P R O J E C T C H A R T E R
Project Name: Turnover of Pizza Hut Revision Date: March 13, 2019
Customer Project Sponsor: Project Manager:
Project Name: Turnover of Pizza Hut Revision Date: March 13, 2019
Customer Project Sponsor: Project Manager:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents:
PROJECT OBJECTIVES:.............................................................................................................................3
PURPOSE:...............................................................................................................................................3
SCOPE:...................................................................................................................................................3
DELIVERABLES:.......................................................................................................................................4
PRIORITY:...............................................................................................................................................4
KEY STAKEHOLDERS (INTERNAL AND EXTERNAL):..................................................................................4
CROSS-ORGANIZATIONAL TEAM MEMBERS:..........................................................................................5
SPECIAL RESOURCES:..............................................................................................................................6
PROJECT PLAN:.......................................................................................................................................7
POTENTIAL ISSUES OR CONSTRAINTS:....................................................................................................9
COMPLETION CRITERIA:.........................................................................................................................9
APPROVALS:...........................................................................................................................................9
BIBLIOGRAPHY.....................................................................................................................................11
APPENDIX 1: BUDGET RESOURCES:......................................................................................................12
APPENDIX 2: COMMUNICATION PLAN.................................................................................................13
APPENDIX 3: RISK MANAGEMENT PLAN...............................................................................................15
PROJECT OBJECTIVES:.............................................................................................................................3
PURPOSE:...............................................................................................................................................3
SCOPE:...................................................................................................................................................3
DELIVERABLES:.......................................................................................................................................4
PRIORITY:...............................................................................................................................................4
KEY STAKEHOLDERS (INTERNAL AND EXTERNAL):..................................................................................4
CROSS-ORGANIZATIONAL TEAM MEMBERS:..........................................................................................5
SPECIAL RESOURCES:..............................................................................................................................6
PROJECT PLAN:.......................................................................................................................................7
POTENTIAL ISSUES OR CONSTRAINTS:....................................................................................................9
COMPLETION CRITERIA:.........................................................................................................................9
APPROVALS:...........................................................................................................................................9
BIBLIOGRAPHY.....................................................................................................................................11
APPENDIX 1: BUDGET RESOURCES:......................................................................................................12
APPENDIX 2: COMMUNICATION PLAN.................................................................................................13
APPENDIX 3: RISK MANAGEMENT PLAN...............................................................................................15
PROJECT OBJECTIVES:
To decrease the turnover at the workplace
To create an environment when there is implementation of learning and development
program for the employees
To determine the factors of increase in turnover of the Pizza Hut
To develop strategic plans for the employee retention and employee satisfaction
PURPOSE:
Pizza Hut will identify the factors behind the staff turnover and decrease in
organizational profitability
There is implementation of training program for remain highly competitive in the Pizza
market.
The company identifies that training and development will help to decrease the turnover
rate by healthy work environment.
The company develops policies for improving productivity plus enhancement of morale
and culture among the project employees.
SCOPE:
The pizza hut is going to train their employees to improve skills and increase in
business productivity.
Employees step all stages of the training processes.
There are time and budget constraints in the project due to delay in the training
activities of employees in marketing and operation departments
To decrease the turnover at the workplace
To create an environment when there is implementation of learning and development
program for the employees
To determine the factors of increase in turnover of the Pizza Hut
To develop strategic plans for the employee retention and employee satisfaction
PURPOSE:
Pizza Hut will identify the factors behind the staff turnover and decrease in
organizational profitability
There is implementation of training program for remain highly competitive in the Pizza
market.
The company identifies that training and development will help to decrease the turnover
rate by healthy work environment.
The company develops policies for improving productivity plus enhancement of morale
and culture among the project employees.
SCOPE:
The pizza hut is going to train their employees to improve skills and increase in
business productivity.
Employees step all stages of the training processes.
There are time and budget constraints in the project due to delay in the training
activities of employees in marketing and operation departments
All the operation and marketing departments are out of the project scope.
DELIVERABLES:
Well trained employees
Improved in the skills of the employees
Increased in performance
Copies of the training manuals in the operation and marketing departments
PRIORITY:
* The priority of the project is to increase the turnover of Pizza Hut so that the company
can gain profitability as well as productivity in their operations.
* The project plan is taken into consideration for learning as well as development.
* The priority is to provide training as well as organizational learning culture.
* Pizza Hut develops policies as well as procedures for improving its productivity as
well as enhancing morale as well as culture among the employees.
* Similar Pizza delivering company can affect the project outcomes, project
deliverables and timetable.
KEY STAKEHOLDERS (INTERNAL AND EXTERNAL):
List of stakeholders Interest External/Internal
Project team High Internal
Project Manager High Internal
Project Sponsor Medium External
DELIVERABLES:
Well trained employees
Improved in the skills of the employees
Increased in performance
Copies of the training manuals in the operation and marketing departments
PRIORITY:
* The priority of the project is to increase the turnover of Pizza Hut so that the company
can gain profitability as well as productivity in their operations.
* The project plan is taken into consideration for learning as well as development.
* The priority is to provide training as well as organizational learning culture.
* Pizza Hut develops policies as well as procedures for improving its productivity as
well as enhancing morale as well as culture among the employees.
* Similar Pizza delivering company can affect the project outcomes, project
deliverables and timetable.
KEY STAKEHOLDERS (INTERNAL AND EXTERNAL):
List of stakeholders Interest External/Internal
Project team High Internal
Project Manager High Internal
Project Sponsor Medium External
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Marketing Manager Medium Internal
Operation Manager Medium Internal
Customers High External
Users Medium External
Trainer Medium Internal
Resource Manager Low Internal
CROSS-ORGANIZATIONAL TEAM MEMBERS:
Resources Area of
representation
Function and role
Project team Execute the project
under supervision of
the project manager
Contribute to entire project objectives
Project Manager Execute the project Direct the strategies of the project organization
Project Sponsor In the finance area Collect fund for the project based on its funding
requirements
Marketing Manager In the marketing area Develop the pricing strategies
Maximize the profits plus market share
Meet with the customer satisfaction
Evaluate and maintain the marketing
strategies
Direct, plan and interact the marketing
efforts
Operation Manager In the operational area Involve to oversee production of goods
and provision of the organizational
services
Meet with customer’s expectations and
requirements
Customers Marketing and
communication area
Communicate about the products with the pizza
hut organization
Trainer Training area Providing training to the employees and
staffs
Providing guidelines on the turnover
management
Operation Manager Medium Internal
Customers High External
Users Medium External
Trainer Medium Internal
Resource Manager Low Internal
CROSS-ORGANIZATIONAL TEAM MEMBERS:
Resources Area of
representation
Function and role
Project team Execute the project
under supervision of
the project manager
Contribute to entire project objectives
Project Manager Execute the project Direct the strategies of the project organization
Project Sponsor In the finance area Collect fund for the project based on its funding
requirements
Marketing Manager In the marketing area Develop the pricing strategies
Maximize the profits plus market share
Meet with the customer satisfaction
Evaluate and maintain the marketing
strategies
Direct, plan and interact the marketing
efforts
Operation Manager In the operational area Involve to oversee production of goods
and provision of the organizational
services
Meet with customer’s expectations and
requirements
Customers Marketing and
communication area
Communicate about the products with the pizza
hut organization
Trainer Training area Providing training to the employees and
staffs
Providing guidelines on the turnover
management
Resource Manager Execute the project
work
Controls the project resources required
Customers Execute the project
work
Direct user of the product and service
Steering committee
includes sponsor,
executives and key
stakeholders
Entire organizational
area
Provides guidelines on the key project related
decisions
SPECIAL RESOURCES:
Resources required
for the project
Involvement in the project
Administrative
support
Manage and distribute of project information among the
marketing departments
Taking memos and maintaining of the project files
Send and receive the correspondences
Greeting with the project clients
External consultants Contracted to carry out the plan evaluation
Develop evaluation designing and implement the design
Educational services Providing career services and training services to the staff
Learning centres
Study support centres for the staffs with special
requirements
Human resources Develop and manage culture of Pizza hut
Recruit hires and maintain the benefits
Conflict and engage into the training activates
Development of training program
Additional budget Operational budget
Financial budget
Cash flow budget
Master budget
work
Controls the project resources required
Customers Execute the project
work
Direct user of the product and service
Steering committee
includes sponsor,
executives and key
stakeholders
Entire organizational
area
Provides guidelines on the key project related
decisions
SPECIAL RESOURCES:
Resources required
for the project
Involvement in the project
Administrative
support
Manage and distribute of project information among the
marketing departments
Taking memos and maintaining of the project files
Send and receive the correspondences
Greeting with the project clients
External consultants Contracted to carry out the plan evaluation
Develop evaluation designing and implement the design
Educational services Providing career services and training services to the staff
Learning centres
Study support centres for the staffs with special
requirements
Human resources Develop and manage culture of Pizza hut
Recruit hires and maintain the benefits
Conflict and engage into the training activates
Development of training program
Additional budget Operational budget
Financial budget
Cash flow budget
Master budget
PROJECT PLAN:
Project milestone schedule
Project milestone activities Expected start date
Implementation of readiness activities 3/13/19
Preparation for the roll out 3/18/19
Secured the training activities 4/9/19
Purchase of the training materials 4/9/19
Contract the trainers 4/29/19
Register the training participants 5/22/19
Hold the training sessions 5/28/19
Evaluation of the training program 5/30/19
Project schedule
WBS Task Name Duration Start Finish
0 Turnover of the Pizza
Hut 60 days
Wed
3/13/1
9
Tue
6/4/19
1 Implementation of
readiness activities 19 days
Wed
3/13/1
9
Mon
4/8/19
1.1 Identify the purpose
of training programs 3 days
Wed
3/13/1
9
Fri
3/15/19
1.2 Finalize the training
courses required 5 days
Mon
3/18/1
9
Fri
3/22/19
1.3 Schedule the training
classes 3 days
Mon
3/25/1
9
Wed
3/27/19
1.4
Schedule instructions
to deliver the training
classes
6 days
Thu
3/28/1
9
Thu
4/4/19
1.5 Communicate the 2 days Fri Mon
Project milestone schedule
Project milestone activities Expected start date
Implementation of readiness activities 3/13/19
Preparation for the roll out 3/18/19
Secured the training activities 4/9/19
Purchase of the training materials 4/9/19
Contract the trainers 4/29/19
Register the training participants 5/22/19
Hold the training sessions 5/28/19
Evaluation of the training program 5/30/19
Project schedule
WBS Task Name Duration Start Finish
0 Turnover of the Pizza
Hut 60 days
Wed
3/13/1
9
Tue
6/4/19
1 Implementation of
readiness activities 19 days
Wed
3/13/1
9
Mon
4/8/19
1.1 Identify the purpose
of training programs 3 days
Wed
3/13/1
9
Fri
3/15/19
1.2 Finalize the training
courses required 5 days
Mon
3/18/1
9
Fri
3/22/19
1.3 Schedule the training
classes 3 days
Mon
3/25/1
9
Wed
3/27/19
1.4
Schedule instructions
to deliver the training
classes
6 days
Thu
3/28/1
9
Thu
4/4/19
1.5 Communicate the 2 days Fri Mon
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
registration as well as
scheduling processes 4/5/19 4/8/19
2 Schedule the training
activities 14 days Tue
4/9/19
Fri
4/26/19
2.1
Working with the help
desk for defining
requirements throughout
training
3 days Tue
4/9/19
Thu
4/11/19
2.2
The employees
complete registration
process
6 days
Fri
4/12/1
9
Fri
4/19/19
2.3
Remind the
employees for upcoming
classes
5 days
Mon
4/22/1
9
Fri
4/26/19
3 Contract the project
trainers 17 days
Mon
4/29/1
9
Tue
5/21/19
3.1 Set up the training
session 3 days
Mon
4/29/1
9
Wed
5/1/19
3.2 Conduct a training
with the trainer 5 days Thu
5/2/19
Wed
5/8/19
3.3 Print and share the
training materials 3 days Thu
5/9/19
Mon
5/13/19
3.4 Record the training of
the employees 6 days
Tue
5/14/1
9
Tue
5/21/19
4 Hold the training
sessions 10 days
Wed
5/22/1
9
Tue
6/4/19
4.1
Development and
distribution of the training
evaluations
4 days
Wed
5/22/1
9
Mon
5/27/19
4.2 Review the training 2 days Tue Wed
scheduling processes 4/5/19 4/8/19
2 Schedule the training
activities 14 days Tue
4/9/19
Fri
4/26/19
2.1
Working with the help
desk for defining
requirements throughout
training
3 days Tue
4/9/19
Thu
4/11/19
2.2
The employees
complete registration
process
6 days
Fri
4/12/1
9
Fri
4/19/19
2.3
Remind the
employees for upcoming
classes
5 days
Mon
4/22/1
9
Fri
4/26/19
3 Contract the project
trainers 17 days
Mon
4/29/1
9
Tue
5/21/19
3.1 Set up the training
session 3 days
Mon
4/29/1
9
Wed
5/1/19
3.2 Conduct a training
with the trainer 5 days Thu
5/2/19
Wed
5/8/19
3.3 Print and share the
training materials 3 days Thu
5/9/19
Mon
5/13/19
3.4 Record the training of
the employees 6 days
Tue
5/14/1
9
Tue
5/21/19
4 Hold the training
sessions 10 days
Wed
5/22/1
9
Tue
6/4/19
4.1
Development and
distribution of the training
evaluations
4 days
Wed
5/22/1
9
Mon
5/27/19
4.2 Review the training 2 days Tue Wed
evaluation 5/28/1
9 5/29/19
4.3 Updating the training
materials 4 days
Thu
5/30/1
9
Tue
6/4/19
POTENTIAL ISSUES OR CONSTRAINTS:
* When the project resources are not available, then there will be an increase in
delivery time. It can lead to increase in project cost.
* When the quality of project deliverables not meet, then more human resources are
required. It can increase in project cost and increase in project delivery time.
* When the scope creep is happened in the project, it will result to increase in time, cost
and human resources. It will reduce the project quality and increase in rise of delivery
of products.
COMPLETION CRITERIA:
* Customer satisfaction level should be meeting with the project requirements.
* Decrease turnover rate by having healthy work environment.
* Improve the productivity as well as enhance the morale plus culture among the
employees.
* Providing training as well as development throughout using training manuals.
9 5/29/19
4.3 Updating the training
materials 4 days
Thu
5/30/1
9
Tue
6/4/19
POTENTIAL ISSUES OR CONSTRAINTS:
* When the project resources are not available, then there will be an increase in
delivery time. It can lead to increase in project cost.
* When the quality of project deliverables not meet, then more human resources are
required. It can increase in project cost and increase in project delivery time.
* When the scope creep is happened in the project, it will result to increase in time, cost
and human resources. It will reduce the project quality and increase in rise of delivery
of products.
COMPLETION CRITERIA:
* Customer satisfaction level should be meeting with the project requirements.
* Decrease turnover rate by having healthy work environment.
* Improve the productivity as well as enhance the morale plus culture among the
employees.
* Providing training as well as development throughout using training manuals.
APPROVALS:
Signature
Department Sponsor's signature Date
Customer Sponsor’s signature Date
Project Manager's signature Date
Signature
Department Sponsor's signature Date
Customer Sponsor’s signature Date
Project Manager's signature Date
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
BIBLIOGRAPHY
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John Wiley
& Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E. W., & Gray, C. F. (2017). Project management: The managerial process. McGraw-
Hill Education.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Turner, R. (2016). Gower handbook of project management. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
1.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John Wiley
& Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E. W., & Gray, C. F. (2017). Project management: The managerial process. McGraw-
Hill Education.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Turner, R. (2016). Gower handbook of project management. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
1.
APPENDIX 1: BUDGET RESOURCES:
* This project is a budget project and based on the project activities, the estimated budget for the project plan is:
Budget Item Notes & Assumptions Cost
Staffing Project manager, trainer, marketing and operation manager $17900
Office supplies Supplier $8000
Postage - $170
Training manuals Documents included guidelines of the training $200
Computers Number of computers are ten $5700
Audio recorders Number of audio recorders are five $800
Course materials Number of course materials are fifteen $900
Evaluations - $190
Transportation cost Pre-evaluation meeting, follow up meeting $1000
Projector Number of projectors are five $380
Total: $35,240
* This project is a budget project and based on the project activities, the estimated budget for the project plan is:
Budget Item Notes & Assumptions Cost
Staffing Project manager, trainer, marketing and operation manager $17900
Office supplies Supplier $8000
Postage - $170
Training manuals Documents included guidelines of the training $200
Computers Number of computers are ten $5700
Audio recorders Number of audio recorders are five $800
Course materials Number of course materials are fifteen $900
Evaluations - $190
Transportation cost Pre-evaluation meeting, follow up meeting $1000
Projector Number of projectors are five $380
Total: $35,240
APPENDIX 2: COMMUNICATION PLAN
Audience Audience Information
What we know about
them – their needs,
beliefs, etc.
Communication
Objective
What we want them to
know, do, say, think, etc.
Key Message
Therefore, we have to let them
know . . .
Strategies
How to let them
know
Who Whe
n
Evaluation
Outcome
Accountable
Project
team
members
Planning of the
project work
Prefer to review the
final approved
documents of the
project
Final project activities
which are followed
Project
scheduling
plan in Email
Proje
ct
Mana
ger
Week
ly
basis
Meeting with
project deadline
Project
team
members
Preparation to start
the training
program
Scope of the project
evaluation
Managing the project
scope to meet with project
requirements
Scope
management
plan in Email
Proje
ct
mana
ger
Proje
ct
milest
ones
Meeting with
project scope
Financial
officer
Budget planning Prepare the project
budget
Financial planning based
on scheduled project
activities
Cost
management
plan in
Presentation
Proje
ct
Mana
ger
Week
ly
basis
Meeting with
the estimated
project budget
Consultation
Project
team
Final inception
report
Final project report Inform the project staffs
with detailed project
Presentation
and Email
Proje
ct
Final
projec
Meeting with
the project
Audience Audience Information
What we know about
them – their needs,
beliefs, etc.
Communication
Objective
What we want them to
know, do, say, think, etc.
Key Message
Therefore, we have to let them
know . . .
Strategies
How to let them
know
Who Whe
n
Evaluation
Outcome
Accountable
Project
team
members
Planning of the
project work
Prefer to review the
final approved
documents of the
project
Final project activities
which are followed
Project
scheduling
plan in Email
Proje
ct
Mana
ger
Week
ly
basis
Meeting with
project deadline
Project
team
members
Preparation to start
the training
program
Scope of the project
evaluation
Managing the project
scope to meet with project
requirements
Scope
management
plan in Email
Proje
ct
mana
ger
Proje
ct
milest
ones
Meeting with
project scope
Financial
officer
Budget planning Prepare the project
budget
Financial planning based
on scheduled project
activities
Cost
management
plan in
Presentation
Proje
ct
Mana
ger
Week
ly
basis
Meeting with
the estimated
project budget
Consultation
Project
team
Final inception
report
Final project report Inform the project staffs
with detailed project
Presentation
and Email
Proje
ct
Final
projec
Meeting with
the project
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
members evaluation mana
ger
t
phase
outcomes
Project
team
members
High level work
breakdown
structure
Final approval of project
milestones
Meeting with the project
deliverables
Daily email
as required
Proje
ct
mana
ger
Week
ly
meeti
ngs
Achievement of
the project
milestones
Project
stakeholder
s
Team
management
Identify the members
based on their skills and
experience
Purpose of the project
team members
Face-to-face
meetings
Proje
ct
mana
ger
Week
ly and
check
-in
meeti
ngs
Form the team
members
For Information
Project
team
members
Team management Hiring of the
members based
on project
requirements
Announcement of the
formation of project
team plus members
Email as
required
Project
manager
At the
completi
on of the
project
mileston
es
Human
resource
management
plan
Marketing
Manager
Analyze the current
market positions
Existing project
and market
issues
Research on the
market positions
related to other Pizza
Companies
Email and
presentation
Project
manager
Weekly
and
check-in
meetings
Development a
market report
Operation
Manager
Analyze the
organizational
internal operations
and functions
Existing project
and market
issues
Research on the
internal and external
market positions
Email and
presentation
Email and
presentation
Project
manager
Weekly
and
check-in
meetings
Decrease the
turnover rate
ger
t
phase
outcomes
Project
team
members
High level work
breakdown
structure
Final approval of project
milestones
Meeting with the project
deliverables
Daily email
as required
Proje
ct
mana
ger
Week
ly
meeti
ngs
Achievement of
the project
milestones
Project
stakeholder
s
Team
management
Identify the members
based on their skills and
experience
Purpose of the project
team members
Face-to-face
meetings
Proje
ct
mana
ger
Week
ly and
check
-in
meeti
ngs
Form the team
members
For Information
Project
team
members
Team management Hiring of the
members based
on project
requirements
Announcement of the
formation of project
team plus members
Email as
required
Project
manager
At the
completi
on of the
project
mileston
es
Human
resource
management
plan
Marketing
Manager
Analyze the current
market positions
Existing project
and market
issues
Research on the
market positions
related to other Pizza
Companies
Email and
presentation
Project
manager
Weekly
and
check-in
meetings
Development a
market report
Operation
Manager
Analyze the
organizational
internal operations
and functions
Existing project
and market
issues
Research on the
internal and external
market positions
Email and
presentation
Email and
presentation
Project
manager
Weekly
and
check-in
meetings
Decrease the
turnover rate
APPENDIX 3: RISK MANAGEMENT PLAN
Risk *Probability
of
Occurrence
*Impact of
Risk Event
**Composit
e Risk Index
Prevention, Mitigation, or Contingency
Strategy
Budget risk 5 4 20= Medium
high
There should be proper and accurate estimation
of project cost.
Schedule risk 4 4 16= Medium
high
There is proper scheduling of the project
activities based on project requirements.
Resource risk 4 5 20= Medium
high
There is hiring of more project resources based
on their skills and expertise.
Quality risk 3 3 9= Low The quality of the products and services are
checked and verified.
Inadequate training 3 4 12= Medium The training should be properly provided to the
employees and staffs to maintain the
organization’s turnover.
Scope creep 2 3 6= Low There should be required to meet project scope
and project objectives.
Management risk 1 2 3= Negligible The management should provide support to the
trainer regarding training.
*Where 1 = Low and 5 = High
**Risk Scores:
Under 5: negligible
5-10: low
10–15: medium
15-20: medium high
20–25: high
Risk *Probability
of
Occurrence
*Impact of
Risk Event
**Composit
e Risk Index
Prevention, Mitigation, or Contingency
Strategy
Budget risk 5 4 20= Medium
high
There should be proper and accurate estimation
of project cost.
Schedule risk 4 4 16= Medium
high
There is proper scheduling of the project
activities based on project requirements.
Resource risk 4 5 20= Medium
high
There is hiring of more project resources based
on their skills and expertise.
Quality risk 3 3 9= Low The quality of the products and services are
checked and verified.
Inadequate training 3 4 12= Medium The training should be properly provided to the
employees and staffs to maintain the
organization’s turnover.
Scope creep 2 3 6= Low There should be required to meet project scope
and project objectives.
Management risk 1 2 3= Negligible The management should provide support to the
trainer regarding training.
*Where 1 = Low and 5 = High
**Risk Scores:
Under 5: negligible
5-10: low
10–15: medium
15-20: medium high
20–25: high
1 out of 15
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.