within the next 1 year
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 7 of 25
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Communications & Stakeholder Management Plans
To develop an internship program for the nursing graduates that will train the nurses
for rural healthcare
To conduct a detailed survey in the rural and indigenous communities in order to
determine the current condition and the main problems and issues that need to be
mitigated
2.5. Output(s) (Deliverables)
The outputs (deliverables) of the project are as follows.
A new general practice training infrastructure for internship training of the graduate
nurses for providing primary healthcare in rural areas and among the indigenous
communities
Posting of the trained nurses in the rural areas for the primary healthcare initiative
2.6. Outcome(s)
The desired outcomes for the project include:
At least 500 graduate nurses deployed at various rural locations in the country for
providing primary healthcare services
Around 200 graduate nurses studying in the general practice internship program
within the next 2 years
2.7. Exclusions
This particular project is specific to the development of primary healthcare infrastructure for
the rural and indigenous communities and hence, it excludes the training of junior doctors
and assignment of doctors in the rural areas. This is not within the realistic targets of the
project and hence, for the project, only the training of nurses is included. Moreover, this
project also excludes the development of training of nurses from grass root level as it will
require the development of a huge infrastructure that will in turn require a huge amount of
investment that is not possible considering the current scope of the project.
2.8. Assumptions and Constraints
2.8.1. Assumptions
It has been assumed in the project that the general practice internship training for the
nurses will be sufficient for them to provide primary healthcare services. Furthermore, it has
been assumed with sufficient awareness campaigns, the indigenous and the rural people will
accept primary healthcare services and will contact the nurses for help in case of diseases or
medical conditions.
2.8.2. Constraints
The main constraint in this project is that most of the graduate nurses are not willing to get
posted in the rural areas and hence, they may not accept the general practice training as
proposed in this project.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 8 of 25
To develop an internship program for the nursing graduates that will train the nurses
for rural healthcare
To conduct a detailed survey in the rural and indigenous communities in order to
determine the current condition and the main problems and issues that need to be
mitigated
2.5. Output(s) (Deliverables)
The outputs (deliverables) of the project are as follows.
A new general practice training infrastructure for internship training of the graduate
nurses for providing primary healthcare in rural areas and among the indigenous
communities
Posting of the trained nurses in the rural areas for the primary healthcare initiative
2.6. Outcome(s)
The desired outcomes for the project include:
At least 500 graduate nurses deployed at various rural locations in the country for
providing primary healthcare services
Around 200 graduate nurses studying in the general practice internship program
within the next 2 years
2.7. Exclusions
This particular project is specific to the development of primary healthcare infrastructure for
the rural and indigenous communities and hence, it excludes the training of junior doctors
and assignment of doctors in the rural areas. This is not within the realistic targets of the
project and hence, for the project, only the training of nurses is included. Moreover, this
project also excludes the development of training of nurses from grass root level as it will
require the development of a huge infrastructure that will in turn require a huge amount of
investment that is not possible considering the current scope of the project.
2.8. Assumptions and Constraints
2.8.1. Assumptions
It has been assumed in the project that the general practice internship training for the
nurses will be sufficient for them to provide primary healthcare services. Furthermore, it has
been assumed with sufficient awareness campaigns, the indigenous and the rural people will
accept primary healthcare services and will contact the nurses for help in case of diseases or
medical conditions.
2.8.2. Constraints
The main constraint in this project is that most of the graduate nurses are not willing to get
posted in the rural areas and hence, they may not accept the general practice training as
proposed in this project.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 8 of 25
Communications & Stakeholder Management Plans
3. Scope & Time Management Plans
3.1. Methodology of Work Breakdown Structure (WBS) and Activities
When a project is broken down into several activities and deliverables, it is known as a work
breakdown structure. The purpose of the work breakdown structure is to divide the project
into activities that can act as mini projects such that they can be used to individual
scheduling and budgeting. These individual schedules and budget are then added up to
determine the final budget and schedule. The work breakdown structure also helps to
determine the critical path of the project that is important to estimate the minimum
duration required to complete the project.
3.1.1.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 9 of 25
3. Scope & Time Management Plans
3.1. Methodology of Work Breakdown Structure (WBS) and Activities
When a project is broken down into several activities and deliverables, it is known as a work
breakdown structure. The purpose of the work breakdown structure is to divide the project
into activities that can act as mini projects such that they can be used to individual
scheduling and budgeting. These individual schedules and budget are then added up to
determine the final budget and schedule. The work breakdown structure also helps to
determine the critical path of the project that is important to estimate the minimum
duration required to complete the project.
3.1.1.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 9 of 25
Communications & Stakeholder Management Plans
3.1.2. High-Level Project Work Breakdown Structure (WBS) Schedule
WBS Task Name Duration Start Finish
1
Implementation of Primary Healthcare
Framework for Rural and Indigenous
Communities
45 wks Mon 6/3/19 Fri 4/10/20
1.1 Initial Survey 5 wks Mon 6/3/19 Fri 7/5/19
1.1.1
Conduct detailed survey on the current
situation in the rural and indigenous
communities
3 wks Mon 6/3/19 Fri 6/21/19
1.1.2 Prepare Survey Report 2 wks Mon 6/24/19 Fri 7/5/19
1.1.3 Submit Report to Management 0 wks Fri 7/5/19 Fri 7/5/19
1.2 Form Project Committee 6 wks Mon 7/8/19 Fri 8/16/19
1.2.1 Discuss Project Requirements 2 wks Mon 7/8/19 Fri 7/19/19
1.2.2 Develop Project Plan 2 wks Mon 7/22/19 Fri 8/2/19
1.2.3 Discuss Feasibility of the Project 2 wks Mon 8/5/19 Fri 8/16/19
1.2.4 Submit Report on Discussions 0 wks Fri 8/16/19 Fri 8/16/19
1.3 Develop Infrastructure and Funding Plan 10 wks Mon 8/19/19 Fri 10/25/19
1.3.1 Propose Primary Healthcare
Infrastructure 2 wks Mon 8/19/19 Fri 8/30/19
1.3.2 Develop Plan for New Infrastructure 3 wks Mon 9/2/19 Fri 9/20/19
1.3.3
Discuss the Need for a College Setup for
General Practice Internship Programs of
Nurses
2 wks Mon 9/23/19 Fri 10/4/19
1.3.4 Develop Plan for Staffing of the Training
Program for the Nurses 3 wks Mon 10/7/19 Fri 10/25/19
1.3.5 Finalise Plan 0 wks Fri 10/25/19 Fri 10/25/19
1.4 Conduct Awareness Program 9 wks Mon
10/28/19 Fri 12/27/19
1.4.1 Procure Funding for Awareness Campaign 2 wks Mon
10/28/19 Fri 11/8/19
1.4.2 Deploy Human Resources to Carry Out
the Campaign 1 wk Mon
11/11/19 Fri 11/15/19
1.4.3 Conduct Campaign among the Rural and
Indigenous Communities 6 wks Mon
11/18/19 Fri 12/27/19
1.4.4 Submit Campaign Report 0 wks Fri 12/27/19 Fri 12/27/19
1.5 Infrastructure Development 11 wks Mon
12/30/19 Fri 3/13/20
1.5.1 Procure Building for General Practice 5 wks Mon Fri 1/31/20
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 10 of 25
3.1.2. High-Level Project Work Breakdown Structure (WBS) Schedule
WBS Task Name Duration Start Finish
1
Implementation of Primary Healthcare
Framework for Rural and Indigenous
Communities
45 wks Mon 6/3/19 Fri 4/10/20
1.1 Initial Survey 5 wks Mon 6/3/19 Fri 7/5/19
1.1.1
Conduct detailed survey on the current
situation in the rural and indigenous
communities
3 wks Mon 6/3/19 Fri 6/21/19
1.1.2 Prepare Survey Report 2 wks Mon 6/24/19 Fri 7/5/19
1.1.3 Submit Report to Management 0 wks Fri 7/5/19 Fri 7/5/19
1.2 Form Project Committee 6 wks Mon 7/8/19 Fri 8/16/19
1.2.1 Discuss Project Requirements 2 wks Mon 7/8/19 Fri 7/19/19
1.2.2 Develop Project Plan 2 wks Mon 7/22/19 Fri 8/2/19
1.2.3 Discuss Feasibility of the Project 2 wks Mon 8/5/19 Fri 8/16/19
1.2.4 Submit Report on Discussions 0 wks Fri 8/16/19 Fri 8/16/19
1.3 Develop Infrastructure and Funding Plan 10 wks Mon 8/19/19 Fri 10/25/19
1.3.1 Propose Primary Healthcare
Infrastructure 2 wks Mon 8/19/19 Fri 8/30/19
1.3.2 Develop Plan for New Infrastructure 3 wks Mon 9/2/19 Fri 9/20/19
1.3.3
Discuss the Need for a College Setup for
General Practice Internship Programs of
Nurses
2 wks Mon 9/23/19 Fri 10/4/19
1.3.4 Develop Plan for Staffing of the Training
Program for the Nurses 3 wks Mon 10/7/19 Fri 10/25/19
1.3.5 Finalise Plan 0 wks Fri 10/25/19 Fri 10/25/19
1.4 Conduct Awareness Program 9 wks Mon
10/28/19 Fri 12/27/19
1.4.1 Procure Funding for Awareness Campaign 2 wks Mon
10/28/19 Fri 11/8/19
1.4.2 Deploy Human Resources to Carry Out
the Campaign 1 wk Mon
11/11/19 Fri 11/15/19
1.4.3 Conduct Campaign among the Rural and
Indigenous Communities 6 wks Mon
11/18/19 Fri 12/27/19
1.4.4 Submit Campaign Report 0 wks Fri 12/27/19 Fri 12/27/19
1.5 Infrastructure Development 11 wks Mon
12/30/19 Fri 3/13/20
1.5.1 Procure Building for General Practice 5 wks Mon Fri 1/31/20
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 10 of 25
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Communications & Stakeholder Management Plans
Internship Training 12/30/19
1.5.2 Recruit Staff for the Training Programs 4 wks Mon 2/3/20 Fri 2/28/20
1.5.3 Enrol Graduate Nurses for the Program 2 wks Mon 3/2/20 Fri 3/13/20
1.5.4 Green Light to Go Ahead with the
Training Program 0 wks Fri 3/13/20 Fri 3/13/20
1.6 Closing 4 wks Mon 3/16/20 Fri 4/10/20
1.6.1 Review the Project 2 wks Mon 3/16/20 Fri 3/27/20
1.6.2 Develop Future Development Planning 2 wks Mon 3/30/20 Fri 4/10/20
1.6.3 Review and Sign Off 0 wks Fri 4/10/20 Fri 4/10/20
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 11 of 25
Internship Training 12/30/19
1.5.2 Recruit Staff for the Training Programs 4 wks Mon 2/3/20 Fri 2/28/20
1.5.3 Enrol Graduate Nurses for the Program 2 wks Mon 3/2/20 Fri 3/13/20
1.5.4 Green Light to Go Ahead with the
Training Program 0 wks Fri 3/13/20 Fri 3/13/20
1.6 Closing 4 wks Mon 3/16/20 Fri 4/10/20
1.6.1 Review the Project 2 wks Mon 3/16/20 Fri 3/27/20
1.6.2 Develop Future Development Planning 2 wks Mon 3/30/20 Fri 4/10/20
1.6.3 Review and Sign Off 0 wks Fri 4/10/20 Fri 4/10/20
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 11 of 25
Communications & Stakeholder Management Plans
3.1.3. High-Level Milestones Schedule
WBS# Description Due Date
1.1.3 Submit Report to Management 7/5/19
1.2.4 Submit Report on Discussions 8/16/19
1.3.5 Finalise Plan 10/25/19
1.4.4 Submit Campaign Report 12/27/19
1.5.4 Green Light to Go Ahead with the Program 3/13/20
1.6.3 Review and Sign Off 4/10/20
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 12 of 25
3.1.3. High-Level Milestones Schedule
WBS# Description Due Date
1.1.3 Submit Report to Management 7/5/19
1.2.4 Submit Report on Discussions 8/16/19
1.3.5 Finalise Plan 10/25/19
1.4.4 Submit Campaign Report 12/27/19
1.5.4 Green Light to Go Ahead with the Program 3/13/20
1.6.3 Review and Sign Off 4/10/20
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 12 of 25
Communications & Stakeholder Management Plans
4. Communications & Stakeholder Management Plans
4.1. Summary & Introduction
Stakeholder management plan is required in order to ensure they are allocated with the
right duties and they have a clear idea of their responsibilities in the project. Furthermore, a
communication plan needs to be developed in order to ensure proper streamlining of
information among various stakeholders deployed in the project.
4.1.1. Stakeholders Influence | Interest Matrix
LEVEL OF INTEREST
LOW HIGH
LEVEL OF INFLUENCE (POWER)
HIGH
Govt Authorities etc
KEEP SATISFIED
KEY STAKEHOLDERS
MANAGE CLOSELY
Government Project Manager
LOW
General public etc
MONITOR
Employees, Suppliers etc
KEEP INFORMED
Rural and Indigenous People Graduate Nurses
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 13 of 25
4. Communications & Stakeholder Management Plans
4.1. Summary & Introduction
Stakeholder management plan is required in order to ensure they are allocated with the
right duties and they have a clear idea of their responsibilities in the project. Furthermore, a
communication plan needs to be developed in order to ensure proper streamlining of
information among various stakeholders deployed in the project.
4.1.1. Stakeholders Influence | Interest Matrix
LEVEL OF INTEREST
LOW HIGH
LEVEL OF INFLUENCE (POWER)
HIGH
Govt Authorities etc
KEEP SATISFIED
KEY STAKEHOLDERS
MANAGE CLOSELY
Government Project Manager
LOW
General public etc
MONITOR
Employees, Suppliers etc
KEEP INFORMED
Rural and Indigenous People Graduate Nurses
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 13 of 25
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Communications & Stakeholder Management Plans
4.1.2. Stakeholder Engagement Table
Stakeholder /
Interested Party
Level Of Power /
Influence / Impact /
Interest Communication Need
Communication
Method What and when Who is responsible?
Project Manager High Updates on the project
and change requests
Face to face in team
meetings, emails
As frequently as
possible, at least once
a week regarding the
project progress
Team Members
Nurses Medium Enrolment information Through
advertisements and
brochures
Before the initiation of
the enrolment program
for the interested
nursing graduates
Human Resource
Manager
Government Very High Potential benefits and
funding requirements
of the project
Through emails and
executive meetings
During planning of the
project for discussing
the need for the
project
Project Manager
Rural and indigenous
people
Low (Interest), High
(Other Attribute
mentioned)
Raise awareness
regarding healthcare
requirement
Awareness campaigns For a few weeks
before project
implementation to
raise the awareness of
the rural people
Campaign Manager
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 14 of 25
4.1.2. Stakeholder Engagement Table
Stakeholder /
Interested Party
Level Of Power /
Influence / Impact /
Interest Communication Need
Communication
Method What and when Who is responsible?
Project Manager High Updates on the project
and change requests
Face to face in team
meetings, emails
As frequently as
possible, at least once
a week regarding the
project progress
Team Members
Nurses Medium Enrolment information Through
advertisements and
brochures
Before the initiation of
the enrolment program
for the interested
nursing graduates
Human Resource
Manager
Government Very High Potential benefits and
funding requirements
of the project
Through emails and
executive meetings
During planning of the
project for discussing
the need for the
project
Project Manager
Rural and indigenous
people
Low (Interest), High
(Other Attribute
mentioned)
Raise awareness
regarding healthcare
requirement
Awareness campaigns For a few weeks
before project
implementation to
raise the awareness of
the rural people
Campaign Manager
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 14 of 25
Communications & Stakeholder Management Plans
4.2. Communications Management Plan
Communication is essential in any project to develop effective team work and team
bonding as well as ensure there is a proper flow of information between stakeholders. In
this project, communication management is essential to ensure the stakeholders update
each other about the project to remain well informed, especially in the tasks that are
connected to each other. For example, the campaign manager must inform the project
manager about the success of the campaign in order to proceed with the project.
Furthermore, before the general practice training program is initiated, the graduate nurses
will have to be communicated through advertisements and brochures so that they can
apply for enrolment in the program.
4.3. Reporting Requirements
In order to ensure proper streamlining of project related information from the low to the
higher management levels, reporting is absolutely necessary. The project team members
will report daily to the team manager who will in turn report weekly to the project
manager. The project manager will report to the management once every month regarding
project success.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 15 of 25
4.2. Communications Management Plan
Communication is essential in any project to develop effective team work and team
bonding as well as ensure there is a proper flow of information between stakeholders. In
this project, communication management is essential to ensure the stakeholders update
each other about the project to remain well informed, especially in the tasks that are
connected to each other. For example, the campaign manager must inform the project
manager about the success of the campaign in order to proceed with the project.
Furthermore, before the general practice training program is initiated, the graduate nurses
will have to be communicated through advertisements and brochures so that they can
apply for enrolment in the program.
4.3. Reporting Requirements
In order to ensure proper streamlining of project related information from the low to the
higher management levels, reporting is absolutely necessary. The project team members
will report daily to the team manager who will in turn report weekly to the project
manager. The project manager will report to the management once every month regarding
project success.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 15 of 25
Project Management Office Structure & Human Resources Plan
5. Project Management Office Structure & Human Resources Plan
5.1. Project Organisational Structure
5.1.1. Organisational Structure Diagram
Figure 1: Project Organisational Structure for the Education Package for New Graduate
Nurses in a General Practice Project
5.1.2. Project Sponsor/Steering Committee
As it is a government funded project, the government itself will act as the sponsor and will
provide sufficient funds for the project. The steering committee will monitor project
progress and will streamline instructions from government to project team and vice versa.
5.1.3. Project Manager
A project manager will be assigned to manage the entire project by providing guidance to
the project team as well as controlling and monitoring the project progress.
5.1.4. Project Team
The project team will be responsible for conducting various duties including conducting
survey, awareness campaigns and the development of infrastructure for primary healthcare.
5.1.5. Working Parties/Groups
5.1.5.1 Working party –
The working party is assigned with individual activities in the project including the field
works in campaigns and surveys.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 16 of 25
Project sponsor
Project Team Reference
Group
Project Manager
Working Group
Steering Group
Project
Consultants
5. Project Management Office Structure & Human Resources Plan
5.1. Project Organisational Structure
5.1.1. Organisational Structure Diagram
Figure 1: Project Organisational Structure for the Education Package for New Graduate
Nurses in a General Practice Project
5.1.2. Project Sponsor/Steering Committee
As it is a government funded project, the government itself will act as the sponsor and will
provide sufficient funds for the project. The steering committee will monitor project
progress and will streamline instructions from government to project team and vice versa.
5.1.3. Project Manager
A project manager will be assigned to manage the entire project by providing guidance to
the project team as well as controlling and monitoring the project progress.
5.1.4. Project Team
The project team will be responsible for conducting various duties including conducting
survey, awareness campaigns and the development of infrastructure for primary healthcare.
5.1.5. Working Parties/Groups
5.1.5.1 Working party –
The working party is assigned with individual activities in the project including the field
works in campaigns and surveys.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 16 of 25
Project sponsor
Project Team Reference
Group
Project Manager
Working Group
Steering Group
Project
Consultants
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Budget/Cost Management Plan
5.1.5.2 Reference Groups
Reference groups are required to identify the success of similar projects in other parts of the
world that have already been undertaken. The reference data will significantly help to
develop an appropriate plan for the project.
5.1.6. Consultants – consultation expertise
Specific consultants can be hired for helping with developing the plan for primary healthcare
infrastructure and the benefits of the infrastructure for the rural people. Highly reputed
doctors can act as consultants in this regard.
5.2. Human Resources Management Plan
Human resources in the project will be deployed on the basis of skills and expertise and will
be done through detailed interview and testing procedure.
6. Budget/Cost Management Plan
6.1. Introduction
Cost management plan is required to ensure the investment in the project is spent in the
right manner and each activity in the project is appropriately funded to ensure they fulfil all
the requirements. The cost management plan for the project is shown in the following table.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 17 of 25
5.1.5.2 Reference Groups
Reference groups are required to identify the success of similar projects in other parts of the
world that have already been undertaken. The reference data will significantly help to
develop an appropriate plan for the project.
5.1.6. Consultants – consultation expertise
Specific consultants can be hired for helping with developing the plan for primary healthcare
infrastructure and the benefits of the infrastructure for the rural people. Highly reputed
doctors can act as consultants in this regard.
5.2. Human Resources Management Plan
Human resources in the project will be deployed on the basis of skills and expertise and will
be done through detailed interview and testing procedure.
6. Budget/Cost Management Plan
6.1. Introduction
Cost management plan is required to ensure the investment in the project is spent in the
right manner and each activity in the project is appropriately funded to ensure they fulfil all
the requirements. The cost management plan for the project is shown in the following table.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 17 of 25
Budget/Cost Management Plan
6.2. Project Budget and Cost Plan
WBS# Description
Project
Budget
Allowance
Contingenc
y
Allowance
In-Kind
Cost
Project
Budget
allowance
Contingenc
y
Allowance
In-Kind
Cost
Lev 1
Lev 2
Lev 3
2019 2020
1.0 Implementation of Primary
Healthcare Framework for
Rural and Indigenous
Communities
$400,000 $100,000 $400,000 $100,000 $500,000
1.1 Initial Survey
$90,000 $10,000
1.1.1 Conduct detailed survey on
the current situation in the
rural and indigenous
communities
1.1.2 Prepare Survey Report
… Submit Report to
Management
1.2 Form Project Committee
$90,000 $10,000
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
18 of 25
6.2. Project Budget and Cost Plan
WBS# Description
Project
Budget
Allowance
Contingenc
y
Allowance
In-Kind
Cost
Project
Budget
allowance
Contingenc
y
Allowance
In-Kind
Cost
Lev 1
Lev 2
Lev 3
2019 2020
1.0 Implementation of Primary
Healthcare Framework for
Rural and Indigenous
Communities
$400,000 $100,000 $400,000 $100,000 $500,000
1.1 Initial Survey
$90,000 $10,000
1.1.1 Conduct detailed survey on
the current situation in the
rural and indigenous
communities
1.1.2 Prepare Survey Report
… Submit Report to
Management
1.2 Form Project Committee
$90,000 $10,000
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
18 of 25
Budget/Cost Management Plan
1.2.1 Discuss Project
Requirements
1.2.2 Develop Project Plan
1.2.3 Discuss Feasibility of the
Project
1.2.4 Submit Report on
Discussions
…
1.3 Develop Infrastructure and
Funding Plan
$90,000 $10,000
1.3.1 Propose Primary
Healthcare Infrastructure
1.3.2 Develop Plan for New
Infrastructure
1.3.3 Discuss the Need for a
College Setup for Internship
Programs of Nurses
1.3.4 Develop Plan for Staffing of
the Internship Program
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
19 of 25
1.2.1 Discuss Project
Requirements
1.2.2 Develop Project Plan
1.2.3 Discuss Feasibility of the
Project
1.2.4 Submit Report on
Discussions
…
1.3 Develop Infrastructure and
Funding Plan
$90,000 $10,000
1.3.1 Propose Primary
Healthcare Infrastructure
1.3.2 Develop Plan for New
Infrastructure
1.3.3 Discuss the Need for a
College Setup for Internship
Programs of Nurses
1.3.4 Develop Plan for Staffing of
the Internship Program
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
19 of 25
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Budget/Cost Management Plan
… Finalise Plan
1.4 Conduct Awareness Program
$90,000 $10,000
1.4.1 Procure Funding for
Awareness Campaign
1.4.2 Deploy Human Resources
to Carry Out the Campaign
1.4.3 Conduct Campaign among
the Rural and Indigenous
Communities
1.4.4 Submit Campaign Report
…
1.5 Infrastructure Development
$90,000 $10,000 $400,000 $100,000
1.5.1 Procure Building for
Internship Training
1.5.2 Recruit Staff for the
Training Programs
1.5.3 Enrol Graduate Nurses for
the Program
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
20 of 25
… Finalise Plan
1.4 Conduct Awareness Program
$90,000 $10,000
1.4.1 Procure Funding for
Awareness Campaign
1.4.2 Deploy Human Resources
to Carry Out the Campaign
1.4.3 Conduct Campaign among
the Rural and Indigenous
Communities
1.4.4 Submit Campaign Report
…
1.5 Infrastructure Development
$90,000 $10,000 $400,000 $100,000
1.5.1 Procure Building for
Internship Training
1.5.2 Recruit Staff for the
Training Programs
1.5.3 Enrol Graduate Nurses for
the Program
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
20 of 25
Budget/Cost Management Plan
1.5.4 Green Light to Go Ahead
with the Program
…
1.6 Closing
- - - - - -
1.6.1 Review the Project
1.6.2 Develop Future
Development Planning
1.6.3 Review and Sign Off
Totals
Project Total Budget Allowance per year
(Project Budget + contingencies)
$500
Overall Project cost allowance
(with in-kind costs)
$1
.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
21 of 25
1.5.4 Green Light to Go Ahead
with the Program
…
1.6 Closing
- - - - - -
1.6.1 Review the Project
1.6.2 Develop Future
Development Planning
1.6.3 Review and Sign Off
Totals
Project Total Budget Allowance per year
(Project Budget + contingencies)
$500
Overall Project cost allowance
(with in-kind costs)
$1
.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
21 of 25
Risk Management Plan
7. Risk Management Plan
7.1. Introduction
A risk management plan is defined as a specific project oriented plan that aims to identify the
risks associated with the project. Based on the identification of the risks, prioritization is
performed so that the risks are arranged as per their priority and impact score on the project.
Accordingly, the risk management plan is developed that looks to mitigate the risks in order of
their priorities.
[W
7.2. Risk Categories
7.2.1. Probability and Impact Table
Rating for Probability and Imapcts
Scale Probably Quality (considering both Time & Cost elements)
E Extreme 70% Very significant impact on overall functionality
H High 51-70% Significant impact on overall functionality
M Medium 31-50% Some impact in key functional areas
L Low 11-30% Minor impact on overall functionality
VL Very Low 1-10% Minor impact on secondary functions
NIL NIL <1% No change in functionality
7.2.2. Probability and Impact Matrix
Grade: Combined effect of Likelihood/Seriousness
SERIOUSNESS
LIKELIHOOD
EXTREME
– =<1.0
HIGH
<0.9
MEDIUM
<0.7
LOW
<0.5
VERY
LOW <0.3
NIL –
<0.1
EXTREME =<1.0 1.0 0.90 0.70 0.50 0.30 0.1
HIGH <0.9 0.90 0.81 0.63 0.45 0.27 0.09
MEDIUM <0.7 0.70 0.63 0.49 0.35 0.21 0.07
LOW <0.5 0.50 0.45 0.35 0.25 0.15 0.05
VER LOW <0.3 0.30 0.27 0.21 0.15 0.09 0.03
NIL <0.1 0.1 0.09 0.07 0.05 0.03 0.01
7.2.3. Recommended actions
Recommended actions for grades of risk
Grade Risk mitigation actions
E Proactive mitigation actions required to reduce the likelihood and seriousness. Identify
and implement as soon as the project commences as a priority.
H Proactive &/or reactive mitigation actions required to reduce the likelihood and
seriousness. Identify appropriate actions and implemented during project execution.
M Proactive &/or reactive mitigation actions required to reduce the likelihood and
seriousness. Identify and cost contingency plans for possible action; if funds permit.
Monitor regularly.L Monitor regularly to determine if/when action is needed. Develop a contingency
(reactive) mitigation plan.
VL To be noted - no action is needed unless grading increases over time. Monitor regularly.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 22 of 25
7. Risk Management Plan
7.1. Introduction
A risk management plan is defined as a specific project oriented plan that aims to identify the
risks associated with the project. Based on the identification of the risks, prioritization is
performed so that the risks are arranged as per their priority and impact score on the project.
Accordingly, the risk management plan is developed that looks to mitigate the risks in order of
their priorities.
[W
7.2. Risk Categories
7.2.1. Probability and Impact Table
Rating for Probability and Imapcts
Scale Probably Quality (considering both Time & Cost elements)
E Extreme 70% Very significant impact on overall functionality
H High 51-70% Significant impact on overall functionality
M Medium 31-50% Some impact in key functional areas
L Low 11-30% Minor impact on overall functionality
VL Very Low 1-10% Minor impact on secondary functions
NIL NIL <1% No change in functionality
7.2.2. Probability and Impact Matrix
Grade: Combined effect of Likelihood/Seriousness
SERIOUSNESS
LIKELIHOOD
EXTREME
– =<1.0
HIGH
<0.9
MEDIUM
<0.7
LOW
<0.5
VERY
LOW <0.3
NIL –
<0.1
EXTREME =<1.0 1.0 0.90 0.70 0.50 0.30 0.1
HIGH <0.9 0.90 0.81 0.63 0.45 0.27 0.09
MEDIUM <0.7 0.70 0.63 0.49 0.35 0.21 0.07
LOW <0.5 0.50 0.45 0.35 0.25 0.15 0.05
VER LOW <0.3 0.30 0.27 0.21 0.15 0.09 0.03
NIL <0.1 0.1 0.09 0.07 0.05 0.03 0.01
7.2.3. Recommended actions
Recommended actions for grades of risk
Grade Risk mitigation actions
E Proactive mitigation actions required to reduce the likelihood and seriousness. Identify
and implement as soon as the project commences as a priority.
H Proactive &/or reactive mitigation actions required to reduce the likelihood and
seriousness. Identify appropriate actions and implemented during project execution.
M Proactive &/or reactive mitigation actions required to reduce the likelihood and
seriousness. Identify and cost contingency plans for possible action; if funds permit.
Monitor regularly.L Monitor regularly to determine if/when action is needed. Develop a contingency
(reactive) mitigation plan.
VL To be noted - no action is needed unless grading increases over time. Monitor regularly.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 22 of 25
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Risk Management Plan
N To be noted - no action is needed unless grading increases over time.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 23 of 25
N To be noted - no action is needed unless grading increases over time.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 23 of 25
Risk Management Plan
7.3. A Basic Risk Register
Present the major risks in a structured format using this table:
Condition Cause Consequence
Likelihood
Seriousness
Grade Mitigation
1. The project stops abruptly Social stigma of the
indigenous people
Project failure 1.0 1.0 1.0 Conduct awareness campaign to raise awareness among rural
and indigenous people regarding healthcare
2. No interest among graduate
nurses
Rural posting Goal of the project not
reached
0.7 0.9 0.63 Develop reasonable but attractive payment package for the
nurses getting rural posting
3. Failure to supply healthcare
service
Lack of sufficient support
infrastructure like
availability of medicine in
the rural areas
Failure of the project 0.9 1.0 0.9 Initiate regular supply of medicine and other medical support to
the rural camps that will be set up.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
24 of 25
7.3. A Basic Risk Register
Present the major risks in a structured format using this table:
Condition Cause Consequence
Likelihood
Seriousness
Grade Mitigation
1. The project stops abruptly Social stigma of the
indigenous people
Project failure 1.0 1.0 1.0 Conduct awareness campaign to raise awareness among rural
and indigenous people regarding healthcare
2. No interest among graduate
nurses
Rural posting Goal of the project not
reached
0.7 0.9 0.63 Develop reasonable but attractive payment package for the
nurses getting rural posting
3. Failure to supply healthcare
service
Lack of sufficient support
infrastructure like
availability of medicine in
the rural areas
Failure of the project 0.9 1.0 0.9 Initiate regular supply of medicine and other medical support to
the rural camps that will be set up.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0 Page
24 of 25
Quality Plan
8. Quality Plan
8.1. Quality Management Plan
8.1.1. Protocols, policy, Guidelines and Standards;
For proceeding with the project and providing healthcare services, it will be required to abide
by certain professional and medical protocols, guidelines and standards. Handling of
medicines, critically sick patients and other related activities will require the nurses to strictly
abide by the medical profession protocols or will face strict punishments.
8.1.2. Monitoring Procedures;
Throughout the course of the project, the project manager will monitor the progress of the
project to ensure it is moving in the right direction. The monitoring process is aided by
progress reports that are forwarded to the project manager at the end of every week.
8.1.3. Change/Issues/Problem Management;
If the project manager, during the monitoring process, notices some issues or problems in the
project, he may introduce some change management activities that will bring the project back
on track. However, for introducing such changes, feasibility test of the changes has to be
conducted and the changes must be approved by the steering committee.
8.1.4. Review and Acceptance Procedures; and
Project review and acceptance procedure will be conducted after the project is over. The
review process will involve detailed review of each activity of the project and it is to be
ensured that each milestone is reached at the right point of time and the right amount of
spending.
The acceptance procedure will include development of a checklist to determine if all the
requirements of the project are met. Even if one of the requirements is not met, the project
will not be accepted and will be sent back for restarting the unmet
8.1.5. Documentation and Record Keeping
Throughout the project, appropriate documentation and record keeping is required in order to
ensure they can be reviewed for future reference purposes. The project manager will review
the document at the end of the project and will forward it to the management for further
review and approval.
9. Project Closure & Outcome Realisation
Once the project is handed over and appropriately reviewed, it is ready for closure. The
project closure will be based on the fulfilling of a checklist that will be completed by the
project stakeholders.
The outcome of the project will be realised within a period of 1-2 years from the completion of
the project. It will be important to ensure the project requirements are fulfilled so that the
outcomes are realised as per the expectations.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 25 of 25
8. Quality Plan
8.1. Quality Management Plan
8.1.1. Protocols, policy, Guidelines and Standards;
For proceeding with the project and providing healthcare services, it will be required to abide
by certain professional and medical protocols, guidelines and standards. Handling of
medicines, critically sick patients and other related activities will require the nurses to strictly
abide by the medical profession protocols or will face strict punishments.
8.1.2. Monitoring Procedures;
Throughout the course of the project, the project manager will monitor the progress of the
project to ensure it is moving in the right direction. The monitoring process is aided by
progress reports that are forwarded to the project manager at the end of every week.
8.1.3. Change/Issues/Problem Management;
If the project manager, during the monitoring process, notices some issues or problems in the
project, he may introduce some change management activities that will bring the project back
on track. However, for introducing such changes, feasibility test of the changes has to be
conducted and the changes must be approved by the steering committee.
8.1.4. Review and Acceptance Procedures; and
Project review and acceptance procedure will be conducted after the project is over. The
review process will involve detailed review of each activity of the project and it is to be
ensured that each milestone is reached at the right point of time and the right amount of
spending.
The acceptance procedure will include development of a checklist to determine if all the
requirements of the project are met. Even if one of the requirements is not met, the project
will not be accepted and will be sent back for restarting the unmet
8.1.5. Documentation and Record Keeping
Throughout the project, appropriate documentation and record keeping is required in order to
ensure they can be reviewed for future reference purposes. The project manager will review
the document at the end of the project and will forward it to the management for further
review and approval.
9. Project Closure & Outcome Realisation
Once the project is handed over and appropriately reviewed, it is ready for closure. The
project closure will be based on the fulfilling of a checklist that will be completed by the
project stakeholders.
The outcome of the project will be realised within a period of 1-2 years from the completion of
the project. It will be important to ensure the project requirements are fulfilled so that the
outcomes are realised as per the expectations.
Education Package for New Graduate Nurses in a General Practice Project Plan v 1.0
Page 25 of 25
1 out of 25
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.