Running head: DEVELOPING THE MBFSA APPLICATION BY GLOBEX Developing the MBFSA Application by Globex Name of the Student Name of the University Author note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1DEVELOPING THE MBFSA APPLICATION BY GLOBEX Table of Contents 1. The Gantt chart............................................................................................................................2 2. The High Level Work Breakdown Structure..............................................................................3 1.1 Milestones..............................................................................................................................0 1.2 Activities or Tasks.................................................................................................................1 1.3 Resource Assignments...........................................................................................................3 1.4 Estimates for each activity or task.........................................................................................5 1.5 Project Budget.......................................................................................................................6 Bibliography....................................................................................................................................8
3DEVELOPING THE MBFSA APPLICATION BY GLOBEX 2. The High Level Work Breakdown Structure (Figure 2: The Work Breakdown Structure for the Project) (Source: Created by author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
1.1 Milestones The milestones defined for each of the phases of the project could be defined as: 1. M1: Requirement Complete, which is defined under the ‘Phase 1: Requirement Gathering Phase’ 2. M2: Planning Phase Complete, which is defined under the ‘Create Logic Design’ phase. 3.M3:DevelopmentPhaseComplete,whichisdefinedunderthe‘Project Implementation’ phase. 4. M4: Deploy Phase Complete, which is defined under the ‘Project Deployment’ phase. 5. Release Team, which is defined under the ‘Project Handover’ phase.
1DEVELOPING THE MBFSA APPLICATION BY GLOBEX 1.2 Activities or Tasks
2DEVELOPING THE MBFSA APPLICATION BY GLOBEX The different phases or activities defined within the project are described as: 1.Phase 1: Requirement Gathering Phase– In this phase, each of the requirements would be described for the project. During this phase, each of the requirements would be collected from the external people and thus a proper form of analysis would be generated for the development team to develop the application in a planned manner. 2.Planning and Designing– During the phase, a proper analysis would be generated from the previous phases. This would help the development team to plan and design the aspects for the MBFSA. During the phase, the design of the application would be done. 3.Phase 2: Development of MBFSA– During this phase, the software developers would develop the application. The software developers would develop the application by making use of the proper kind of resources. During the development of the application, the software developers and other concerned member involved within the project would help in developingtheapplication.Therequirementofthefarmersshouldbetakenintowide consideration. This would also help the teams in bringing the best kind of application for the farmers. 4.Project Deployment– After the application has been developed, the project would be deployed for the use of the farmers. The application would be highly helpful for the farmers in order to measure the different aspects. 5.Project Handover– After a proper kind of feedback from the deployment of the application, the project would be made handover the entire group of farmers. The farmers would be provided with reports based on using the application. This would highly help the farmers in making use of the systems developed by Globex,
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4DEVELOPING THE MBFSA APPLICATION BY GLOBEX 1.3 Resource Assignments IDTask Mode Task Name 0Developing the MBFSA Project by Globex 1Phas e 1: Requir em ent Gather ing Phas e 2Preparing of Business Case 3Requirement Gathering 4Develop Scope Management Plan 5Develop Project Management Plan 6Perform Initial Risk Assessment 7Initial Application Test Planning 8Develop Quality Plan 9M1: Requirement Complete 10Planning and Des igning 11Creating Conceptual Design 12Cr eate Login Des ign 13LG1 Weather Information System 14LG1 Market Information System 15F1 Farmer management System 16WM1 Wholesale Management System 17Create Implementation Plan 18Create Contengency Plan 19M2: Planning Phase Complete 20Phas e 2: Developm ent of MBFSA 21Create Database 22Make Prototype 23Excute Project Management Plan 24Pr oject Im plem entation 25LG2 Weather Information System 26LG2 Market Information System 27F2 Farmer management System 28WM2 Wholesale Management System 29Data Entry 30Develop Media Content 31Code Review 32Prepare Unit Test 33Developed Application Verification 34Create Training Materials 35M3: Development Phase Complete 36Pr oject Deploym ent 37Finalise Implementation Plan 38Finalise Contingency Plan 39Prepare for Deployment 40Deploy Application 41M4: Deploy Phase Complete 42Pr oject Handover 43Conduct-Post Project Review Meeting 44Prepare Project Handover Documents 45Conduct Performance Recognition 46Prepare Feedback For Team 47Provide Feedback For Team 48Release Team Naren Reddy Ennam (Project Manager) Naren Reddy Ennam (Project Manager) Naren Reddy Ennam (Project Manager) Naren Reddy Ennam (Project Manager) Naren Reddy Ennam (Project Manager) Naren Reddy Ennam (Project Manager) Naren Reddy Ennam (Project Manager) 10-06 Vineeth Reddy Anugu (System Analyst) Naren Reddy Ennam(Project Manager)[25%],Vineeth Reddy Anugu(System Analyst) Naren Reddy Ennam(Project Manager)[25%],Vineeth Reddy Anugu(System Analyst) Naren Reddy Ennam(Project Manager)[25%],Vineeth Reddy Anugu(System Analyst) Naren Reddy Ennam(Project Manager)[25%],Vineeth Reddy Anugu(System Analyst) Naren Reddy Ennam (Project Manager) Naren Reddy Ennam (Project Manager) 28-06 Karumanchi Vamsi (Database Engineer) Revanth Reddy Andru(Software Engineer)[200%] Naren Reddy Ennam (Project Manager) Revanth Reddy Andru(Software Engineer)[200%] Revanth Reddy Andru(Software Engineer)[200%] Revanth Reddy Andru(Software Engineer)[200%] Revanth Reddy Andru(Software Engineer)[200%] Bhargav Reddy Ambati (Quality Assurance Engin Vineeth Reddy Anugu (System Analyst) Revanth Reddy Andru(Software Engineer Revanth Reddy Andru(Software Eng Bhargav Reddy Ambati (Qual Naren Reddy Ennam (Project Manager) 30-09 Naren Reddy Ennam (Project Manager Naren Reddy Ennam (Project Manage Revanth Reddy Andru(Software Eng Karumanchi Vamsi (Database Engi 07-10 Karumanchi Vamsi (Database Eng Naren Reddy Ennam (P Naren Reddy Enna Naren Reddy Enn Naren Reddy En 01-11 WTFSSMTWTFSSMTWTFSSMTWTFSS 22 Apr '1913 May '1903 Jun '1924 Jun '1915 Jul '1905 Aug '1926 Aug '1916 Sep '1907 Oct '1928 Oct '19
5DEVELOPING THE MBFSA APPLICATION BY GLOBEX The different people and resource that would be assigned to each of the phases of the project are defined as follows: Name of Resources Vineeth Reddy Anugu (System Analyst) Naren Reddy Ennam (Project Manager) Revanth Reddy Andru (Software Engineer) Karumanchi Vamsi (Database Engineer) Bhargav Reddy Ambati (Quality Assurance Engineer) Training Software Transport
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
6DEVELOPING THE MBFSA APPLICATION BY GLOBEX 1.4 Estimates for each activity or task
7DEVELOPING THE MBFSA APPLICATION BY GLOBEX 1.5 Project Budget
8DEVELOPING THE MBFSA APPLICATION BY GLOBEX The entire phase of the project would be completed within an estimated budget of AUD $ 480,600. This cost includes each of the costs that have been incurred for the project by making use of the resources.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
9DEVELOPING THE MBFSA APPLICATION BY GLOBEX Bibliography Baig, M. M., GholamHosseini, H., & Connolly, M. J. (2015). Mobile healthcare applications: systemdesignreview,criticalissuesandchallenges.Australasianphysical& engineering sciences in medicine,38(1), 23-38. Sopegno, A., Calvo, A., Berruto, R., Busato, P., & Bocthis, D. (2016). A web mobile application for agricultural machinery cost analysis.Computers and electronics in agriculture,130, 158-168. Williams, V., Price, J., Hardinge, M., Tarassenko, L., & Farmer, A. (2014). Using a mobile health application to support self-management in COPD: a qualitative study.Br J Gen Pract,64(624), e392-e400. Xin, J., & Zazueta, F. (2016). Technology trends in ICT–towards data-driven, farmer-centered andknowledge-basedhybridcloudarchitecturesforsmartfarming.Agricultural Engineering International: CIGR Journal,18(4), 275-279.