Project Management: Event Launch at QAHE University
Verified
Added on  2023/01/23
|14
|3340
|41
AI Summary
This report is based on QAHE University which is responsible for providing higher education to students. At present scenario they are about to carry out an event through which they can make people aware about the modification they have been made in their infrastructure.
Contribute Materials
Your contribution can guide someoneâs learning journey. Share your
documents today.
Project Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................3 TASK 1.............................................................................................................................................3 a) Project initiation document......................................................................................................3 b) Stakeholders analysis..............................................................................................................4 TASK 2............................................................................................................................................5 Work break down structure.........................................................................................................5 TASK 3.............................................................................................................................................9 Risk register.................................................................................................................................9 TASK 4...........................................................................................................................................11 Short report on event.................................................................................................................11 CONCLUSION..............................................................................................................................12 REFERENCES..............................................................................................................................14
INTRODUCTION Project management is defined as a discipline which comprises of certain policies, principles and procedures so that project can be accomplished in a required manner(Vanhoucke, 2014). This report is based on QAHE University which is responsible for providing higher education to students. At present scenario they are about to carry out an event through which they can make people aware about the modification they have been made in their infrastructure. This report contains project initiation document along with details of budget, timescale, objectives and stakeholder. The work breakdown structure has been provided and various risks associate with the same are presented. At last, a short report has been presented which covers aspects such as leadership, methodologies and other essential perspectives. TASK 1 a) Project initiation document PID is an crucial element within project management as it acts as an foundation for the business project. Moreover, it is a reference point which is used for accomplishment of project which comprises of all the mandatory details(Stellingwerf and Zandhuis, 2013). The PID has been prepared before the actual project has been started. The PID plan for this project has been shown below: Title of projectLaunching of an event Computation of budgetDirectorof operationhasprovided abudget of ÂŁ50,000 approximately for carrying out this project. This project is based on showing the renovation which has been carried out by QAHE University. Brief break down of moneyďˇLocus - ÂŁ10000 ďˇFood and beverages - ÂŁ10000 ďˇEmbellishment - ÂŁ5000 ďˇEntertainment - ÂŁ5000 ďˇOther resources - ÂŁ20000
Start date2ndSeptember, 2019 Finish date6thSeptember, 2019 Project SponsorManaging director of University or Director of Operations Project manager Mainobjectives(shortlistof key business related with why project is being undertaken) ďˇGrab the attention of maximum number of students within their all Universities ďˇShow cases their alterations to acquire competitive edge within the market. ďˇPromotion of University Overallsuggestedapproach (someessentialpointsin descriptionofhowobjectives can be attained) ďˇCreationofawarenessinbetweenstudentswith respect to technologies implemented by them. ďˇEnhanced strategies can be formulated so that project can be successfully accomplished. Reference(s) b) Stakeholders analysis Groups or individuals who have interest in organisation are known as stakeholders. They denote people who possess interest within triumph of peculiar project(Spalek, 2013).With respect to QAHE, stakeholders have some interest within the project which is to be carried out within University. Details of stakeholders of QAHE are provided beneath: Sponsors:They are the individuals or organisations who have made their contribution in terms of money for commencement of the event or project which is to be carried out QAHE University. In return of this, they will show case their products as well as services. The reason behind their attraction is that they have opportunity to advertise their goods to different people who will be present within the event. For this, they have been invested financially within this project(Sharp, Peters and Howard, 2017). The reason for them to stay stick to this event is that they can draw in more number of customers for their services so that they can maximise their productivity along with profitability.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Suppliers:It denotes people who are liable for furnishing various resources to University according to requirements given by them (QAHE University). The reason behind their interest within project is to increase their profits(Seymour and Hussein, 2014). Along with this, while they will render their services in the form of resources will also enable them to grab attention towards their services. They might be able to fascinate more number of people through services which will aid them to have more orders. They will be making their presence within event in the form of resources. Students:They are one of crucial assets within any educational institute and same goes for QAHEUniversity.Thereasonbehindtheirinterestinprojectisthatfrommanyyears refurbishment has not occurred. There was one more reason for their interest i.e. in this event they will get to know what all alterations have been occurred within classrooms as well as laboratories along what all enhancements have been carried out within their University(Madter, Bower and Aritua, 2012). They are part of this project as by this they will be able to acquire knowledge with respect to the latest technologies which prevail around the world. This will assist them to have competitive advantage within dynamically evolving technologies. Faculty:They denote people who will work within University for furnishing their services to their students. They are inquisitive about this project as there organisation has executed latest technology as well as carried out renovation through which fresh and affirmative environment will be created. Moreover, they will be able to acquire knowledge with respect to latest innovations as well as trends. They have not made any kind of financial investment rather they will be giving knowledge to students. Alumni:The passed out students of QAHE University denotes Alumni. They are probing about what will be University giving to the present students, as they were deprived of various things such as updated laboratories, outdated classrooms, etc. Along with this, they will be meeting their friends after certain moment of time which makes them happier(Klein, Biesenthal and Dehlin, 2015). They possess short interest as they have not invested anything in this event; it is the curiosity due to which they will be part. They are associated with this project as it will act as a week out for them and they can stay away from their everyday boring and hectic schedule.
TASK 2 Work break down structure. WBS is defined as a hierarchical tree structure which endow outline of project as well as isolate them into manageable and feasible chunks(Hällgren, 2012). When they are divided into small sections then these pieces can be distributed within a team as per their capabilities. This will enable each team to carry out their responsibilities in given time duration. Apart from this, it will also provide high quality of services as roles are assigned as per knowledge and field of interest of each team. Leader of each team is responsible for rendering appropriate guidelines to their employees or followers by the assistance of work breakdown structure so that their work can be made easier. Work Breakdown Structure
antt Chart Event which is to be carried out by QA Higher Education will span for around 5 days which will be conducted from 2ndto 6thSeptember during Fresherâs week. This event comprises of formal ceremony, visit to labs, classrooms, celebratory elements (drinks & food) and various other affairs. Local and national dignitaries will be present in this event(Greiman, 2013). Various factors must be taken into account with respect to this event, they are specified below: ďˇFinance:It is the foremost as well as critical activity which must be carried out for conducting this event. Director of operations and top executives of QAHE University must develop appropriate strategies as well as analyse them to find out what will be the cost for entire event. The plan has to be formulated as per the requirements so that further activities can be conducted. Furthermore, they need to focus on most important activities initially and latter on, rest of the activities can be carried out on basis of priority. If these affairs are not handled in appropriate manner then, there are high chances that reputation of University will be at stake. Therefore, it is mandatory that budget must be prepared accordingly(Glukhov, Ilin and Levina, 2015).
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
ďˇQuality:Entire team as well as Director of operations is involved in this event so that it can beensured that effectual services are offered to guest as well as event can be accomplished in the desired standard or even better than that. The aim for carrying out this event is to captivate more number of students, for this it is necessary to show case what all alterations and technology they will be working on. This might lead them to have effectual result. ďˇMarketing:The intention of QAHE is to have more number of students and acquire competitive edge in market with respect to other Universities. For this they need to make sure that they make effective use of marketing strategies. They must be formulated in such a way that organisation is able to reach maximum number of people with respect to occurrence of this event(Gauthier and Ika, 2012).For this, advertisements can be carried out on TV, social media, newspapers along with these mails and pamphlets can be distributed to alumni as well as other Universities. The above stated tasks can be accomplished by handling different subtasks. They are represented below: ďˇMarketing:Success of an event entirely event will lead to increase in number of guests who will arrive for the launch of an event. If number of students who arrives at event are less as compared to anticipated then this will lead them to fail adversely during the launch of event as objectives cannot be attained as per their requirements. If they possess ample number of employees then it denotes that they have attained their goals as well as objectives. Director of operations and management of QAHE needs to make sure that large number of people or students are part of launch of this event(Conforto and et.al., 2016). For this they need to give appropriate details of technologies which they have been executed within University. ďˇQuality:As it is a large scale event, national as well as local dignitaries will be a part of this. It will lead them to improvise reputation of University but if quality services are not given then reputation of University will be hampered. For this, it must be ensured hat event is rehearsed before it takes place.
ďˇResearch:Before an event is launched, proper research must be carried out. By this behaviour of people towards this event can be analysed. This can be carried out as an promotional activity for acknowledging the expectations of people from this event. Milestone There exist management tools which will be responsible for reflecting schedule of project. It will furnish each and every detail associated with project from its initiation till it is completed; this will enable to formulate a schedule. With respect to QAHE, work breakdown structure has been used by which schedule can be formulated for each event and can be organised in an appropriate manner (Vanhoucke, 2014). This will lead to inspire and draw in maximum number of students while launching the event. QAHE university will be able to show off what they have brought within their working premises. TASK 3 Risk register. Risk denotes certain problems which occurred while carrying out something important for peculiar project or event. QAHE University is launching their event, which is planned to show off the amendments made by them in their educational institute. Risks concerned with launch of event are: S. No. Risk Description Probabil ity Conseq uence OwnerMitigationContinge ncy Pre action weightin g score Post action weightin g Score 1Inappropriate management of budget. BroadBroadDirector of operatio ns Savefunds for any kind of emergency. Have backup planand strategies 7 by 108 by 10 2Inappropriate planning MinimalNegligib le Project manager Coordinate with coordinator s Predefine d planning 8 by 106 by 10
3Technologica l risk. HighHighDirector of operatio ns Gain knowledge of technology Training8 by 108 by 10 4Lackof resources HighHighDirector of operatio ns Involve more sponsors. Onbasis ofmajor activities funds mustbe utilised. 7 by 104 by 10 5Operational risks ModerateReducedTechnic al team Acknowled geeach memberof team who is involvedin event. Takeall aspects into account 8 by 106 by10 6Alterationin governmental policies. LowMinimalProject manager Governmen tpolicies mustbe considered. Consider policies which they must abidefor launch event. 6 by 104 by 10 7Delayin deliveryof resources. BroadModerat e Manage rof operatio n Resources mustbe made available before Agreeme ntwith suppliers. 9 by 103outof 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
event. 8Safety risksNormalWideProject manager Have adequate numberof security guards. Take into considera tion previous events. 8outof 10 5 by 10 9Poor management ReducedNominalManage rof Project Formulate appropriate schedule of event. Rehearsal of activities. 8 by 103 by 10 10Murphy's lawAverageInterme diate Project manager Brainstorm whatcan occur. Risk assessme ntwhen planning is done. 8outof 10 6 by 10 TASK 4 Short report on event The repost which have formulated below is submitted to Managing Director so that details associated with methodologies can be used in an effective manner, This reposrt has been illustrated in this section. Project Report QA Higher Education has made some alterations within their existing structure which comprises of classrooms and laboratories which are present within London, Birmingham and Manchester(Stellingwerf and Zandhuis, 2013). For grabbing attention of more number of people this event has been conducted. This report comprises of significance of leadership, methodologies as well as recommendations which are best for them. Importance of Strong Leadership:
For accomplishment of this project successfully, trenchant leadership plays critical role. Leader must formulate strategies by which impelling guidelines can be provided to team members by which work can be carried out without any kind of obstacles. Aim of this event is to advertise the changes which have been made by them within their their University premises. Manager of project must be agile which will enable them to handle all the milestones which ever may come in their way. This project must be maintained byan individual who possess knowledgeaboutmaximumaspectsofUniversityalongwithappropriateknowledgeof technologies which have been implemented(Spalek, 2013). This will allow them to answer all the uncertain queries raised guests. There must be sense of responsibility in aleader so that effectual guideline scan be provided to other people within the team. Methodologies: There exists various method which can be utilised for management of project, some of them are waterfall, agile and PRINCE2. QAHE University can make use of a method on the basis of their requirement. Waterfall method is a sequenced structure in which output attained by one step will be input for other step this process continues until task is accomplished. But teh major drawback of this type of method is that if any of the steps fails or outcome attained is wrong then entire result will be wrong which denotes that begin from starting. In case of agile method when there exists uncertainty but scope of project is unidentifiable then this method can also be not utilised(Sharp, Peters and Howard, 2017). PRINCE2 is a customised technique in which modifications can be made according to the needs or requirements of the project. By this improvised results can be attained. But it can not be used if project is small. Recommendation: PRINCE2 method can be used within large projects and will provide results depending upon requirements of project. Along with this, it will also furnish option of customisation which will yield affirmative results. CONCLUSION From above, it can be concluded that project management plays mandatory role for accomplishment of peculiar project. It is pre designed methods which have been formulated for having impelling results. This report deals with a launch of an event by which people can be
made aware about services which will be furnished by University. It will also supply details of time which will be required for completion of project. Short story report has been presented to evaluate importance of leadership and methodology which must be adopted. REFERENCES Books & Journals
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Conforto,E.C.,andet.al.,2016.Theagilityconstructonprojectmanagementtheory. International Journal of Project Management.34(4). pp.660-674. Gauthier, J. B. and Ika, L. A., 2012. Foundations of project management research: an explicit and sixâfacet ontological framework.Project Management Journal.43(5). pp.5-23. Glukhov, V. V., Ilin, I. V. and Levina, A. I., 2015. August. Project management team structure for internet providing companies. InConference on Smart Spaces(pp. 543-553). Springer, Cham. Greiman, V. A., 2013.Megaproject management: Lessons on risk and project management from the Big Dig. John Wiley & Sons. Hällgren, M., 2012. The construction of research questions in project management.International Journal of Project Management.30(7). pp.804-816. Klein, L., Biesenthal, C. and Dehlin, E., 2015. Improvisation in project management: A praxeology.International journal of project management.33(2). pp.267-277. Madter, N., Bower, D. A. and Aritua, B., 2012. Projects and personalities: A framework for individualising project management career development in the construction industry. International Journal of Project Management.30(3). pp.273-281. Seymour, T. and Hussein, S., 2014. The history of project management.International Journal of Management & Information Systems (Online).18(4). p.233. Sharp, J. A., Peters, J. and Howard, K., 2017.The management of a student research project. Routledge. Spalek, S., 2013. Improving industrial engineering performance through a successful project management office. Stellingwerf, R. and Zandhuis, A., 2013.ISO 21500 Guidance on project managementâA Pocket Guide. Van Haren. Vanhoucke, M., 2014. Integrated Project Management and Control.Springer. Doi.10.pp.978-3.